Revision as of 10:13, 29 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet prévoit la reconstruction de l’enveloppe du bâtiment, qui comprend quatre mesures de construction (isolation thermique des murs extérieurs, isolation thermique du plafond vers le grenier non chauffé et isolation d’une partie de la fondation et du jus, isolation du toit incliné au-dessus de la partie chauffée) et deux mesures mécaniques (Installation d’une chaudière à condensation de gaz à haut rendement et installation d’une pompe à ch...)
Jump to navigation Jump to search
Project Q2733092 in Croatia
Language Label Description Also known as
English
Energy renovation of the Suhopol-Primary School building and school hall at Kraja Tomislav 26, Suhopolje
Project Q2733092 in Croatia

    Statements

    0 references
    1,572,055.91 Croatian kuna
    0 references
    204,367.27 Euro
    2 June 2021
    0 references
    2,503,200.69 Croatian kuna
    0 references
    325,416.09 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    24 September 2018
    0 references
    24 September 2020
    0 references
    VIROVITIČKO-PODRAVSKA ŽUPANIJA
    0 references
    0 references

    45°49'53.94"N, 17°23'7.94"E
    0 references
    33000
    0 references
    Projektom je predviđena rekonstrukcija ovojnice zgrade koja obuhvaća četiri građevinske mjere (toplinsku izolaciju vanjskih zidova, toplinsku izolaciju stropa prema negrijanog tavana i izolacija dijela temelja i sokla, izolaciju kosog krova iznad grijanog dijela), te dvije strojarske mjere (Ugradnja visokoučinkovitog plinskog kondenzacijskog kotla te ugradnja dizalice topline za pripremu PTV) a sve u cilju smanjenja utroška energije i štetnih emisija CO2. (Croatian)
    0 references
    The project provides for the renovation of the building envelope comprising four structural measures (thermal insulation of external walls, thermal insulation of the ceiling to an unheated attic, insulation of part of the foundations, insulation of the part of the roof above the heated part), and two engine mechanical measures (construction of a high efficient gas condensing boiler and the installation of heat pumps for DHW generation), all with the aim of reducing energy input and harmful CO2 emissions. (English)
    3 June 2021
    0 references
    Le projet prévoit la reconstruction de l’enveloppe du bâtiment, qui comprend quatre mesures de construction (isolation thermique des murs extérieurs, isolation thermique du plafond vers le grenier non chauffé et isolation d’une partie de la fondation et du jus, isolation du toit incliné au-dessus de la partie chauffée) et deux mesures mécaniques (Installation d’une chaudière à condensation de gaz à haut rendement et installation d’une pompe à chaleur pour la préparation de TVP) toutes afin de réduire la consommation d’énergie et les émissions nocives de CO2. (French)
    29 November 2021
    0 references

    Identifiers

    KK.04.2.1.04.0275