Construction of a biomass boiler with a nominal capacity of 7 MW (Q84403)
Jump to navigation
Jump to search
Project Q84403 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a biomass boiler with a nominal capacity of 7 MW |
Project Q84403 in Poland |
Statements
4,718,700.0 zloty
0 references
11,784,000.0 zloty
0 references
40.04 percent
0 references
7 November 2017
0 references
28 February 2021
0 references
MIEJSKIE PRZEDSIĘBIORSTWO ENERGETYKI CIEPLNEJ SP. Z O.O. W NOWYM SĄCZU
0 references
Projekt polega na budowie nowego kotła wodnego z rusztem ruchomym o mocy cieplnej nominalnej 7 MW opalanego biomasą drzewną w istniejącym budynku kotłowni MILLENIUM I zlokalizowanej przy ulicy ul. Wiśniowieckiego 56 w Nowym Sączu ,której właścicielem jest Miejskie Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. w Nowym Sączu. W kotłowni MILLENIUM I zainstalowane są dwa kotły wodne WR 5. Łączna moc nominalna wszystkich eksploatowanych kotłów znajdujących się na terenie zakładu wynosi 79,661 MW. Kocioł na biomasę zostanie zlokalizowany w wolnej przestrzeni w budynku kotłowni Millenium I w którym jest zlokalizowany kocioł WR-5 oraz obejmie teren przyległy do tej kotłowni. Kocioł na biomasę objęty wnioskiem o dofinansowanie jest pierwszym etapem realizacji projektu inwestycyjnego, którego celem jest osiągnięcia przez sieć ciepłowniczą zasilaną z ciepłowni Millenium, statusu sieci cieplnej „efektywnej energetycznie. Drugim etapem tego projektu jest budowa wysokosprawnej kogeneracji opartej na silnikach gazowych i zasilanych gazem ziemnym. Projekt budowy kotła na biomasę jest jednak niezależny ekonomicznie i nie powiązany technologicznie z budową kogeneracji na paliwo gazowe. (Polish)
0 references
The project consists of the construction of a new water boiler with a mobile grate with a nominal heat output of 7 MW biomass-fired wood in the existing building of the boiler room MILLENIUM I located on street. Wiśniowiecki 56 in Nowy Sącz, which is owned by Miejskie Przedsiębiorstwo Energetyki Cieplna Spółka z o.o. in Nowy Sącz. Two water boilers WR 5 are installed in the boiler room MILLENIUM I. The total nominal capacity of all boilers operating on the premises shall be 79,661 MW. The biomass boiler will be located in a free space in the Millenium I boiler room in which the WR-5 boiler room is located and will cover the area adjacent to this boiler room. The biomass boiler covered by the application for funding is the first stage in the implementation of an investment project aimed at achieving the status of an energy-efficient heating network by the Millenium district heating network. The second stage of this project is the construction of high-efficiency cogeneration based on gas engines and powered by natural gas. However, the design of the biomass boiler is economically independent and not technologically linked to the construction of cogeneration for gaseous fuel. (English)
14 October 2020
0 references
Le projet consiste en la construction d’une nouvelle chaudière à eau à grille mobile d’une puissance thermique nominale de 7 MW alimentée à la biomasse boisée dans le bâtiment existant de la chaufferie MILLENIUM I située à ul. Wiśniowiecki 56 à Nowy Sącz, qui appartient à la municipalité Energetyka Cieplna Spółka z o.o. à Nowy Sącz. Deux chaudières WR 5 sont installées dans la chaufferie MILLENIUM I. La puissance nominale totale de toutes les chaudières fonctionnant sur le site est de 79,661 MW. La chaudière à biomasse sera située dans l’espace libre du bâtiment de chaudière du Millenium I où se trouve la chaudière WR-5 et couvrira la zone adjacente à cette chaufferie. La chaudière à biomasse faisant l’objet de la demande de financement est la première étape du projet d’investissement, dont l’objectif est d’atteindre le statut d’un réseau de chaleur «efficace sur le plan énergétique» par le réseau de chauffage urbain fourni par l’installation de chauffage urbain du Millenium. La deuxième étape de ce projet est la construction d’une cogénération à haut rendement basée sur des moteurs à gaz et alimentée au gaz naturel. Toutefois, le projet de construction d’une chaudière à biomasse est économiquement indépendant et n’est pas lié sur le plan technologique à la construction de la cogénération pour le combustible gazeux. (French)
30 November 2021
0 references