Reconstruction and extension of the sewage treatment plant in Rawicz (Q85157)

From EU Knowledge Graph
Revision as of 16:35, 30 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet porte sur la reconstruction et l’extension d’une station d’épuration existante afin de satisfaire aux exigences du règlement du ministre de l’environnement sur les conditions à remplir lors de l’évacuation des eaux usées dans ou dans le sol et sur les substances particulièrement nocives pour le milieu aquatique (Journal officiel) U. de 2014, point de l’ordre du jour. 1800). La partie mécanique, biologique et des boues de la station d’é...)
Jump to navigation Jump to search
Project Q85157 in Poland
Language Label Description Also known as
English
Reconstruction and extension of the sewage treatment plant in Rawicz
Project Q85157 in Poland

    Statements

    0 references
    17,509,785.37 zloty
    0 references
    4,202,348.49 Euro
    13 January 2020
    0 references
    20,599,747.5 zloty
    0 references
    4,943,939.4 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2020
    0 references
    GMINA RAWICZ
    0 references
    0 references
    0 references
    Projekt obejmuje przebudowę i rozbudowę istniejącej oczyszczalni ścieków w celu spełnienia wymogów rozporządzenia Ministra Środowiska w sprawie warunków, jakie należy spełnić przy wprowadzaniu ścieków do wód lub do ziemi oraz w sprawie substancji szczególnie szkodliwych dla środowiska wodnego (Dz. U. z 2014 r. poz. 1800). Przebudowana będzie część mechaniczna, biologiczna i osadowa oczyszczalni ścieków, dzięki czemu nastąpi: - zwiększenie przepustowości oczyszczalni ścieków z 7 000 m3/d do 7 800 m3/d, - poprawa oczyszczania ścieków w zakresie redukcji azotu, - zmniejszenie ładunku zanieczyszczeń pochodzących ze ścieków komunalnych wprowadzanych do środowiska oraz - poprawa gospodarowania osadami ściekowymi. Wskaźniki produktu: Liczba przebudowanych oczyszczalni ścieków komunalnych - 1 szt. Liczba oczyszczalni ścieków komunalnych wspartych w zakresie przeróbki osadów ściekowych - 1 szt. Wskaźniki rezultatu bezpośredniego: Wielkość ładunku ścieków poddanych ulepszonemu oczyszczaniu - 27 842 RLM Liczba dodatkowych osób korzystających z ulepszonego oczyszczania ścieków - 27 842 RLM Ilość suchej masy komunalnych osadów ściekowych poddawanych procesom przetwarzania - 0 tys. MG/rok (Polish)
    0 references
    The project includes the reconstruction and extension of the existing sewage treatment plant in order to meet the requirements of the Minister of the Environment Regulation on the conditions to be fulfilled when introducing waste water into or into the ground and on substances that are particularly harmful to the aquatic environment (Dz. U. of 2014, item. 1800. The mechanical, biological and sedimentary part of the sewage treatment plant will be rebuilt, thanks to which: — increase the capacity of waste water treatment plants from 7000 m³/d to 7800 m³/d, – improvement of waste water treatment in the scope of nitrogen reduction, – reduction of load of pollutants from municipal waste water introduced into the environment and – improvement of the management of sewage sludge. Output indicators: Number of reconstructed municipal waste water treatment plants – 1 pcs. Number of municipal waste water treatment plants supported by the treatment of sewage sludge – 1 pcs. Direct result indicators: Volume of waste water cargo undergoing improved treatment – 27 842 RLM Number of additional persons benefiting from improved waste water treatment – 27 842 RLM Number of dry matter municipal sewage sludge undergoing processing – 0 thousand. Mg/year (English)
    14 October 2020
    0 references
    Le projet porte sur la reconstruction et l’extension d’une station d’épuration existante afin de satisfaire aux exigences du règlement du ministre de l’environnement sur les conditions à remplir lors de l’évacuation des eaux usées dans ou dans le sol et sur les substances particulièrement nocives pour le milieu aquatique (Journal officiel) U. de 2014, point de l’ordre du jour. 1800). La partie mécanique, biologique et des boues de la station d’épuration sera reconstruite, ce qui entraînera: — augmenter la capacité de la station de traitement des eaux usées de 7 000 m³/j à 7 800 m³/j, — améliorer le traitement des eaux usées en termes de réduction de l’azote, — réduire la charge de pollution des eaux urbaines résiduaires entrant dans l’environnement et — améliorer la gestion des boues d’épuration. Indicateurs de réalisation: Nombre d’installations de traitement des eaux urbaines résiduaires reconstruites — 1 Nombre d’installations de traitement des eaux urbaines résiduaires bénéficiant d’un soutien dans le traitement des boues d’épuration — 1 Indicateurs de résultat direct: Volume de charge des eaux usées traitées avec un traitement amélioré — 27 842 EH Nombre de personnes supplémentaires bénéficiant d’un traitement amélioré des eaux usées — 27 842 EH Nombre de boues d’épuration traitées — 0 000. Mg/an (French)
    30 November 2021
    0 references

    Identifiers

    POIS.02.03.00-00-0002/16
    0 references