ESTABLISHMENT AND CONSTRUCTION OF A PORT PROJECT (PROJECTOR) AND LAND-SUPPORT INSTALLATIONS FOR WATER PLANTS (Q2779689)

From EU Knowledge Graph
Revision as of 12:17, 29 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le plan d’investissement concerne la création et la construction d’installations d’appui, à savoir le projet portuaire (pier) et des installations foncières (principalement des zones de stockage de denrées alimentaires, des équipements et des bureaux) à l’emplacement «Ormos Agios Panteleimonas» Astakos, municipalité de Xiromeros, unité régionale d’Aitoloakarnania pour soutenir et desservir les unités d’engraissement flottantes mises à la disposi...)
Jump to navigation Jump to search
Project Q2779689 in Greece
Language Label Description Also known as
English
ESTABLISHMENT AND CONSTRUCTION OF A PORT PROJECT (PROJECTOR) AND LAND-SUPPORT INSTALLATIONS FOR WATER PLANTS
Project Q2779689 in Greece

    Statements

    0 references
    414,733.0 Euro
    0 references
    23 October 2015
    0 references
    18 December 2020
    0 references
    ΝΗΡΕΥΣ ΙΧΘΥΟΚΑΛΛΙΕΡΓΕΙΕΣ ΑΝΩΝΥΜΗ ΕΤΑΙΡΕΙΑ
    0 references
    0 references

    38°41'1.00"N, 21°24'37.51"E
    0 references

    38°41'1.00"N, 21°24'37.51"E
    0 references
    Το σχέδιο επένδυσης αφορά στην ίδρυση και κατασκευή υποστηρικτικών εγκαταστάσεων και συγκεκριμένα λιμενικού έργου (προβλήτα) καθώς και χερσαίων εγκαταστάσεων (κυρίως αποθηκευτικοί χώροι τροφών, εξοπλισμών και γραφεία) στην θέση «Όρμος Αγίου Παντελεήμονα» Αστακού, Δήμου Ξηρομέρου, Περιφερειακής Ενότητας Αιτωλοακαρνανίας για την υποστήριξη και εξυπηρέτηση των πλωτών μονάδων πάχυνσης που διαθέτει ο Όμιλος ΝΗΡΕΥΣ Α.Ε. στην ευρύτερη περιοχή στον Όρμο Αγίου Παντελεήμονα, Αστακού και στις Εχινάδες Νήσους. Το παρόν σχέδιο επένδυσης περιλαμβάνει: Α) δαπάνες στις οποίες έχει προβεί ο φορέας και οι οποίες έχουν εξοφληθεί (τιμολόγια), από την 05-04-2017 έως και σήμερα, για την ίδρυση και κατασκευή λιμενικού έργου (προβλήτας) και χερσαίων εγκαταστάσεων υποστήριξης μονάδων υδατοκαλλιεργειών, και το ύψος των οποίων ανέρχεται στα 688.742,25 €, Β) Δαπάνες στις οποίες θα προβεί ο φορέας από το έτος 2018, μετά την υποβολή του φακέλου προς εξέταση (προσφορές) για την ίδρυση και κατασκευή λιμενικού έργου (προβλήτας) και χερσαίων εγκαταστάσεων υποστήριξης μονάδων υδατοκαλλιεργειών, και το ύψος των οποίων ανέρχεται στα 755.331,28 €.Το κόστος του σχεδίου επένδυσης, με τα χαρακτηριστικά που αναφέρθηκαν συνοπτικά παραπάνω (μερικό σύνολο επένδυσης), ανέρχεται στα 1.444.073,53 €, εκ των οποίων 688.742,25 € αναφέρονται σε δαπάνες που έχουν υλοποιηθεί από την 05-04-2017 και εξοφληθεί (τιμολόγια) και 755.331,28 € αναφέρονται σε δαπάνες που πρόκειται να υλοποιηθούν εν συνεχεία, από το φορέα (προσφορές). Τα τεχνικά και απρόβλεπτα έξοδα ανέρχονται σε ύψος 144.407,35 €, εκ των οποίων ποσό 59.700,00 € έχει υλοποιηθεί για την εκπόνηση μελετών αδειοδότησης του έργου, ενώ ποσό αξίας 9.700,00 € έχει συμπεριληφθεί σε προσφορά. Τα λοιπά απρόβλεπτα ανέρχονται σε 75.007,35 € και το γενικό σύνολο της επένδυσης ανέρχεται σε 1.588.480,88 €.Οι πηγές χρηματοδότησης αναφέρονται στην ενότητα Δ του Διαχωριστικού 8 του τόμου Α της Τεχνικοοικονομικής μελέτης. (Greek)
    0 references
    The investment plan concerns the establishment and construction of supporting facilities and specifically port project (pier) as well as land installations (mainly food storage facilities, equipment and offices) at the “Agios Panteleimonas Bay” Astakou Municipality, Xiromerou Municipality, Aetoloakarnania Regional Unit for the support and service of the floating units of the NHEREY Group, in the wider area of Agioi. This investment project includes: Expenditure incurred by the operator and paid (invoices), from 05-04-2017 to present, for the establishment and construction of a port project (pier) and land support facilities for aquaculture plants, amounting to EUR 688.742,25, B) expenditure to be made by the operator from the year 2018 to EUR, with a total amount of EUR, the amount of EUR, with a budget of EUR, the amount of the project (EUR) to which the appropriation shall be appropriated from the year 2018, to the amount of EUR, the amount of the project (EUR) to the amount of EUR... The technical and unforeseen costs amount to EUR 144,407,35, of which EUR 59,700,00 has been implemented for the conduct of licensing studies of the project, while a value of EUR 9,700,00 has been included in a bid. The other contingencies amount to EUR 75,007,35 and the overall investment amounts to EUR 1,588,480,88.The sources of funding refer to Section D of Separator 8 of Volume A of the Technical and Financial Study. (English)
    2 July 2021
    0 references
    Le plan d’investissement concerne la création et la construction d’installations d’appui, à savoir le projet portuaire (pier) et des installations foncières (principalement des zones de stockage de denrées alimentaires, des équipements et des bureaux) à l’emplacement «Ormos Agios Panteleimonas» Astakos, municipalité de Xiromeros, unité régionale d’Aitoloakarnania pour soutenir et desservir les unités d’engraissement flottantes mises à la disposition du groupe Nireus dans la zone élargie d’Ormos Agios Panteleimonas, Astakou et Echinades. Ce plan d’investissement comprend: Les dépenses encourues par l’organisme et payées (factures) du 5 avril 2017 à ce jour pour l’établissement et la construction d’un projet portuaire (projet) et d’installations d’appui aux terres pour les unités aquacoles, d’un montant de 688 742,25 EUR, (B) Dépenses à engager par l’exploitant à partir de 2018 après présentation du dossier d’examen (offres) pour l’établissement et la construction d’un projet portuaire (projet) et d’installations terrestres soutenant les unités aquacoles; le coût du projet d’investissement, avec les caractéristiques résumées ci-dessus (partie de l’investissement total), s’élève à 1 444 773,53 EUR, dont 688 742,25 EUR correspondent aux coûts supportés depuis le 5-04-2017 et payés (factures) et 755 331,28 EUR correspondent à des coûts qui seront ensuite mis en œuvre par l’organisme (appels d’offres). Les coûts techniques et imprévisibles s’élèvent à 144 407,35 EUR, dont 59 700,00 EUR ont été mis en œuvre pour l’élaboration d’études de licence de projet, tandis qu’une valeur de 9 700,00 EUR a été incluse dans un appel d’offres. Les autres montants imprévus s’élèvent à 7 557,35 EUR et le total de l’investissement s’élève à 1 588 480,88 EUR. Les sources de financement sont mentionnées à la section D du Séparateur 8 du volume A de l’étude technique et économique. (French)
    29 November 2021
    0 references

    Identifiers

    5.038.523
    0 references