DEVELOPMENT OF WATER AND SEWAGE MANAGEMENT IN NIEPOŁOMICE COMMUNE (Q85327)

From EU Knowledge Graph
Revision as of 16:35, 30 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Portée du projet: — construction d’une station d’épuration des eaux usées Q = 16667 EH à Podłęz (technologie MBR), — construction d’un réseau d’assainissement de 14,1 km, — modernisation du réseau d’assainissement de 2,2 km (coût non éligible), — construction d’un réseau d’alimentation en eau de 8,4 km, — modernisation du réseau d’approvisionnement en eau 0,7 km, — modernisation du réservoir d’eau propre à Zagórze — Kawcze, un réservoir d’eau pr...)
Jump to navigation Jump to search
Project Q85327 in Poland
Language Label Description Also known as
English
DEVELOPMENT OF WATER AND SEWAGE MANAGEMENT IN NIEPOŁOMICE COMMUNE
Project Q85327 in Poland

    Statements

    0 references
    26,680,332.46 zloty
    0 references
    6,403,279.79 Euro
    13 January 2020
    0 references
    31,388,626.43 zloty
    0 references
    7,533,270.34 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2021
    0 references
    "WODOCIĄGI NIEPOŁOMICE" SP. Z O. O.
    0 references
    0 references
    0 references
    Zakres projektu: - budowa oczyszczalni ścieków Q = 16667 RLM w Podłężu (technologia MBR), - budowa kanalizacji sanitarnej 14,1 km, - modernizacja kanalizacji sanitarnej 2,2 km (koszt niekwalifikowany), - budowa sieci wodociągowej 8,4 km, - modernizacja sieci wodociągowej 0,7 km, - modernizacja zbiornika wody czystej w m. Zagórze - Kawcze, zbiornika wody czystej na terenie ist. ZUW w Podłężu, ujęcia wody podziemnej (studnia głębinowa), zbiornika wody czystej wraz z hydrofornią i rozdzielnią oraz przebudowa istniejącego zbiornika w miejscowości Zagórze, - system klasy GIS oraz model hydrauliczny wraz z urządzeniami do monitorowania parametrów sieci, - zakup samochodu z kamerą oraz agregatu. (Polish)
    0 references
    Scope of the project: — construction of sewage treatment plant Q = 16667 RLM in Podłęż (MBR technology), – construction of sanitary sewage system 14.1 km, – modernisation of sanitary sewage system 2.2 km (ineligible cost), – construction of a water supply network 8.4 km, – modernisation of the water supply network 0.7 km, – modernisation of clean water reservoir in Zagórze – Kacze, clean water reservoir in ist. ZUW in Podłęż, intake of underground water (deep well), clean water tank with hydro and switching room and reconstruction of the existing reservoir in Zagórze, – GIS class system and hydraulic model with network monitoring devices – purchase of a car with a camera and a unit. (English)
    14 October 2020
    0 references
    Portée du projet: — construction d’une station d’épuration des eaux usées Q = 16667 EH à Podłęz (technologie MBR), — construction d’un réseau d’assainissement de 14,1 km, — modernisation du réseau d’assainissement de 2,2 km (coût non éligible), — construction d’un réseau d’alimentation en eau de 8,4 km, — modernisation du réseau d’approvisionnement en eau 0,7 km, — modernisation du réservoir d’eau propre à Zagórze — Kawcze, un réservoir d’eau propre dans la région. ZUW à Podłęż, collecte d’eau souterraine (puits profonds), réservoir d’eau propre avec hydrophore et appareillage de commutation et reconstruction du réservoir existant à Zagórze, — système de classe SIG et modèle hydraulique avec dispositifs de surveillance des paramètres du réseau, — achat d’une voiture avec caméra et refroidisseur. (French)
    30 November 2021
    0 references

    Identifiers

    POIS.02.03.00-00-0097/17
    0 references