BD Pod Hájem 304, King’s Court (Q75343)

From EU Knowledge Graph
Revision as of 01:36, 29 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet contient une maison individuelle st. 573/1, 573/2 à Králův Dvůr, district de Beroun. Le projet suit l’isolation partielle des murs de bouclier et des toits en complétant l’isolation thermique de toute l’enveloppe du bâtiment. Il est prêt pour la réduction d’énergie selon les exigences IROP. L’objectif du projet est de réduire les coûts de chauffage des résidents de la maison en convergence avec l’effet de réduire les émissions en Répub...)
Jump to navigation Jump to search
Project Q75343 in Czech Republic
Language Label Description Also known as
English
BD Pod Hájem 304, King’s Court
Project Q75343 in Czech Republic

    Statements

    0 references
    769,414.26 Czech koruna
    0 references
    30,776.57 Euro
    10 January 2020
    0 references
    2,564,714.22 Czech koruna
    0 references
    102,588.57 Euro
    10 January 2020
    0 references
    30.0 percent
    0 references
    2 January 2018
    0 references
    30 November 2017
    0 references
    Společenství vlastníků jednotek Pod Hájem 304, Králův Dvůr
    0 references
    0 references

    49°56'3.5"N, 14°1'34.0"E
    0 references
    26701
    0 references
    Obsahem projektu je samostatně stojící dům st. 573/1, 573/2 v obci Králův Dvůr, okres Beroun. Projekt navazuje na dílčí zateplení štítových stěn a střechy dokončením tepelné izolace celé obálky budovy. Je připraven pro snížení energií podle požadavků IROP. Cílem projektu je snížit výdaje za vytápění obyvatel domu v konvergenci s účinkemsnížení emisí v ČR. Návrh k dodržení kritérií pro přidělení dotace jsou uvedeny v projektové dokumentaci. Předpokladem pro realizaci je obdržení dotace. (Czech)
    0 references
    The project contains a detached house st. 573/1, 573/2 in the village Králův Dvůr, district Beroun. The project builds on partial insulation of the shield walls and roof by completing the thermal insulation of the entire building envelope. It is ready for energy reduction according to the IROP requirements. The aim of the project is to reduce the heating costs of residents of the house in convergence with the effect of reducing emissions in the Czech Republic. The proposal for compliance with the criteria for awarding the subsidy is set out in the project documentation. The prerequisite for implementation is the receipt of the subsidy. (English)
    23 October 2020
    0 references
    Le projet contient une maison individuelle st. 573/1, 573/2 à Králův Dvůr, district de Beroun. Le projet suit l’isolation partielle des murs de bouclier et des toits en complétant l’isolation thermique de toute l’enveloppe du bâtiment. Il est prêt pour la réduction d’énergie selon les exigences IROP. L’objectif du projet est de réduire les coûts de chauffage des résidents de la maison en convergence avec l’effet de réduire les émissions en République tchèque. La proposition relative au respect des critères d’attribution figure dans la documentation du projet. Une condition préalable à la mise en œuvre est l’obtention d’une subvention. (French)
    29 November 2021
    0 references

    Identifiers

    CZ.06.2.11/0.0/0.0/16_098/0001888
    0 references