Construction of sanitary sewage system in Michałów – Grabin – stage I, Gm. Nieporęt (Q85479)

From EU Knowledge Graph
Revision as of 20:55, 30 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif de l’investissement est la construction d’un réseau d’assainissement sanitaire avec des succursales à la frontière immobilière à Przyrodnicza, Kwiatowa, Kastanowa et Przyleśna rues Michałów-Grabina, municipalité de Nieporęt et son inclusion dans ul. Ornecka à Varsovie. Le projet prévu consistera en la construction de canalisations d’égouts, de trois stations de pompage des eaux usées (et de reconstruction d’une station de pompage) ain...)
Jump to navigation Jump to search
Project Q85479 in Poland
Language Label Description Also known as
English
Construction of sanitary sewage system in Michałów – Grabin – stage I, Gm. Nieporęt
Project Q85479 in Poland

    Statements

    0 references
    3,678,921.84 zloty
    0 references
    882,941.24 Euro
    13 January 2020
    0 references
    4,328,143.35 zloty
    0 references
    1,038,754.4 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 April 2016
    0 references
    31 December 2019
    0 references
    GMINA NIEPORĘT
    0 references
    0 references

    52°25'23.9"N, 21°2'7.8"E
    0 references
    Przedmiotem inwestycji jest budowa sieci kanalizacji sanitarnej z odgałęzieniami do granicy nieruchomości w ulicach Przyrodniczej, Kwiatowej, Kasztanowej i Przyleśnej w Michałowie-Grabinie, Gmina Nieporęt i włączenia jej do ul. Orneckiej w Warszawie. Planowane przedsięwzięcie polegać będzie na budowie rurociągów kanalizacji sanitarnej grawitacyjnej, trzech przepompowni ścieków (oraz przebudowie jednej pompowni) wraz z zalicznikową linią nn oraz rurociągów tłocznych. Do projektowanej sieci włączony zostanie istniejący system kanalizacji sanitarnej z osiedla Grabina. Ponadto w ramach projektu rozbudowany zostanie inteligentny system SCADA. W wyniku realizacji inwestycji zwiększy się stopień wyposażenia aglomeracji Warszawa w system kanalizacji zgodnie w wymogami dyrektywy 91/271/EWG w sprawie oczyszczania ścieków komunalnych. Powstanie łącznie około 5,15 km sieci kanalizacji sanitarnej, z której korzystać będzie około 440 osób. (Polish)
    0 references
    The subject of the investment is the construction of a sanitary sewerage network with branches to the property border in the streets of Przyrodnicza, Kwiatowa, Kastanowa and Przylesna in Michałów-Grabin, Nieporęt commune and its inclusion in ul. Ornecka in Warsaw. The planned project will consist of the construction of pipelines of sanitary gravity sewage system, three sewage pumping plants (and reconstruction of one pumping plant) together with the advance line nn and press pipelines. The existing sanitary sewage system from the Grabina estate will be included in the planned network. In addition, the project will expand the intelligent SCADA system. As a result of the investment, the level of equipment of Warsaw agglomeration in the sewage system will be increased in accordance with the requirements of Directive 91/271/EEC on urban waste water treatment. A total of 5.15 km of sanitary sewage system will be built, which will be used by around 440 people. (English)
    14 October 2020
    0 references
    L’objectif de l’investissement est la construction d’un réseau d’assainissement sanitaire avec des succursales à la frontière immobilière à Przyrodnicza, Kwiatowa, Kastanowa et Przyleśna rues Michałów-Grabina, municipalité de Nieporęt et son inclusion dans ul. Ornecka à Varsovie. Le projet prévu consistera en la construction de canalisations d’égouts, de trois stations de pompage des eaux usées (et de reconstruction d’une station de pompage) ainsi que d’une ligne de passage nn et de canalisations de vidange. Le système d’assainissement existant du domaine de Grabin sera intégré au réseau prévu. En outre, le projet développera un système SCADA intelligent. À la suite de cet investissement, le niveau d’équipement de l’agglomération de Varsovie d’un système d’assainissement conformément aux exigences de la directive 91/271/CEE relative au traitement des eaux urbaines résiduaires sera augmenté. Un total d’environ 5,15 km de réseau d’assainissement sanitaire sera mis en place, qui sera utilisé par environ 440 personnes. (French)
    30 November 2021
    0 references

    Identifiers

    POIS.02.03.00-00-0251/16
    0 references