Production line for finger-jointed construction wood as well as duo/triobalks and loading hall (Q3061385)
Jump to navigation
Jump to search
Project Q3061385 in Austria
Language | Label | Description | Also known as |
---|---|---|---|
English | Production line for finger-jointed construction wood as well as duo/triobalks and loading hall |
Project Q3061385 in Austria |
Statements
9,000,000.0 Euro
0 references
12 July 2017
0 references
31 July 2019
0 references
Franz Kirnbauer KG;KIRNBAUER HOLZ LiegenschaftsGmbH
0 references
31839
0 references
Another production hall is being built at the Ternitz site, in which a production line (conveyor systems and press, wedge zinc and planing plants) is installed, which is specially designed for the processing of larger fin dimensions. (English)
20 July 2021
0 references
Am Standort Ternitz wird eine weitere Produktionshalle errichtet, in der eine Produktionslinie (Förderanlagen und Presse, Keilzink- und Hobelanlagen) installiert wird, die speziell auf die Verarbeitung größerer Lamellendimensionen ausgelegt ist. (Austrian German)
0 references
Sur le site de Ternitz, un autre hall de production est installé, dans lequel une ligne de production (installations d’extraction et de presse, installations de pliage et de rabotage) est spécialement conçue pour le traitement de grandes dimensions de lamelles. (French)
27 November 2021
0 references
Op de locatie Ternitz wordt een verdere productiehal gebouwd, waarin een productielijn (transportband en pers, wigzink en schaafinstallaties) wordt geïnstalleerd, die speciaal is ontworpen voor de verwerking van grotere lamellenafmetingen. (Dutch)
29 November 2021
0 references
Ternitz
0 references
Identifiers
AUST-1097
0 references