Water and sewage management in the Green Community – stage IV (Q85458)

From EU Knowledge Graph
Revision as of 20:54, 30 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Projet mis en œuvre dans les limites de l’agglomération de Cracovie avec une taille de 918 288 EH dans les villes de Brzozówka, Bibice, Wola Zachariaszowska, Owczary, Zielonki, Bosutów, Grębynice, Garlica Murowana, Januszowice, Przybysławice, Węgrzce et Batowice situées dans la municipalité de Zielonka. Le champ d’application comprend: — construction d’un réseau d’assainissement sanitaire d’une longueur d’environ 32,75 km — construction d’un rés...)
Jump to navigation Jump to search
Project Q85458 in Poland
Language Label Description Also known as
English
Water and sewage management in the Green Community – stage IV
Project Q85458 in Poland

    Statements

    Q2524466 (Deleted Item)
    0 references
    0 references
    17,546,108.4 zloty
    0 references
    4,211,066.02 Euro
    13 January 2020
    0 references
    20,642,480.48 zloty
    0 references
    4,954,195.32 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    30 June 2016
    0 references
    31 December 2022
    0 references
    GMINA ZIELONKI
    0 references
    0 references

    50°7'2.6"N, 19°55'14.5"E
    0 references
    Projekt realizowany w granicach aglomeracji Kraków o wielkości 918 288 RLM w miejscowościach Brzozówka, Bibice, Wola Zachariaszowska, Owczary, Zielonki, Bosutów, Grębynice, Garlica Murowana, Januszowice, Przybysławice, Węgrzce i Batowice położonych na terenie Gminy Zielonki. Zakres obejmuje: - budowę sieci kanalizacji sanitarnej o długości około 32,75 km - budowę sieci kanalizacji deszczowej o długości około 1,30 km - budowę sieci wodociągowej o długości 1,73 km - wymianę sieci wodociągowej, wykonanie spinek i przepięć sieci wodociągowej o długości 0,92 km - wymianę niesprawnych hydrantów na sieci wodociągowej - wykonanie sieciowych punktów pomiarowych na sieci wodociągowej wraz z transmisją danych będących częścią rozbudowy systemu monitoringu – 6 punktów - modernizację Stacji Uzdatniania Wody w Batowicach - dostawę samochodu specjalistycznego do czyszczenia sieci kanalizacyjnej Liczba nowych użytkowników sieci kanalizacyjnej, którzy przyłączą się do sieci w wyniku realizacji projektu - 2 686 RLM. Liczba nowych użytkowników sieci wodociągowej, którzy przyłączą się do sieci w wyniku realizacji projektu – 45 Mk. (Polish)
    0 references
    The project is carried out within the limits of the Kraków agglomeration of 918 288 RLM in Brzozówka, Bibice, Wola Zachariaszowska, Owczary, Zielonki, Bosutów, Grębynice, Garlica Murowana, Januszowice, Przybysławice, Węgrzce and Batowice located in Zielonka commune. The scope includes: — construction of a sanitary sewerage network with a length of about 32.75 km – construction of a rainwater sewage system with a length of about 1.30 km – construction of a water supply network with a length of 1.73 km – replacement of the water supply network, execution of network measuring points on the water supply network together with the transmission of data which are part of the extension of the monitoring system – 6 points – modernisation of the sewer system – the completion of the network of the water supply network, which are part of the extension of the monitoring system – 6 points – modernisation of the Batalitnia Water Station. Number of new users of the water supply network to join the network as a result of the project – 45 Mk. (English)
    14 October 2020
    0 references
    Projet mis en œuvre dans les limites de l’agglomération de Cracovie avec une taille de 918 288 EH dans les villes de Brzozówka, Bibice, Wola Zachariaszowska, Owczary, Zielonki, Bosutów, Grębynice, Garlica Murowana, Januszowice, Przybysławice, Węgrzce et Batowice situées dans la municipalité de Zielonka. Le champ d’application comprend: — construction d’un réseau d’assainissement sanitaire d’une longueur d’environ 32,75 km — construction d’un réseau d’eau pluviale d’une longueur d’environ 1,30 km — construction d’un réseau d’alimentation en eau d’une longueur de 1,73 km — remplacement du réseau d’approvisionnement en eau, construction de clips et de surtensions du réseau d’alimentation en eau de 0,92 km de long — remplacement des bouches d’eau inefficaces sur le réseau d’alimentation en eau — construction de points de mesure du réseau d’approvisionnement en eau, ainsi que de transmission de données dans le cadre de l’extension du système de surveillance — 6 points — modernisation de la station de traitement de l’eau de Batowice — livraison d’un véhicule spécialisé pour le nettoyage du réseau d’égouts Le nombre de nouveaux utilisateurs du réseau d’égouts reliera le réseau d’égouts. Nombre de nouveaux utilisateurs du réseau d’approvisionnement en eau qui rejoindront le réseau à la suite de la mise en œuvre du projet — 45 Mk. (French)
    30 November 2021
    0 references

    Identifiers

    POIS.02.03.00-00-0217/16
    0 references