DRAINAGE OF DAIRY FARMS (Q2791635)

From EU Knowledge Graph
Revision as of 19:33, 29 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet concerne la mise en œuvre de la deuxième phase du projet de construction d’un réseau d’assainissement (DWN) et d’une installation de traitement des eaux usées (WWD) pour les colonies de Galatades et de Kariotissa dans l’unité municipale d’Alexandre le Grand de la municipalité de Pella. Plus précisément, il comprend:- L’achèvement de la construction de l’AMM interne de Karyotissa, qui est gravitationnel dans une partie de la colonie 472...)
Jump to navigation Jump to search
Project Q2791635 in Greece
Language Label Description Also known as
English
DRAINAGE OF DAIRY FARMS
Project Q2791635 in Greece

    Statements

    0 references
    7,499,555.0 Euro
    0 references
    1 January 2014
    0 references
    31 December 2023
    0 references
    ΔΗΜΟΣ ΠΕΛΛΑΣ
    0 references
    0 references

    40°54'2.41"N, 22°57'19.80"E
    0 references
    Το έργο αφορά στην υλοποίηση της Β' φάσης του έργου για την κατασκευή Δικτύου Αποχέτευσης (ΔΑ) και Εγκατάστασης Επεξεργασίας Λυμάτων (ΕΕΛ) για τους οικισμούς Γαλατάδες και Καρυώτισσα της Δημοτικής Ενότητας Μεγάλου Αλεξάνδρου του Δήμου Πέλλας. Συγκεκριμένα περιλαμβάνει:- Την ολοκλήρωση της κατασκευής του εσωτερικού ΔΑ Καρυώτισσας, το οποίο είναι βαρυτικό σε τμήμα του οικισμού 472 στρ. και δίκτυο αναρρόφησης στα υπόλοιπα 173 στρ. Το βαρυτικό τμήμα κατασκευάζεται σε υπολειπόμενο μήκος 8,987 χλμ από συνολικά 9,1 χλμ και το ΔΑ αναρρόφησης κατασκευάζεται στο συνολικό μήκος 3,7 χλμ. Και τα δύο δίκτυα καταλήγουν στο αντλιοστάσιο αναρρόφησης-κατάθλιψης Α1-VS-1 Καρυώτισσας.- Την ολοκλήρωση της κατασκευής δίδυμου καταθλιπτικού αγωγού, σε υπολειπόμενο μήκος 1.889 μ από συνολικό μήκος 3.775 μ,, για τη μεταφορά του συνόλου των λυμάτων της Καρυώτισσας από το αντλιοστάσιο Α1-VS-1 Καρυώτισσας ως την ΕΕΛ.- Την ολοκλήρωση της κατασκευής δίδυμου καταθλιπτικού αγωγού, σε υπολειπόμενο μήκος 601μ από συνολικό μήκος 2.540μ, για τη μεταφορά των λυμάτων των Γαλατάδων από το αντλιοστάσιο VS-2 Γαλατάδων ως την ΕΕΛ.- Την κατασκευή του εσωτερικού ΔΑ Γαλατάδων, μήκους 16,3 χλμ το οποίο είναι αναρρόφησης στο σύνολό του και καταλήγει στο αντλιοστάσιο VS-2 Γαλατάδων.- Την κατασκευή ΕΕΛ, δυναμικότητας 5.450 κατοίκων, για την εξυπηρέτηση και των 2 οικισμών. Η διάθεση των επεξεργασμένων λυμάτων θα γίνεται μέσω αγωγού 1,2 χλμ σε αποστραγγιστική τάφρο, η οποία μετά από 1,7 χλμ περίπου καταλήγει στον ποταμό Ασπροπόταμο, ο οποίος εκβάλλει μετά από 12 χλμ στον ποταμό Λουδία.- Την επίβλεψη των υπολειπόμενων εργασιών από προσωπικό της ΙΖ’ Εφορείας Προϊστορικών και Κλασικών Αρχαιοτήτων και πιθανές ανασκαπτικές εργασίες. (Greek)
    0 references
    The project relates to the implementation of the second phase of the project for the construction of a sewerage and sewage treatment plant for the settlements of Galatades and Karyotissa of the Municipal Unit of Megalo Alexandrou in the Municipality of Pella. Specifically it includes:- The completion of the construction of the interior of Karyotissa, which is gravitational in part of the settlement 472 sq.m. and suction network in the remaining 173 square meters. The weighting section shall be constructed at a residual length of 8,987 km from a total length of 9,1 km and the suction DM shall be constructed at a total length of 3,7 km. Both networks shall end in the suction-depression pumping station A1-VS-1 Karyotissa. Wastewater treatment will be disposed of via a 1.2 km drainage moat, which after about 1.7 km leads to the river Aspropotamos, which flows after 12 km into the Loudias River.- Overseeing the remaining work by staff of the IZ Ephorate of Prehistoric and Classical Antiquities and possible excavations. (English)
    3 July 2021
    0 references
    Le projet concerne la mise en œuvre de la deuxième phase du projet de construction d’un réseau d’assainissement (DWN) et d’une installation de traitement des eaux usées (WWD) pour les colonies de Galatades et de Kariotissa dans l’unité municipale d’Alexandre le Grand de la municipalité de Pella. Plus précisément, il comprend:- L’achèvement de la construction de l’AMM interne de Karyotissa, qui est gravitationnel dans une partie de la colonie 472 str. et le réseau d’aspiration dans les 173 str restants. La section gravitationnelle est construite à une longueur résiduelle de 8,987 km à partir d’un total de 9,1 km et l’aspiration MA est construite sur une longueur totale de 3,7 km. Les deux réseaux se terminent dans la station de pompage d’aspiration-dépression A1-VS-1 Karyotissa.- L’achèvement de la construction d’un double pipeline dépressif, à une longueur résiduelle de 1,889 m d’une longueur totale de 3,775 m, pour le transport de toutes les eaux usées de la station de pompage de Karyotissa A1-VS-1 Karyotissa jusqu’à la HEL.- L’achèvement de la construction d’un double pipeline dépressif, d’une longueur résiduelle de 601 m d’une longueur totale de 2,540 m, pour le transport des eaux usées de la station de pompage VS-2 vers le GWC; 16,3 km de long, qui est aspiré dans sa totalité et se termine dans la station de pompage VS-2 Galatades.- La construction d’une PWD, d’une capacité de 5 450 habitants, pour desservir les deux localités. Les eaux usées seront éliminées au moyen d’un pipeline de 1,2 km dans une tranchée de drainage qui, après 1,7 km environ, mène à la rivière Aspropotamos, qui se déverse après 12 km dans la rivière Loudia.- La supervision des travaux restants par le personnel de l’EZ Ephorate des Antiquités préhistoriques et classiques et d’éventuels travaux d’excavation. (French)
    29 November 2021
    0 references

    Identifiers

    5.003.540
    0 references