8,073,381.39 zloty
0 references
9,498,095.76 zloty
0 references
85.0 percent
0 references
1 April 2019
0 references
31 March 2021
0 references
GMINA MIEJSKA STAROGARD GDAŃSKI
0 references
Zadanie 1.1. Budowa systemu kanalizacji deszczowej zbierającej wody opadowe w rejonie ul. Iwaszkiewicza do planowanego zbiornika retencyjnego Planowana inwestycja ma na celu odciążenie kanalizacji deszczowej w analizowanej zlewni oraz opóźnienie spływu powierzchniowego. Budowa nowego kolektora kanalizacji deszczowej, do którego przyłączona zostanie istniejąca sieć odwodnieniowa pozwoli na odprowadzenie wód opadowych i roztopowych do budowanego zbiornika retencyjnego. Zbiornik retencyjny przepływowy zostanie wyposażony w armaturę i system sterowania umożliwiające sterowanie odpływem. Sterowanie ma na celu zatrzymanie wód opadowych kierowanych do zbiornika w celu ich wykorzystania. W celu zagospodarowania wód opadowych na terenach inwestycyjnych oraz zmniejszenia dotychczasowych odpływów chwilowych systemu kanalizacji deszczowej funkcjonującej na terenie miasta Starogard Gdański przewidziano: zastosowanie retencjonowania wód deszczowych w otwartym zbiorniku (nowobudowanym), budowę nowych kanałów deszczowych, budowę nowych wpustów deszczowych, budowę podczyszczalni ścieków deszczowych wprowadzanych do odbiorników, przebudowę istniejącego rowu melioracyjnego, odtworzenie progów na odcinku ujściowym rowu melioracyjnego do rzeki Kochanki, budowę dodatkowych wylotów do odbiornika, instalację systemu sterowania odpływem ze zbiornika. Inwestycja obejmuje roboty budowlano-montażowe. Podstawowy zakres robót obejmuje: budowę nowych kanałów deszczowych o długości 1210 mb, budowę zbiornika retencyjnego przepływowego o pojemności 8600 m3, budowę urządzeń podczyszczających wody deszczowej odprowadzanych do odbiorników (2 szt separatorów lamelowych). Zbiornik retencyjny będzie w stanie pomieścić wody deszczowe w ilości maksymalnej ok. 8600 m3. Wody będą oczyszczane, a następnie wprowadzane do odbiorników. Oczyszczone wody zgromadzone w zbiorniku planuje się wykorzystać na potrzeby podlewania zieleni miejskiej i cele przeciwpożarowe. Zadanie zostało zaplanowane na podstawie inwentary (Polish)
0 references
Task 1.1. Construction of a rainwater drainage system collecting rainwater in the area of ul. Iwaszkiewicza to the planned storage tank The planned investment is intended to relieve the load of rainwater drainage in the analysed catchment area and delay the surface flow. The construction of a new rainwater manifold, to which the existing drainage network will be attached, will allow for drainage of rainwater and meltwater to the built reservoir. The flow retention tank will be equipped with a fitting and a control system to control the outflow. The control is designed to stop rainwater being directed to the reservoir in order to use them. In order to develop rainwater on investment areas and to reduce the current outflows of the rainwater drainage system operating in Starogard Gdański, the following are planned: application of rainwater retention in an open reservoir (new build), construction of new rain drains, construction of new rain drains, construction of sewage water treatment plants introduced into receivers, reconstruction of existing drainage ditch, reconstruction of thresholds on the drainage drainage section of the drainage ditch to the river Kochanki, construction of additional outlets for the receiver, installation of a drainage control system from the reservoir. The investment includes construction and assembly works. The basic scope of the works includes: construction of new rainwater canals with a length of 1210 mb, construction of a flow reservoir with a capacity of 8600 m³, construction of cleaning equipment for rainwater discharged to receivers (2 pieces of lamel separators). The storage tank will be able to accommodate rainwater in the maximum amount of approx. 8600 m³. The water will be purified and then fed into the receivers. The purified water stored in the reservoir is planned to be used for watering urban greens and fire-fighting purposes. The task was planned on the basis of inventory (English)
14 October 2020
0 references
Tâche 1.1. Construction d’un système d’eau de pluie collectant l’eau de pluie dans la zone d’ul. Iwaszkiewicza jusqu’au réservoir prévu L’investissement prévu vise à soulager le système de drainage pluvial dans le bassin hydrographique analysé et à retarder le ruissellement. La construction d’un nouveau collecteur d’eau de pluie, auquel le réseau de drainage existant sera raccordé, permettra de déverser les eaux de pluie et les eaux de fonte dans le réservoir en cours de construction. Le réservoir de rétention d’écoulement sera équipé d’un système d’ajustement et de commande pour contrôler le drain. La commande est conçue pour arrêter l’eau de pluie dirigée vers le réservoir pour utilisation. Afin de gérer l’eau de pluie dans les zones d’investissement et de réduire le drainage instantané actuel du système d’eau de pluie en activité dans la ville de Starogard Gdański: utilisation de la rétention d’eau de pluie dans un réservoir ouvert (nouvelle construction), construction de nouveaux conduits de pluie, construction de nouveaux drains de pluie, construction d’une station de traitement des eaux de pluie introduite dans les récepteurs, reconstruction du fossé de drainage existant, restauration des seuils à la section de sortie du fossé de drainage de la rivière Kochanka, construction de sorties supplémentaires au récepteur, installation d’un système de contrôle du drainage à partir du réservoir. L’investissement comprend les travaux de construction et d’assemblage. Le champ d’application de base des travaux comprend: construction de nouveaux conduits de pluie d’une longueur de 1210 mb, construction d’un réservoir de rétention d’écoulement d’une capacité de 8 600 m³, construction de purificateurs d’eau de pluie rejetés dans des récepteurs (2 séparateurs lamellaires). Le réservoir de rétention sera en mesure de retenir l’eau de pluie dans la quantité maximale d’environ. 8 600 m³. L’eau sera traitée puis introduite dans les récepteurs. L’eau purifiée stockée dans le réservoir devrait être utilisée à des fins d’arrosage de verdure urbaine et de lutte contre les incendies. La tâche a été planifiée sur la base d’un inventaire (French)
30 November 2021
0 references
Identifiers
POIS.02.01.00-00-0007/18
0 references