Increasing the share of renewable energy sources in Telgárt (Q3105477)
Jump to navigation
Jump to search
Project Q3105477 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Increasing the share of renewable energy sources in Telgárt |
Project Q3105477 in Slovakia |
Statements
288,977.95 Euro
0 references
339,974.06 Euro
0 references
85.0 percent
0 references
4 January 2021
0 references
9 January 2021
0 references
Obec Telgárt
0 references
Predkladaná projektová žiadosť rieši komplexne zásobovanie teplom 3 existujúce prevádzky verejných budov (ZŠ, MŠ a školskú jedáleň) v obci Telgárt a s tým súvisiacu zmenu palivovej základne - prechod od tuhého fosílneho plaiva na biomasu. Pôvodné 3 samostatné kotolne v 3 objektoch sa zlúčia do 1 centrálneho objektu SO 01 - Kotolňa so skladom štiepky (oprávnené náklady projektu), ktorý prostredníctvom vonkajších teplovodov - 3 trasy (neoprávnené náklady projektu) bude vykurovať všetky objekty. 4 pôvodné kotle na tuhé fosílné palivo budú nahradené za 2 kotle na biomasu. Pôvodný objekt školských dielní so skladom paliva nachádzajúci sa v areáli ZŠ bude čiastočne rekonštruovaný a rozšírení o sklad štiekpy. Stavba bude mať 1 užívateľa a prevádzkovateľa – obec. Doba realizácie stavby je odhadovaná na 6 mesiacov mimo vykutovacej sezóny. Stavba nevyvolá žiadne iné investície a nie je viazaná na inú stavbu.Skúšobná prevádzka bude stanovená po dohode s dodávateľom technolog. zariadení, počas ktorej sa ustáli prevádzkový režim, odstránia nedostatky a prípadne doplní vybavenosť. Po vykonaní všetkých predpísaných skúšok a revízií a po zaškolení obsluhy bude objekt kotolne daný do trvalej prevádzky.Realizáciou projektu dôjde k:- zlepšeniu materiálno-technického stavu rekonštruovanej budovy,- zlepšenie energetickej efektívnosti,- zvýšenie energetickej hospodárnosti budovy,- zníženie prevádzkových nákladov na vykurovanie. (Slovak)
0 references
The submitted project application deals with the comprehensive heat supply of 3 existing public buildings (Elementary School, MŠ and school canteen) in the village of Telgárt and the related change of the fuel base – the transition from solid fossil flame to biomass. The original 3 separate boiler rooms in 3 buildings will be merged into 1 central building SO 01 – boiler room with storage of chips (eligible costs of the project), which through external hot water – 3 routes (irregular project costs) will heat all objects. 4 original solid fossil fuel boilers will be replaced by 2 biomass boilers. The original building of school workshops with fuel storage located in the premises of the primary school will be partially reconstructed and expanded with a warehouse of staples. The building will have 1 user and operator – the village. The construction period is estimated at 6 months outside the penal season. The construction will not trigger any other investments and is not tied to any other building.The test operation will be determined in agreement with the supplier of technolog. equipment, during which the operating mode is settled, will correct the shortcomings and possibly complete the equipment. After all the required tests and revisions have been carried out and after the operator has been trained, the boiler house will be put into permanent operation.The implementation of the project will result in:- improvement of the material and technical condition of the reconstructed building,- improvement of energy efficiency,- increase in the energy performance of the building,- reduction of operating costs for heating. (English)
28 September 2021
0 references
La demande de projet soumise porte sur l’approvisionnement en chaleur complet de trois bâtiments publics existants (école élémentaire, MŠ et cantine scolaire) dans le village de Telgárt et sur le changement connexe de la base de combustible — le passage de la flamme fossile solide à la biomasse. Les 3 chaufferies d’origine réparties dans 3 bâtiments seront fusionnées dans un bâtiment central SO 01 — chaufferie avec stockage de copeaux (coûts éligibles du projet), qui, par l’intermédiaire de l’eau chaude externe — 3 voies (coûts irréguliers du projet) chaufferont tous les objets. 4 chaudières originales à combustibles fossiles solides seront remplacées par 2 chaudières à biomasse. Le bâtiment d’origine des ateliers scolaires avec stockage du carburant situé dans les locaux de l’école primaire sera partiellement reconstruit et agrandi avec un entrepôt de produits de base. Le bâtiment aura 1 utilisateur et opérateur — le village. La période de construction est estimée à 6 mois après la saison pénale. La construction ne déclenchera aucun autre investissement et n’est liée à aucun autre bâtiment. L’opération d’essai sera déterminée en accord avec le fournisseur de technolog. L’équipement, pendant lequel le mode de fonctionnement est réglé, corrigera les défauts et éventuellement complétera l’équipement. Après tous les essais et révisions requis et après la formation de l’opérateur, la chaufferie sera mise en service permanent.La mise en œuvre du projet se traduira par:- l’amélioration de l’état matériel et technique du bâtiment reconstruit,- l’amélioration de l’efficacité énergétique,- l’augmentation de la performance énergétique du bâtiment,- la réduction des coûts d’exploitation du chauffage. (French)
27 November 2021
0 references
Identifiers
310041X044
0 references