Sewage system and waste water treatment from the agglomeration of the Guide to the Tribunale di FAZA — FAZA 2 (Q2734618)
Jump to navigation
Jump to search
Project Q2734618 in Croatia
Language | Label | Description | Also known as |
---|---|---|---|
English | Sewage system and waste water treatment from the agglomeration of the Guide to the Tribunale di FAZA — FAZA 2 |
Project Q2734618 in Croatia |
Statements
62,205,110.15 Croatian kuna
0 references
84,233,985.37 Croatian kuna
0 references
85.0 percent
0 references
25 July 2017
0 references
31 December 2018
0 references
Vodovod i odvodnja d.o.o. Šibenik
0 references
22000
0 references
Osnovni cilj je zaštita zdrastvenog stanja i poboljšanja uvjeta života stanovnika. Cilj će se ostvariti kroz izgradnju kanalizacijske mreže s pripadajućim objektima, izgradnju novog UPOV-a II st.pročišćavanja i rekonstrukciju vodoopskrbnog sustava. Projekt se podjeljen u 2 faze kroz 2 operativna programa. (Croatian)
0 references
The essential aim is to protect a healthy state of health and to improve living conditions for inhabitants. The objective will be achieved through the construction of a sewage network with associated facilities, building a new UPOV II code, purification and reconstruction of the water supply system. The project is broken down into 2 phases through 2 operational programmes. (English)
3 June 2021
0 references
L’objectif principal est de protéger la situation sanitaire et d’améliorer les conditions de vie des résidents. L’objectif sera atteint par la construction d’un réseau d’égouts avec les installations associées, la construction du nouveau UPOV II-st. purification et la reconstruction du système d’approvisionnement en eau. Le projet est divisé en deux phases à travers deux programmes opérationnels. (French)
29 November 2021
0 references
Hauptziel ist es, die Gesundheitssituation zu schützen und die Lebensbedingungen der Bewohner zu verbessern. Das Ziel wird erreicht durch den Bau eines Abwassernetzes mit zugehörigen Anlagen, den Bau der neuen UPOV II-st. Reinigung und Rekonstruktion des Wasserversorgungssystems. Das Projekt ist in zwei Phasen durch zwei operationelle Programme unterteilt. (German)
29 November 2021
0 references
Identifiers
KK.06.4.2.11.0001
0 references