Building modifications of the building for the purpose of changing use to st.parc.no.115/1 (Q14334)

From EU Knowledge Graph
Revision as of 18:09, 28 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet a pour objet la reconstruction de la construction agricole initiale dans les locaux de production et de stockage du pouvoir adjudicateur. Les modifications apportées aux bâtiments n’augmenteront pas le bâtiment existant d’un étage, il y aura seulement des changements mineurs à l’intérieur et à l’aménagement des locaux. Après les travaux de construction, le bâtiment est divisé en deux installations de base pour les employés, la salle de...)
Jump to navigation Jump to search
Project Q14334 in Czech Republic
Language Label Description Also known as
English
Building modifications of the building for the purpose of changing use to st.parc.no.115/1
Project Q14334 in Czech Republic

    Statements

    0 references
    3,961,044.67 Czech koruna
    0 references
    158,441.79 Euro
    10 January 2020
    0 references
    8,802,321.49 Czech koruna
    0 references
    352,092.86 Euro
    10 January 2020
    0 references
    45.0 percent
    0 references
    21 November 2016
    0 references
    18 December 2017
    0 references
    31 December 2017
    0 references
    PVC OKNA s.r.o.
    0 references
    0 references

    49°35'19.90"N, 18°22'12.25"E
    0 references
    73911
    0 references
    Předmětem proejktu je rekonstrukce původně zemědělské stavby na výrobní a skladovací prostory zadavatele. Stavebními úpravami nedojde ke zvětšení jednopodlažního stávajícího objektu, bude docházet pouze k drobným změnám v interiéru a úpravě dispozice ? změně účelů jednotlivých místností. Po provedení stavebních úprav se objekt rozdělí do dvou základních částí ? zázemí pro zaměstnance, výrobní hala a expedice. Jako zázemí pro zaměstnance bude vytvořena denní místnost, šatna, sprchy a WC. a. (Czech)
    0 references
    The object of the project is the reconstruction of the originally agricultural construction into the production and storage space of the contracting authority. Building modifications will not increase the single-storey existing building, there will be only minor changes in the interior and the layout changes? change of the purpose of individual rooms. After the construction modifications have been carried out, the building is divided into two basic parts: facilities for employees, production hall and expedition. As a background for employees will be created day room, dressing room, showers and toilet. a. (English)
    22 October 2020
    0 references
    Le projet a pour objet la reconstruction de la construction agricole initiale dans les locaux de production et de stockage du pouvoir adjudicateur. Les modifications apportées aux bâtiments n’augmenteront pas le bâtiment existant d’un étage, il y aura seulement des changements mineurs à l’intérieur et à l’aménagement des locaux. Après les travaux de construction, le bâtiment est divisé en deux installations de base pour les employés, la salle de production et les expéditions. Comme arrière-plan pour les employés sera créé une salle de jour, dressing, douches et toilettes. (French)
    28 November 2021
    0 references

    Identifiers

    CZ.01.2.07/0.0/0.0/16_058/0007674
    0 references