The purchase and installation of a photovoltaic installation in a “ART-DOM” ROBERT ROBERT SIŁEK. (Q131709)

From EU Knowledge Graph
Revision as of 20:32, 10 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The planned investment will consist of the purchase and installation of a photovoltaic installation on the roof of a commercial building on plot 2111/1, including the use of photovoltaic panels. The total power of the installation will be 40 kW. The implementation of the investment in question is not required to obtain a building permit or to obtain an environmental decision. The resulting energy will be used for the company’s own needs and surp...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
The purchase and installation of a photovoltaic installation in a “ART-DOM” ROBERT ROBERT SIŁEK.
Project in Poland financed by DG Regio

    Statements

    0 references
    208,250.0 zloty
    0 references
    49,980.0 Euro
    13 January 2020
    0 references
    301,350.0 zloty
    0 references
    72,324.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    29 February 2016
    0 references
    30 April 2018
    0 references
    PRZEDSIĘBIORSTWO HANDLOWO USŁUGOWE „ART-DOM” ROBERT SIOŁEK
    0 references

    53°49'26.4"N, 22°21'42.8"E
    0 references
    Planowana inwestycja polegać będzie na zakupie i montażu instalacji fotowoltaicznej na dachu budynku handlowo- usługowego na działce 2111/1, gm. Ełk z wykorzystaniem paneli fotowoltaicznych. Łączna moc instalacji wynosić będzie 40 kW. Do realizacji przedmiotowej inwestycji nie są wymagane pozwolenie na budowę, ani uzyskanie decyzji środowiskowej. Uzyskana energia będzie wykorzystywana na potrzeby własne przedsiębiorstwa a nadwyżka energii sprzedawana będzie do ogólnopolskiego operatora energii elektrycznej. Realizacja projektu jest uzasadniona zarówno ekonomicznie, środowiskowo, społecznie i gospodarczo oraz przyczyni się do osiągania założonych przez Unię Europejską wytycznych. Celem głównym projektu jest zwiększenie udziału odnawialnych źródeł energii w ogólnym bilansie energetycznym w województwie warmińsko-mazurskim poprzez zakup i montaż instalacji fotowoltaicznej o mocy do 40 kW na dachu budynku handlowo- usługowego przez firmę PHU „ART-DOM” Robert Siołek w miejscowości Ełk do IV 2018r. Etapy realizacji: 1. Etap przygotowań –wybór wykonawcy zgodnie z zasadą konkurencyjności 2. Etap Wdrożenia- zakup i montaż: a) paneli fotowoltaicznych b) inwerterów c) układu pomiarowego d) instalacji odgromowej e) połączeń wyrównawczych f) instalacji przeciwprzepięciowej g) ochrony od porażeń Projekt jest zgodny ze Strategią rozwoju społeczno-gospodarczego województwa warmińsko- mazurskiego do roku 2025 oraz wpisuje się w SZOOP RPO WiM 2014-2020 gdyż przyczynia się do realizacji zaplanowanych ww. dokumentach celów, wskaźników i rezultatów, jest zgodny z możliwymi do dofinansowania formami wsparcia oraz typem beneficjentów . Projekt realizuje cel Działania 4.1 zwiększony udział odnawialnych źródeł energii w ogólnym bilansie energetycznym regionu poprzez zakup i montaż instalacji fotowoltaicznej o mocy 40kW. (Polish)
    0 references
    The planned investment will consist of the purchase and installation of a photovoltaic installation on the roof of a commercial building on plot 2111/1, including the use of photovoltaic panels. The total power of the installation will be 40 kW. The implementation of the investment in question is not required to obtain a building permit or to obtain an environmental decision. The resulting energy will be used for the company’s own needs and surplus energy will be sold to the Polish electricity operator. The implementation of the project is both economically, environmentally, socially and economically justified and will contribute to the implementation of the guidelines set by the European Union. The main purpose of the project is to increase the share of renewable energy sources in the overall energy balance in Warmińsko-Mazurskie Province by the purchase and installation of a photovoltaic installation of up to 40 kW on the roof of a commercial/service building by PHU “ARTD-DOM” Robert Siłek in Ełk to IV 2018. Implementation steps: 1. Preparation phase — selection of the contractor in accordance with the competitiveness principle 2. Implementation phase — purchase and assembly: (a) (a) (a) solar panels (c) (c) (d) the metering system (d) the compensation system (f) of the compensation system (f) the protection against the risk of the damage is in line with the socio-economic development strategy for Warmińsko-Mazurskie Province until 2025 and is in line with the strategy for the socio-economic development of ROP WM 2014-2020, as it contributes to the achievement of the planned documents, indicators and results, is compatible with the forms of support and the type of beneficiaries envisaged. The project meets the objective of Measure 4.1 to increase the share of renewable energy sources in the overall energy balance of the region through the purchase and installation of a 40 kW photovoltaic power plant. (English)
    0 references

    Identifiers

    RPWM.04.01.00-28-0018/16
    0 references