Sewage sewerage and sewage treatment plant Ponds (Q60020)

From EU Knowledge Graph
Revision as of 22:39, 28 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet «assainissement des eaux usées et station d’épuration Rybníky» porte sur la collecte et l’élimination des eaux usées dans le village de Rybníky. Ce projet propose la construction d’un réseau d’égouts d’une longueur de 3 489,28 m et la construction d’une nouvelle station de traitement des eaux usées de 450 EO. Les égouts sont conçus à partir de tuyaux à trois couches en polyéthylène PE 100/SDR 11 dans des profilés D = 50-110 mm. La tech...)
Jump to navigation Jump to search
Project Q60020 in Czech Republic
Language Label Description Also known as
English
Sewage sewerage and sewage treatment plant Ponds
Project Q60020 in Czech Republic

    Statements

    0 references
    22,595,010.53 Czech koruna
    0 references
    903,800.42 Euro
    10 January 2020
    0 references
    35,443,153.79 Czech koruna
    0 references
    1,417,726.15 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    25 September 2017
    0 references
    31 August 2020
    0 references
    Obec Rybníky
    0 references
    0 references
    0 references

    49°45'41.80"N, 14°11'31.67"E
    0 references
    26301
    0 references
    Projekt "Splašková kanalizace a ČOV Rybníky" řeší odvádění a likvidaci odpadních vod v obci Rybníky. Tento projekt navrhuje výstavbu 3489,28 m dlouhé splaškové tlakové kanalizace a výstavbu nové čistírny odpadních vod s 450 EO. Stoky tlakové kanalizace jsou navrženy z třívrstvých rour polyetylenových PE 100/SDR 11 v profilech D = 50 - 110 mm. Navržená technologie biologické čistírny odpadních vod pro kapacitu 450 EO (s přípravou na rozšíření o dalších 450 EO) integruje veškeré stupně čištění. (Czech)
    0 references
    The project “swage sewerage and wastewater treatment plant Rybníky” solves the drainage and disposal of waste water in the village of Rybníky. This project proposes the construction of a 3489.28 m long sewage sewage sewage system and the construction of a new sewage treatment plant with 450 EO. The sewers of pressure sewers are designed from three-layer polyethylene tubes PE 100/SDR 11 in profiles D = 50-110 mm. The proposed biological sewage treatment plant technology for the capacity of 450 EO (with preparation for an extension of an additional 450 EO) integrates all levels of treatment. (English)
    23 October 2020
    0 references
    Le projet «assainissement des eaux usées et station d’épuration Rybníky» porte sur la collecte et l’élimination des eaux usées dans le village de Rybníky. Ce projet propose la construction d’un réseau d’égouts d’une longueur de 3 489,28 m et la construction d’une nouvelle station de traitement des eaux usées de 450 EO. Les égouts sont conçus à partir de tuyaux à trois couches en polyéthylène PE 100/SDR 11 dans des profilés D = 50-110 mm. La technologie de station d’épuration biologique proposée pour une capacité de 450 EO (avec préparation à l’expansion par 450 autres EO) intègre toutes les étapes du traitement. (French)
    28 November 2021
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/15_021/0001332
    0 references