ELEMENTARY SCHOOL VSETÍN, ROKYTNICE 436 – REDUCTION OF ENERGY PERFORMANCE (Q72983)

From EU Knowledge Graph
Revision as of 01:03, 29 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet a pour objet la construction du bâtiment existant de l’école primaire Vsetín, Rokytnice 436. L’objectif principal des travaux de construction est d’assurer une réduction de la performance énergétique du bâtiment de l’école primaire. Le projet résout l’isolation complète de l’enveloppe du bâtiment, y compris les toits, le remplacement des ouvertures dans le boîtier extérieur, le remplacement des fenêtres en bois d’origine, les portes mé...)
Jump to navigation Jump to search
Project Q72983 in Czech Republic
Language Label Description Also known as
English
ELEMENTARY SCHOOL VSETÍN, ROKYTNICE 436 – REDUCTION OF ENERGY PERFORMANCE
Project Q72983 in Czech Republic

    Statements

    0 references
    11,872,458.4 Czech koruna
    0 references
    474,898.34 Euro
    10 January 2020
    0 references
    29,681,146.0 Czech koruna
    0 references
    1,187,245.84 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    1 June 2018
    0 references
    31 December 2018
    0 references
    Město Vsetín
    0 references
    0 references
    0 references

    49°20'4.70"N, 17°59'38.00"E
    0 references
    75501
    0 references
    Předmětem projektu jsou stavební úpravy stávajícího objektu Základní školy Vsetín, Rokytnice 436. Hlavním cílem stavebních úprav je zajištění snížení energetické náročnosti objektu ZŠ. Projekt řeší kompletní zateplení obvodového pláště objektu včetně střech, výměnu výplní otvorů v obvodovém plášti, výměnu původních dřevěných oken, kovových dveří, vnitřních kovových dveří u hlavních vstupů, prosklených stěn na schodištích pav. vedení, šaten a tělocvičen, systém nuceného větrání včetně hromosvodu. (Czech)
    0 references
    The object of the project is construction modifications of the existing building of the Vsetín Primary School, Rokytnice 436. The main objective of the construction modifications is to ensure that the energy performance of the elementary school building is reduced. The project deals with complete insulation of the building’s circumferential shell including roofs, replacement of openings in the circumferential cloak, replacement of original wooden windows, metal doors, internal metal doors at main entrances, glass walls on staircases pav. lines, dressing rooms and gymnasiums, system of forced ventilation including lightning rod. (English)
    23 October 2020
    0 references
    Le projet a pour objet la construction du bâtiment existant de l’école primaire Vsetín, Rokytnice 436. L’objectif principal des travaux de construction est d’assurer une réduction de la performance énergétique du bâtiment de l’école primaire. Le projet résout l’isolation complète de l’enveloppe du bâtiment, y compris les toits, le remplacement des ouvertures dans le boîtier extérieur, le remplacement des fenêtres en bois d’origine, les portes métalliques, les portes intérieures en métal aux entrées principales, les murs vitrés dans les escaliers de câblage pav., les vestiaires et les gymnases, le système de ventilation forcée, y compris la foudre. (French)
    29 November 2021
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/16_039/0004465
    0 references