Construction of a new production plant for innovative cooling energy accumulators and their implementation on the market (Q82109)
Jump to navigation
Jump to search
Project Q82109 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a new production plant for innovative cooling energy accumulators and their implementation on the market |
Project Q82109 in Poland |
Statements
7,896,950.0 zloty
0 references
13,203,250.0 zloty
0 references
59.81 percent
0 references
1 November 2018
0 references
30 June 2020
0 references
MAR-BUD SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ BUDOWNICTWO SPÓŁKA KOMANDYTOWA
0 references
Projekt polega na budowie zakładu produkcyjnego w celu wdrożenia na rynek nowego produktu–innowacyjnego Akumulatora Energii Chłodu (ACH). Projekt stanowi inwestycję początkową. Planowany projekt jest efektem prac badawczo-rozwojowych przeprowadzonych na zlecenie Wnioskodawcy, w wyniku których dokonano dwóch zgłoszeń patentowych w dn. 30.03.2018r. Prace były realizowane w latach 2016-2017. Unikalne w skali świata cechy produktu to:kompaktowa konstrukcja izotermicznego zbiornika chłodu, sposób ładowania izotermicznego zbiornika chłodu, jest on w pełni kontrolowany, praca ma miejsce przy stałych warunkach operacyjnych,elastyczność wykorzystania urządzenia i infrastruktury poprzez umożliwienie pracy w wielu trybach. Projekt realizowany będzie w okresie od 1.07.2018r. do 31.10.2019r. Wdrożenie nowego produktu będzie możliwe dzięki sfinansowaniu inwestycji polegającej na: robotach budowlanych kubaturowych i instalacyjnych – budowa fabryki akumulatorów energii chłodu, zakupie i montażu maszyn i urządzeń – niezbędnych do produkcji akumulatorów chłodu, rozruchu linii technologicznej wraz z jej optymalizacją, zakupie specjalistycznego oprogramowania i rozpoczęciu produkcji nowego wyrobu. Wnioskodawca posiada prawo do wyników prac B+R oraz do produkcji i sprzedaży nowych akumulatorów energii chłodu. Wnioskodawca jest członkiem Wschodniego Klastra Budowlanego, posiadającego status Krajowego Klastra Kluczowego. Wnioskodawca będzie posiadał środki finansowe niezbędne do sfinansowania wkładu własnego i kosztów niekwalifikowanych.Wnioskodawca, uwzględniając podmioty powiązane, jest średnim przedsiębiorstwem.Projekt jest przygotowany w stopniu umożliwiającym bezpieczną realizację w planowanym do wdrożenia terminie. Harmonogram został zaplanowany z uwzględnieniem przeprowadzenia procedury wyboru wykonawców, budowy hali produkcyjnej z wydzielonym zapleczem biurowo-socjalnym, zamówienia maszyn i urządzeń, ich montażu oraz uruchomienia produkcji.SA 42799(2015/X), art. 13 rozp.651/2014 (Polish)
0 references
The project consists of the construction of a production plant in order to implement a new product-innovative cooling energy battery (ACH). The project is an initial investment. The planned project is the result of research and development carried out on behalf of the Applicant, which resulted in two patent applications per day. 30.03.2018r. The work was carried out between 2016 and 2017. The world’s unique product features include: the compact design of the isothermal cooling tank, the method of charging the isothermic coolant tank, it is fully controlled, the operation takes place under constant operating conditions, the flexibility of the use of equipment and infrastructure by enabling operation in many modes. The project will be implemented in the period from 1.07.2018 to 31.10.2019. The implementation of the new product will be possible by financing an investment consisting of: construction works for cubature and installation – construction of a factory of cooling energy batteries, purchase and assembly of machines and equipment – necessary for the production of cooling batteries, start-up of the process line with its optimisation, purchase of specialised software and start production of a new product. The applicant has the right to the results of R & D and to the production and sale of new cooling energy accumulators. The applicant is a member of the Eastern Building Cluster, having the status of the National Key Cluster. The applicant will have the necessary financial resources to finance its own contribution and ineligible costs.The applicant, taking into account its affiliates, is a medium-sized enterprise.The project is prepared to the extent that the project can be implemented safely within the planned deadline. The schedule has been planned taking into account the selection of contractors, the construction of a production hall with separate office and social facilities, the procurement of machinery and equipment, their installation and the commissioning of production.SA 42799(2015/X), Art. 13 clause 651/2014 (English)
14 October 2020
0 references
Le projet consiste en la construction d’une usine de production pour la mise en œuvre d’un nouveau produit innovant d’énergie de refroidissement rechargeable (ACH) sur le marché. Le projet est un investissement initial. Le projet envisagé est le résultat d’activités de recherche et de développement menées à la demande de la requérante, à la suite desquelles deux demandes de brevet ont été déposées. 30.03.2018 Les travaux ont été réalisés entre 2016 et 2017. Les caractéristiques uniques du produit dans le monde: la conception du réservoir à froid isotherme, la méthode de chargement du réservoir à froid isotherme, il est entièrement contrôlé, l’opération a lieu dans des conditions de fonctionnement constantes, la flexibilité de l’utilisation de l’équipement et de l’infrastructure en permettant le fonctionnement en plusieurs modes. Le projet sera mis en œuvre au cours de la période allant du 1er juillet 2018 au 31 octobre 2019. La mise en œuvre du nouveau produit sera possible par le financement d’investissements comprenant: travaux de construction et d’installation — construction d’une usine de batteries à énergie froide, achat et assemblage de machines et d’équipements — nécessaires à la production de batteries froides, démarrage de la ligne de processus avec son optimisation, achat de logiciels spécialisés et démarrage de la production d’un nouveau produit. Le demandeur a droit aux résultats des travaux de R & D ainsi qu’à la production et à la vente de nouvelles batteries pour l’énergie de refroidissement. Le demandeur est membre de l’Eastern Building Cluster, qui a le statut de grappe principale nationale. Le demandeur disposera des ressources financières nécessaires pour financer sa propre contribution et ses coûts inéligibles. Le demandeur, y compris les entités affiliées, est une entreprise de taille moyenne. Le projet est préparé dans la mesure où il peut être réalisé en toute sécurité dans les délais prévus. Le calendrier a été planifié en tenant compte de la mise en œuvre de la procédure de sélection des contractants, de la construction d’une salle de production dotée d’installations de bureau et d’installations sociales séparées, de la commande de machines et d’équipements, de leur assemblage et du lancement de la production.SA 42799(2015/X), article 13 du règlement (UE) no 651/2014. (French)
30 November 2021
0 references
Identifiers
POIR.03.02.01-06-0015/18
0 references