Mixed paths for pedestrians and cyclists in Mercandin Gardens – Stage II (Q74818)

From EU Knowledge Graph
Revision as of 01:30, 29 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet s’inscrit dans le cadre de l’événement-cadre intitulé «Mercandinovy sady — restauration du parc historique — Phase III». La demande de subvention (ou la méthode des dépenses) a pour objet la reconstruction, la modernisation et la construction de sentiers communs pour les piétons et les cyclistes, y compris la reconstruction de trois passerelles existantes non conformes. Les sentiers seront utilisés à la fois pour le cyclisme et en même...)
Jump to navigation Jump to search
Project Q74818 in Czech Republic
Language Label Description Also known as
English
Mixed paths for pedestrians and cyclists in Mercandin Gardens – Stage II
Project Q74818 in Czech Republic

    Statements

    0 references
    14,698,975.2 Czech koruna
    0 references
    587,959.01 Euro
    10 January 2020
    0 references
    17,292,912.0 Czech koruna
    0 references
    691,716.48 Euro
    10 January 2020
    0 references
    85 percent
    0 references
    12 May 2017
    0 references
    29 April 2019
    0 references
    30 April 2019
    0 references
    Město Klatovy
    0 references
    0 references

    49°23'21.8"N, 13°17'52.1"E
    0 references
    33901
    0 references
    Projekt je součástí zastřešující akce s názvem "Mercandinovy sady - obnova historického parku - III. etapa". Předmětem žádosti o dotaci (resp. způsob. výdajů) je rekonstrukce, modernizace a výstavba společných stezek pro chodce a cyklisty, vč. rekonstrukce tří stávajících nevyhovujících lávek. Stezky budou sloužit jednak k cyklodopravě a současně zpřístupní prostor parku k rekreačním účelům a sport. vyžití. Cílem projektu je zvýšení komfortu a zejména bezpečnosti provozu pro pěší a cyklisty. (Czech)
    0 references
    The project is part of an umbrella event called “Mercandin’s Orchards – Renewal of the Historical Park – Stage III”. The subject of the application for a subsidy (or the method of expenditure) is the reconstruction, modernisation and construction of common paths for pedestrians and cyclists, including the reconstruction of three existing unsatisfactory bridges. The trails will serve both for cycling and at the same time access the park area for recreational purposes and sports. The aim of the project is to increase comfort and especially safety of operation for pedestrians and cyclists. (English)
    23 October 2020
    0 references
    Le projet s’inscrit dans le cadre de l’événement-cadre intitulé «Mercandinovy sady — restauration du parc historique — Phase III». La demande de subvention (ou la méthode des dépenses) a pour objet la reconstruction, la modernisation et la construction de sentiers communs pour les piétons et les cyclistes, y compris la reconstruction de trois passerelles existantes non conformes. Les sentiers seront utilisés à la fois pour le cyclisme et en même temps pour la mise à disposition de la zone du parc à des fins récréatives et sportives. L’objectif du projet est d’accroître le confort et surtout la sécurité d’exploitation des piétons et des cyclistes. (French)
    29 November 2021
    0 references

    Identifiers

    CZ.06.1.37/0.0/0.0/16_077/0006227
    0 references