Thermal modernisation of buildings of Warmia-Mazury Voivodship Environmental Protection Inspectorate at ul. 12/13 Osińskiego in Olsztyn and ul. Warsaw insurgents 10 in Elbląg (Q84472)
Jump to navigation
Jump to search
Project Q84472 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of buildings of Warmia-Mazury Voivodship Environmental Protection Inspectorate at ul. 12/13 Osińskiego in Olsztyn and ul. Warsaw insurgents 10 in Elbląg |
Project Q84472 in Poland |
Statements
1,260,287.43 zloty
0 references
1,482,691.1 zloty
0 references
85.0 percent
0 references
1 December 2017
0 references
31 December 2020
0 references
WARMIŃSKO-MAZURSKI WOJEWÓDZKI INSPEKTOR OCHRONY ŚRODOWISKA W OLSZTYNIE
0 references
Celem projektu jest termomodernizacja dwóch budynków pozostających w trwałym zarządzie WIOŚ w Olsztynie. Zakres geograficzny: Budynki zlokalizowane są w województwie Warmińsko-Mazurskim w powiecie olsztyńskim i elbląskim. Pierwszy budynek (budynek Olsztyn) zlokalizowany jest przy ul. Księdza Wacława Osińskiego 12/13 w Olsztynie [współrzędne geograficzne N 53° 46' 16.878''; E 20° 28' 28.734'']. Drugi budynek (budynek Elbląg) zlokalizowany jest przy ul. Powstańców Warszawskich 10 w Elblągu [współrzędne geograficzne N 54° 9' 43.543''; E 19° 24' 3.515'']. Budynek Olsztyn wybudowany w 1966 r. - o wysokości nieznacznie przekraczającej 12 m. Budynek obecnie przeznaczony jako budynek administracyjny. Posiada duży potencjał w zakresie podniesienia efektywności energetycznej. Zakres planowanych prac: 1. Docieplenie stropodachu wełną mineralną 26 cm; 2. Wymiana okien zewnętrznych z ramami PCV, na okna o współczynniku nie większym niż 0,9 W/m2K, wraz z obróbką i niezbędnymi elementami; 3. Wymiana drzwi głównych, bocznych i do piwnicy na drzwi o współczynniku nie większym niż 1,3 W/m2K; 4. Instalacja paneli fotowoltaicznych o mocy 6 kW na dachu budynku; 5. Wymiana oświetlenia na typ LED; 6. Montaż wentylacji mechanicznej z odzyskiem ciepła; 7. Instalacja liczników zapewniających pomiar efektów modernizacji w związku z instalacją PV. Budynek Elbląg wybudowany w 1905 r. - o wysokości nieprzekraczającej 12 m. Zakres planowanych prac: 1. Ocieplenie ścian zewnętrznych i ścian w warstwie przyziemia; 2. Docieplenie dachu oraz ścian na poddaszu; 3. Wykonanie izolacji przeciwwilgociowej ścian fundamentowych; 4. Wykonanie ocieplenia i izolacji przeciwwilgociowej tak aby współczynniki przenikania ciepła spełniały wartości poniżej granicznych, określonych przez obowiązujące WT; 5.wymiana okien zewnętrznych z ramami PCV, okien w piwnicy i połaciowych 6. wymiana drzwi zew. i balkonowych, 7. wymiana oświetlenia na typ LED; 8. montaż wentylacji mechanicznej z odzysk. ciepła; 9. instalacja liczn (Polish)
0 references
The aim of the project is to thermally modernise two buildings remaining in the permanent management of WIOŚ in Olsztyn. Geographical scope: The buildings are located in Warmińsko-Mazurskie Voivodeship in Olsztyn and Elbląskie districts. The first building (the Olsztyn building) is located at ul. Priest Wenceslas Osińskiego 12/13 in Olsztyn [geographical coordinates N 53° 46′ 16.878″; E 20° 28′ 28.734″]. The second building (the Elbląg building) is located on the street. Warsaw insurgents 10 in Elbląg [geographical coordinates N 54° 9′ 43.543″; E 19° 24′ 3.515″]. The Olsztyn building was built in 1966 – with a height slightly above 12 m. The building is currently designed as an administrative building. It has great potential to improve energy efficiency. Scope of planned work: 1. Warming of strophode with mineral wool 26 cm; 2. Replacement of external windows with PVC frames for windows with a coefficient of not more than 0,9 W/m2K, including machining and necessary elements; 3. Replacement of service doors, side doors and basement doors with a coefficient of not more than 1,3 W/m2K; 4. Installation of 6 kW photovoltaic panels on the roof of a building; 5. Replacement of lighting to LED type; 6. Installation of mechanical ventilation with heat recovery; 7. Installation of meters to measure the effects of modernisation in connection with the PV installation. Elbląg building built in 1905 – with a height not exceeding 12 m. Scope of planned works: 1. Warming of the outer walls and walls in the ground layer; 2. Warming of the roof and walls in the attic; 3. Wet insulation of the foundation walls; 4. Making insulation and damp insulation so that the heat transfer coefficients meet the values below the limits specified by the applicable WT; 5.exchange of external windows with PVC frames, windows in cellar and tile 6. replacement of call and balcony doors, 7. replacement of lighting for LED type; 8. mounting of mechanical ventilation with heat recovery; 9. Installation of multiples (English)
14 October 2020
0 references
L’objectif du projet est de thermomoderniser les deux bâtiments restant dans la gestion permanente du WIOŚ à Olsztyn. Champ d’application géographique: Les bâtiments sont situés dans la voïvodie de Warmińsko-Mazurskie dans les districts d’Olsztyn et d’Elbląg. Le premier bâtiment (le bâtiment Olsztyn) est situé à ul. Prêtre Wenceslas Osiński 12/13 à Olsztyn [coordonnées géographiques no 53° 46′ 16.878″; E 20° 28′ 28.734″]. Le deuxième bâtiment (bâtiment Elbląg) est situé à ul. Insurgés de Varsovie 10 à Elbląg [coordonnées géographiques no 54° 9′ 43.543″; E 19° 24′ 3.515″]. Bâtiment Olsztyn construit en 1966 — d’une hauteur d’un peu plus de 12 m. Le bâtiment est actuellement conçu comme un bâtiment administratif. Elle a un grand potentiel pour accroître l’efficacité énergétique. Portée des travaux prévus: 1. Réchauffement du toit avec de la laine minérale 26 cm; 2. Remplacement des fenêtres extérieures par des cadres en PVC, avec un coefficient n’excédant pas 0,9 W/m2K, y compris le traitement et les éléments nécessaires; 3. Remplacer les portes de service, les portes latérales et les portes du sous-sol par un coefficient n’excédant pas 1,3 W/m2K; 4. Installation de panneaux photovoltaïques de 6 kW sur le toit du bâtiment; 5. Remplacement de l’éclairage par le type LED; 6. Installation d’une ventilation mécanique avec récupération de chaleur; 7. Installation de compteurs pour mesurer les effets d’adaptation en liaison avec l’installation de PV. Bâtiment Elbląg construit en 1905 — d’une hauteur n’excédant pas 12 m. L’étendue des travaux envisagés: 1. Le réchauffement des murs extérieurs et des murs dans la couche de terre; 2. Réchauffement du toit et des murs dans le grenier; 3. Mise en œuvre de l’isolation anti-humidité des murs de fondation; 4. Le réchauffement et l’étanchéité à l’humidité de sorte que les coefficients de transfert de chaleur respectent les limites fixées par le WT applicable; 5. échange de fenêtres extérieures avec des cadres en PVC, fenêtres en sous-sol et poteaux 6. remplacement des portes extérieures et de balcon, 7. remplacement de l’éclairage avec le type LED; 8. assemblage mécanique de ventilation avec récupération de chaleur; 9. Nombreuse installation (French)
30 November 2021
0 references
Identifiers
POIS.01.03.01-00-0013/17
0 references