Modernisation of the 35B63 network water pump system in PGE GiEK S.A. Branch of Elektrociepłownia Kielce (Q84439)

From EU Knowledge Graph
Revision as of 16:35, 30 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): La modernisation des paramètres des pompes 35B63 vise à améliorer l’efficacité par rapport à son efficacité d’origine. L’investisseur s’attend à ce que l’équipement des pompes avec de nouveaux systèmes d’entraînement entraîne une augmentation de l’efficacité du pompage, l’ajustement du fonctionnement des pompes aux champs d’ajustement requis et la réduction de la demande d’électricité, ce qui se traduit en fin de compte par des économies d’énerg...)
Jump to navigation Jump to search
Project Q84439 in Poland
Language Label Description Also known as
English
Modernisation of the 35B63 network water pump system in PGE GiEK S.A. Branch of Elektrociepłownia Kielce
Project Q84439 in Poland

    Statements

    0 references
    1,050,000.0 zloty
    0 references
    252,000.0 Euro
    13 January 2020
    0 references
    1,400,000.0 zloty
    0 references
    336,000.0 Euro
    13 January 2020
    0 references
    75.0 percent
    0 references
    24 April 2018
    0 references
    30 April 2019
    0 references
    PGE ENERGIA CIEPŁA SPÓŁKA AKCYJNA
    0 references
    0 references
    0 references
    0 references
    Modernizacja parametrowa pomp 35B63 ma na celu podniesienie sprawności w stosunku do jej pierwotnej sprawności fabrycznej. Inwestor oczekuje, że wyposażenie pomp w nowe układy napędowe doprowadzi do wzrostu sprawności pompowania, dopasowania pracy pomp do wymaganych pól regulacji oraz obniżenia zapotrzebowania na moc elektryczną, co w efekcie końcowym przełoży się na oszczędność energii elektrycznej. Dodatkowo duże znaczenie przykłada się też do uzyskania wysokiej niezawodności pracy zmodernizowanych zespołów pompowych oraz zapewnienia odbiorcy ciągłości dostaw ciepła. Celem Projektu jest: - modernizacja pomp 35B63 z zastosowaniem nowych materiałów i technologii wykonania, co umożliwi poprawienie uzyskiwanych parametrów względem stanu fabrycznego; - wymiana istniejących silników pierścieniowych i współpracujących z nimi układów kaskad zaworowych na silniki klatkowe współpracujące z przemiennikami częstotliwości, które zostaną zrealizowane przez wykonanie układu zasilania, sterowania i regulacji pomp wody sieciowej NQC15AP101 i NQC25AP101 z silnikami 800 kW 690 V 50 Hz w oparciu o przemienniki częstotliwości. (Polish)
    0 references
    The parameter modernisation of 35B63 pumps is intended to increase efficiency in relation to its original factory efficiency. The investor expects the pumps to be equipped with new propulsion systems to increase the efficiency of pumping, adjust the operation of pumps to the required adjustment fields and reduce the demand for electrical power, resulting in savings in electricity. In addition, high importance is also attached to achieving high reliability of the operation of modernised pump units and ensuring the customer’s continuity of heat supply. The aim of the project is to: — modernisation of 35B63 pumps with the use of new materials and manufacturing technologies, which will allow to improve the obtained parameters in relation to the factory condition; — replacement of existing ring engines and their collaborative valve cascade systems for cage engines cooperating with frequency converters, which will be implemented by the supply, control and regulation of the NQC15AP101 and NQC25AP101 network water pumps with 800 kW 690 V 50 Hz engines based on frequency converters. (English)
    14 October 2020
    0 references
    La modernisation des paramètres des pompes 35B63 vise à améliorer l’efficacité par rapport à son efficacité d’origine. L’investisseur s’attend à ce que l’équipement des pompes avec de nouveaux systèmes d’entraînement entraîne une augmentation de l’efficacité du pompage, l’ajustement du fonctionnement des pompes aux champs d’ajustement requis et la réduction de la demande d’électricité, ce qui se traduit en fin de compte par des économies d’énergie. En outre, il est également important d’atteindre une grande fiabilité dans le fonctionnement des pompes modernisées et d’assurer la continuité de l’alimentation en chaleur du client. L’objectif du projet est de: — modernisation des pompes 35B63 avec l’utilisation de nouveaux matériaux et technologies de fabrication, ce qui permettra d’améliorer les paramètres obtenus par rapport à l’état de l’usine; — remplacement des moteurs à anneaux existants et des systèmes de cascade de vannes coopérants par des moteurs à cage coopérant avec des changeurs de fréquence, qui seront réalisés en exécutant un système d’alimentation, de commande et de commande des pompes à eau de secteur NQC15AP101 et NQC25AP101 par des moteurs de 800 kW 690 V 50 Hz basés sur des convertisseurs de fréquence. (French)
    30 November 2021
    0 references

    Identifiers

    POIS.01.02.00-00-0008/18
    0 references