Construction of CHP plant in Minsk Mazowiecki (Q84890)

From EU Knowledge Graph
Revision as of 16:24, 30 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Ce projet concerne l’installation d’un système de cogénération au sein de la chaudière existante appartenant à PEC Sp. z o.o. à Minsk Mazowiecki. Suite à l’investissement, la chaufferie actuelle à Minsk Mazowiecki à ul. 1 PLM Varsovie 1 deviendra une centrale combinée de chaleur et d’électricité. Le projet suppose l’utilisation du gaz naturel comme combustible. L’électricité produite sera utilisée pour son propre usage et l’électricité excédenta...)
Jump to navigation Jump to search
Project Q84890 in Poland
Language Label Description Also known as
English
Construction of CHP plant in Minsk Mazowiecki
Project Q84890 in Poland

    Statements

    0 references
    8,911,870.0 zloty
    0 references
    2,138,848.8 Euro
    13 January 2020
    0 references
    21,216,380.0 zloty
    0 references
    5,091,931.2 Euro
    13 January 2020
    0 references
    42.0 percent
    0 references
    29 January 2018
    0 references
    30 June 2020
    0 references
    PRZEDSIĘBIORSTWO ENERGETYKI CIEPLNEJ SPÓŁKA Z OGRANICZONA ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references
    0 references
    Niniejsze przedsięwzięcie związane jest z instalacją układu kogeneracji w ramach istniejącej kotłowni należącej do PEC Sp. z o. o. w Mińsku Mazowieckim. W wyniku realizacji inwestycji obecna kotłownia funkcjonująca w Mińsku Mazowieckim przy ul. 1 PLM Warszawa 1 przekształci się w elektrociepłownię. W projekcie założono zastosowanie gazu ziemnego jako paliwa. Produkowana energia elektryczna będzie wykorzystywana na potrzeby własne, a jej nadmiar zostanie sprzedany do Zakładu Energetycznego. Projekt będzie realizowany w województwie mazowieckim, powiecie mińskim, mieście Mińsk Mazowiecki, przy ul. 1PLM Warszawa 1, na działce o numerze geodezyjnym 2476/3, w obrębie ewidencyjnym 0001 Mińsk Mazowiecki. (Polish)
    0 references
    This project is connected with the installation of the cogeneration system within the existing boiler room belonging to PEC Sp. z o. o. in Minsk Mazowiecki. As a result of the investment, the current boiler room operating in Minsk Mazowiecki on ul. 1 PLM Warszawa 1 will be transformed into a CHP plant. The project assumes the use of natural gas as fuel. The electricity produced will be used for own use and its excess will be sold to the Energy Plant. The project will be implemented in Mazowieckie Voivodeship, Minsk County, the city of Mińsk Mazowiecki, on ul. 1PLM Warszawa 1, on land with geodesic number 2476/3, within the registration area 0001 Mińsk Mazowiecki. (English)
    14 October 2020
    0 references
    Ce projet concerne l’installation d’un système de cogénération au sein de la chaudière existante appartenant à PEC Sp. z o.o. à Minsk Mazowiecki. Suite à l’investissement, la chaufferie actuelle à Minsk Mazowiecki à ul. 1 PLM Varsovie 1 deviendra une centrale combinée de chaleur et d’électricité. Le projet suppose l’utilisation du gaz naturel comme combustible. L’électricité produite sera utilisée pour son propre usage et l’électricité excédentaire sera vendue à la centrale électrique. Le projet sera mis en œuvre dans la voïvodie de Mazowieckie, district de Minsk, la ville de Minsk Mazowiecki, à ul. 1PLM Varsovie 1, sur terrain avec le numéro géodésique 2476/3, dans la zone d’enregistrement 0001 Minsk Mazowiecki. (French)
    30 November 2021
    0 references

    Identifiers

    POIS.01.06.01-00-0020/18
    0 references