The energy renovation of the City of Slatina district building at Trg sv. Josipa 10, Slatina (Q2733008)

From EU Knowledge Graph
Revision as of 10:12, 29 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet prévoit une rénovation énergétique comprenant neuf mesures de construction (isolation thermique des murs extérieurs, murs au sol, murs au grenier non chauffé, plafond au grenier non chauffé, toit incliné sur l’espace chauffé (entrée au grenier non couvert), plafond au-dessus de l’espace chauffé (plafond vers la terrasse), plafonds à l’air extérieur, sol à air extérieur, remplacement de la menuiserie extérieure) et trois mesures mécaniq...)
Jump to navigation Jump to search
Project Q2733008 in Croatia
Language Label Description Also known as
English
The energy renovation of the City of Slatina district building at Trg sv. Josipa 10, Slatina
Project Q2733008 in Croatia

    Statements

    0 references
    2,655,067.18 Croatian kuna
    0 references
    345,158.73 Euro
    2 June 2021
    0 references
    4,391,198.19 Croatian kuna
    0 references
    570,855.76 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    23 August 2018
    0 references
    23 October 2020
    0 references
    GRAD SLATINA
    0 references
    0 references

    45°39'41.40"N, 17°46'18.01"E
    0 references
    33520
    0 references
    Projektom je planirana energetska obnova koja obuhvaća devet građevinskih mjera (toplinsku izolaciju vanjskih zidova, zida prema tlu, zidova prema negrijanom neuređenom potkrovlju, stropa prema neuređenom negrijanom potkrovlju, kosog krova nad grijanim prostorom (ulaz u neuređeno potkrovlje), stropa iznad grijanog prostora (strop prema terasi), stropova prema vanjskom zraku, poda prema vanjskom zraku, zamjenom vanjske stolarije) te tri strojarske mjere (rekonstrukcije sustava grijanja, uvođenje sustava hlađenja zgrade dizalicom topline te ugradnja termostatskih ventila) a sve u cilju smanjenja utroška energije i štetnih emisija CO2. (Croatian)
    0 references
    The project is planned with energy renovations comprising nine building measures (thermal insulation of external walls, ground wall, walls bordering the unheated roof, the ceiling on unheated roof, the sloping roof over the heated space (entrance into unregulated subroof), ceilings over the heated space (ceiling towards terrace), external air ceilings, floor towards external air, the external trim exchange, the exchange of exterior trim, and installation of thermostatic valves), and all with the aim of reducing energy and harmful CO2 emissions. (English)
    3 June 2021
    0 references
    Le projet prévoit une rénovation énergétique comprenant neuf mesures de construction (isolation thermique des murs extérieurs, murs au sol, murs au grenier non chauffé, plafond au grenier non chauffé, toit incliné sur l’espace chauffé (entrée au grenier non couvert), plafond au-dessus de l’espace chauffé (plafond vers la terrasse), plafonds à l’air extérieur, sol à air extérieur, remplacement de la menuiserie extérieure) et trois mesures mécaniques (reconstruction des systèmes de chauffage, mise en place d’un système de refroidissement du bâtiment par pompe à chaleur et installation de vannes thermostatiques) afin de réduire la consommation d’énergie et les émissions nocives de CO2. (French)
    29 November 2021
    0 references

    Identifiers

    KK.04.2.1.04.0130
    0 references