Renovation of the building ZUŠ – Spišské Podhradie, plot No.: 103/2 (Q3110674)
Jump to navigation
Jump to search
Project Q3110674 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Renovation of the building ZUŠ – Spišské Podhradie, plot No.: 103/2 |
Project Q3110674 in Slovakia |
Statements
591,165.45 Euro
0 references
695,488.77 Euro
0 references
85.0 percent
0 references
1 January 2019
0 references
10 January 2020
0 references
Mesto Spišské Podhradie
0 references
Cieľom projektu ,, Obnova budovy Základnej umeleckej školy – Spišské Podhradie“ je znížiť energetickú náročnosť a prispieť k zlepšeniu vplyvu budovy na životné prostredie a súčasne tak k ochrane zdravia ľudí. Výsledným efektom je sanácia verejnej budovy, úspora verejných prostriedkov a skvalitnenie a zlepšenie podmienok pre žiakov a pracovných podmienok pre zamestnancov ZUŠ. Zateplením sa znížia celkové náklady na vykurovanie, stavba sa ochráni pred nepriaznivými účinkami pôsobenia klimatických vplyvov, zároveň dôjde k zvýšeniu reprezentatívnosti a úžitkovej hodnoty ZUŠ.Realizácia diela bude pozostávať z piatich opatrení týkajúcich sa zateplenia stavebných konštrukcií, modernizácie vykurovacieho systému, inštalácie systému núteného vetrania so zariadením spätného získavania tepla a modernizácie interiérového osvetlenia .Pri návrhu opatrení sa kládol dôraz na ukazovateľ ,,Value for Money“, ktorý sa určí pomerom hodnoty merateľného ukazovateľa , t.j. zníženie potreby energie v predmetnej budove a vynaložených finančných zdrojov. Ukazovateľ ,,Value for Money“ je výsledným ukazovateľom, ktorý vyjadruje celkový prínos projektu ,, získaná hodnota za vynaložené finančné zdroje“.Predmetný projekt dosiahol ukazovateľ "Value for money" 1,065671968, čím projekt dosiahol "VYSOKÚ" mieru príspevku k špecifickému cieľu 4.3.1. OP KŽP. (Slovak)
0 references
The aim of the project, Restoration of the building of the Elementary Art School – Spišské Podhradie, is to reduce energy intensity and contribute to improving the impact of the building on the environment and thus protecting human health. The resulting effect is the remediation of the public building, the saving of public funds and the improvement and improvement of conditions for pupils and working conditions for employees of the primary school. Insulation will reduce the total cost of heating, the building will be protected from the adverse effects of climate effects, at the same time there will be an increase in the representativeness and utility value of the primary school.The implementation of the work will consist of five measures relating to insulation of building structures, modernisation of the heating system, installation of forced ventilation system with heat recovery equipment and modernisation of interior lighting.In the design of the measures, the emphasis was placed on the indicator “Value for Money”, which is determined by the ratio of the value of the measurable indicator, i.e. the reduction of energy needs in the building in question and the financial resources spent. The indicator “Value for Money” is the result indicator, which expresses the overall contribution of the project, the value obtained for the financial resources spent.The project in question achieved the indicator “Value for money” of 1,065671968, thus achieving the project’s contribution rate to the specific objective 4.3.1. OP AFMP. (English)
28 September 2021
0 references
L’objectif du projet, Restauration de la construction de l’école élémentaire d’art — Spišské Podhradie, est de réduire l’intensité énergétique et de contribuer à l’amélioration de l’impact du bâtiment sur l’environnement et, partant, à la protection de la santé humaine. L’effet qui en résulte est l’assainissement du bâtiment public, l’économie des fonds publics, l’amélioration et l’amélioration des conditions de vie des élèves et des conditions de travail des employés de l’école primaire. L’isolation réduira le coût total du chauffage, le bâtiment sera protégé des effets néfastes des effets climatiques, en même temps il y aura une augmentation de la représentativité et de la valeur d’utilité de l’école primaire.La mise en œuvre des travaux consistera en cinq mesures relatives à l’isolation des structures du bâtiment, la modernisation du système de chauffage, l’installation d’un système de ventilation forcée avec des équipements de récupération de chaleur et la modernisation de l’éclairage intérieur.Dans la conception des mesures, l’accent a été mis sur l’indicateur «Valeur de l’argent», qui est déterminé par le rapport de la valeur de l’indicateur mesurable, c’est-à-dire la réduction des besoins énergétiques dans le bâtiment en question et les ressources financières dépensées. L’indicateur «Valeur de l’argent» est l’indicateur de résultat, qui exprime la contribution globale du projet, la valeur obtenue pour les ressources financières dépensées.Le projet en question a atteint l’indicateur «Valeur pour l’argent» de 1 065671968, atteignant ainsi le taux de contribution du projet à l’objectif spécifique 4.3.1. OP AFMP. (French)
27 November 2021
0 references
Identifiers
310041J723
0 references