IMPROVEMENT OF THE EXISTING ROUTE OF TRIPOLI (Q2777488)

From EU Knowledge Graph
Revision as of 12:00, 29 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet comprend les travaux de construction du contournement de la colonie de Kato Doliani de la municipalité de Kynouria Nord et concerne un nouveau tronçon routier de 1 170,53 m de long. Le projet fait partie de l’axe prioritaire 4 et de l’objectif thématique no 7 du programme opérationnel du Péloponnèse 2014-2020. L’objectif est la modernisation opérationnelle et la modernisation du réseau routier de la préfecture d’Arcadia. En particulier...)
Jump to navigation Jump to search
Project Q2777488 in Greece
Language Label Description Also known as
English
IMPROVEMENT OF THE EXISTING ROUTE OF TRIPOLI
Project Q2777488 in Greece

    Statements

    0 references
    4,920,528.0 Euro
    0 references
    2 July 2018
    0 references
    30 June 2022
    0 references
    ΠΕΡΙΦΕΡΕΙΑ ΠΕΛΟΠΟΝΝΗΣΟΥ
    0 references
    0 references

    37°19'52.07"N, 22°20'54.35"E
    0 references

    37°19'52.07"N, 22°20'54.35"E
    0 references
    Το έργο περιλαμβάνει τις εργασίες για την κατασκευή της παράκαμψης του οικισμού Κάτω Δολιανών του Δήμου Βόρειας Κυνουρίας και αφορά νέο οδικό τμήμα μήκους 1.170,53m. Το έργο εντάσσεται στον ’ξονας Προτεραιότητας 4 και στο θεματικό στόχο 7 του Επιχειρησιακού Προγράμματος Πελοπόννησος 2014-2020. Στόχος είναι η λειτουργική αναβάθμιση και ο εκσυγχρονισμός του οδικού δικτύου του Νομού Αρκαδίας. Ειδικότερα, το έργο εντάσσεται στις παρεμβάσεις βελτίωσης της Επαρχιακής Οδού (Επ.Ο.) Τρίπολης – ’στρους λειτουργώντας συνδυαστικά με ήδη βελτιωμένα τμήματα της οδού (Κουμπίλα – Λουλούδι, Ελαιοχώρι – Κουμπίλα). Ταυτόχρονα, συμβάλλει στην παράκαμψη του οικιστικού ιστού των Κάτω Δολιανών, στην βελτίωση των γεωμετρικών και λειτουργικών χαρακτηριστικών της Επ.Ο. Τρίπολης – ’στρους και στη μείωση του χρόνου και την ασφαλέστερη μετακίνηση από την Τρίπολη προς τα ανατολικά παράλια της Πελοποννήσου. (Greek)
    0 references
    The project includes the works for the construction of the bypass of the settlement of Lower Dolianos of the Municipality of Northern Kynouria and concerns a new road section of 1170.53 m long. The project is part of the Priority Axis 4 and thematic Objective 7 of the Operational Programme of the Peloponnese 2014-2020. The aim is the functional upgrading and modernisation of the road network of Arcadia Prefecture. In particular, the project is part of the interventions to improve the Provincial Road (E.P.O.) of Tripoli Astrous operating in combination with already improved sections of the road (Koubila Louloudi, Eleochori Koumbila). At the same time, it contributes to the bypassing of the residential fabric of Lower Dolianos, the improvement of the geometric and functional characteristics of Ep.O. Tripoli Astros and the reduction of time and the safer movement from Tripoli to the eastern coast of the Peloponnese. (English)
    2 July 2021
    0 references
    Le projet comprend les travaux de construction du contournement de la colonie de Kato Doliani de la municipalité de Kynouria Nord et concerne un nouveau tronçon routier de 1 170,53 m de long. Le projet fait partie de l’axe prioritaire 4 et de l’objectif thématique no 7 du programme opérationnel du Péloponnèse 2014-2020. L’objectif est la modernisation opérationnelle et la modernisation du réseau routier de la préfecture d’Arcadia. En particulier, le projet s’inscrit dans le cadre des interventions visant à améliorer la route provinciale (E.O.) Astros de Tripoli, en association avec des tronçons déjà améliorés de la route (Koubila Flower, Eleochori Koumbila). Dans le même temps, il contribue au contournement du tissu résidentiel de Kato Doliani, à l’amélioration des caractéristiques géométriques et fonctionnelles de l’unité régionale de Tripoli et à la réduction du temps et des déplacements plus sûrs de Tripoli vers la côte est du Péloponnèse. (French)
    29 November 2021
    0 references

    Identifiers

    5.016.067
    0 references