Group water supply Kopidlnsko (Q61372)

From EU Knowledge Graph
Revision as of 23:00, 28 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif du projet est d’assurer l’approvisionnement en eau potable en quantité appropriée pour la zone couverte par la partie Kopidlnska. Il s’agit de fournir une source supplémentaire d’eau potable, étant donné que la source d’eau potable existante, le forage R-3, se trouve au bord de sa capacité en raison de la restriction imposée au captage. Le projet comprend la construction de la ligne d’approvisionnement Staňkova Lhota — Rakov Batín, pe...)
Jump to navigation Jump to search
Project Q61372 in Czech Republic
Language Label Description Also known as
English
Group water supply Kopidlnsko
Project Q61372 in Czech Republic

    Statements

    0 references
    41,331,082.49 Czech koruna
    0 references
    1,653,243.30 Euro
    10 January 2020
    0 references
    64,833,070.59 Czech koruna
    0 references
    2,593,322.82 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    30 September 2022
    0 references
    Vodohospodářská a obchodní společnost, a.s.
    0 references
    0 references

    50°26'15.14"N, 15°19'55.52"E
    0 references
    50601
    0 references
    Cílem projektu je zajistit dodávku pitné vody v odpovídajícím množství pro řešenou oblast části Kopidlnska. Jde o zajištění dalšího zdroje pitné vody, neboť stávající zdroj pitné vody, vrt R-3, je na hraně své kapacity díky vydanému omezení k odběru. Projekt zahrnuje výstavbu přívodního řadu Staňkova Lhota - Rakov Batín, umožňující napojení na zdroje skupinového vodovodu Sobotka. Součástí projektu je rovněž výstavba nového zásobního vodojemu Čakan, který zajistí dostatečnou akumulaci pitné vody. (Czech)
    0 references
    The aim of the project is to ensure the supply of drinking water in the corresponding quantity for the area of Kopidlnska. It is about providing an additional source of drinking water, as the existing source of drinking water, R-3, is at the edge of its capacity due to the restrictions on consumption. The project includes the construction of the supply line Staňkova Lhota – Rakov Batín, allowing connection to the Sobotka group water supply sources. Part of the project is also the construction of a new water reservoir Chakan, which will ensure sufficient accumulation of drinking water. (English)
    23 October 2020
    0 references
    L’objectif du projet est d’assurer l’approvisionnement en eau potable en quantité appropriée pour la zone couverte par la partie Kopidlnska. Il s’agit de fournir une source supplémentaire d’eau potable, étant donné que la source d’eau potable existante, le forage R-3, se trouve au bord de sa capacité en raison de la restriction imposée au captage. Le projet comprend la construction de la ligne d’approvisionnement Staňkova Lhota — Rakov Batín, permettant le raccordement à l’approvisionnement en eau du groupe Sobotka. Le projet comprend également la construction d’un nouveau réservoir d’eau de stockage, qui assurera une accumulation suffisante d’eau potable. (French)
    29 November 2021
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/17_073/0007237
    0 references