Revitalisation of degraded areas of Smiltene City, I. (Q3057514)
Jump to navigation
Jump to search
Project Q3057514 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | Revitalisation of degraded areas of Smiltene City, I. |
Project Q3057514 in Latvia |
Statements
1,195,391.68 Euro
0 references
2,618,418.58 Euro
0 references
45.65 percent
0 references
19 October 2018
0 references
18 October 2020
0 references
Smiltenes novada pašvaldība
0 references
Projekta mērķis ir palielināt privāto investīciju apjomu Smiltenes novadā, veicot ieguldījumus komercdarbības attīstībai nepieciešamajā ielu infrastruktūrā. Pašvaldībai atbilstoši likumā “Par pašvaldībām” 15.pantam, nodrošinot vienu no tās autonomajam funkcijām - pārbūvēt komersantu darbībai nepieciešamo ielu infrastruktūru un uzbūvēt ražošanas ēku, bet komersantiem Ministru kabineta noteikumi Nr. 645 noteiktajā termiņā attīstīt savu komercdarbību, radot jaunas darba vietas un veicot nefinanšu investīcijas pašu nemateriālajos ieguldījumos un pamatlīdzekļos. Smiltenes novada dome, strādājot ar esošajiem un potenciālajiem investoriem, ir saskārusies ar problēmu, ka viens no galvenajiem šķēršļiem jaunu investīciju piesaistē ir nepieciešamās infrastruktūras trūkums. Smiltenes novada domes iecere ir veikt ceļu rekonstrukciju un uzbūvēt jaunu ražošanas ēku Limbažu ielā 8, Smiltenē, kur šīs projekta aktivitātes atbilsts Reģionālās politikas pamatnostādnēm 2013.-2019.gadam, kas apstiprinātas ar Ministru kabineta 2013.gada 29.oktobra rīkojumu Nr.496 „Par Reģionālās politikas pamatnostādnēm 2013.-2019.gadam” un Valdības rīcības plāna Deklarācijai par Māra Kučinska vadītā Ministru kabineta iecerēto darbību īstenošanu, kas nosaka nepieciešamību izvērtēt mehānismu, kā palielināt pašvaldību lomu investīciju piesaistes procesā un kā pašvaldības var sniegt pēc iespējas plašāku atbalstu uzņēmējiem. Šis atbalsts ir ļoti būtisks, jo Latvijā un Smiltenes novadā 99% ir tieši mazie un vidējie uzņēmumi un tā kā šie uzņēmumi ir nelieli, tos sevišķi ietekmē pārmaiņas nozarē un viņiem ir ierobežota finansiālā kapacitāte, kas nedod iespēju to straujākai attīstībai un jaunu ražošanas ēku būvniecībai. Projektā ir plānots realizēt Celtnieku ielas, Limbažu ielas un Gaujas ielas posmu asfaltēšanu (minētās ielas un to atzari, ar kopējo garumu 1,17 km), Limbažu ielas 8 teritorijas degradētās teritorijas sakārtošanu, ūdensapgādes, kanalizācijas un siltumapgādes pieslēguma izveidošanu un ārējo elektrisko tīklu un apgaismojuma pārbūvi. Projekta ietvaros ir arī plānots izbūvēt 49 publiskas stāvvietas, kas būs brīvi pieejamas un neierobežotas ar zīmēm un barjerām, kā arī ražošanas ēkas teritorijā Limbažu ielā plānots uzbūvēt 12 stāvvietas, 1 invalīda stāvvietu un 1 stāvvietu operatīvajam transportam. Pašvaldība plāno ražošanas ēkas izbūvi Limbažu ielā 8, kur šīs ražošanas telpas rīkojot atklātu izsoli tiks iznomātas ražošanas uzņēmumiem.Projekta īstenošanai paredzētas šādas darbības: ceļa posmu un ražošanas ēkas projektēšana, būvniecība, autoruzraudzība, būvuzraudzība. Projektā ir plānoti arī publicitātes pasākumi.Projektā ir plānots jaunu ūdensapgādes, kanalizācijas un siltumapgādes pieslēgumu izveidošana, un atbilst nosacījumiem par valsts atbalstu komercdarbībai.Sasniedzamie rezultāti ir: Pēc SIA “AW Latvia” ir 8 jaunas darba vietas un saskaņā SIA “AW Latvia” sniegto apliecinājumu par interesi komersants no 2015.gada līdz 2019. gadam savā ražotnē plāno investēt 344 394,00 EUR. Uzņēmums izstrādā jaunus produktus, palielina apgrozījumu produktu sortimentam, kā arī veic ieguldījuma investīcijas ražošanā. Uzņēmumā 2016.gadā veica investīcijas savos nemateriālajos ieguldījumos un pamatlīdzekļos, kas sastādīja 262 394,00 EUR. Komersants SIA “Artex Latvia” 2015. un 2016. gadā savā ražotnē investēja 42 872,00 EUR, bet līdz 2023. gadam plāno vēl investēt 211 180,00 EUR. un radīt 51 jaunu darba vietu. SIA “Troll Smiltene” plāno radīt 5 jaunas darba vietas un veikt investīcijas savos nemateriālajos ieguldījumos un pamatlīdzekļos 150 000,00 EUR. Projekta kopējās plānotās izmaksas ir EUR 2 711 823,11 EUR ar PVN 21%, tai skaitā, attiecināmās izmaksas ir EUR 2 618 418,58 EUR un plānotais ERAF līdzfinansējums no attiecināmām izmaksām ir EUR 1 195 391.68 EUR, bet projekta kopējās neattiecināmās izmaksas ir 93 404.53 EURProjekta īstenošanu plānots veikt 24 mēnešu laikā no projekta apstiprināšanas. Limbažu ielas, Gaujas ielas un Celtnieku ielas pārbūvi un asfaltēšanu un ražošanas ēkas būvniecību un teritorijas sakārtošanu plānots pabeigt līdz 2020.gada septembra beigām. (Latvian)
0 references
The aim of the project is to increase the amount of private investment in Smiltene municipality by investing in street infrastructure necessary for business development. In accordance with Article 15 of the Law “On Local Governments”, by providing one of its autonomous functions – to rebuild the street infrastructure necessary for the operation of merchants and build a production building, and merchants to develop their commercial activities within the time limit specified by Regulation No. 645 of the Cabinet of Ministers, creating new jobs and making non-financial investments in their own intangible investments and fixed assets. Working with existing and potential investors, Smiltene County Council has faced the problem that one of the main obstacles to attracting new investments is the lack of necessary infrastructure. Smiltene County Council’s intention is to reconstruct roads and build a new production building in Limbažu Street 8, Smiltene, where these project activities are in accordance with Regional Policy Guidelines 2013-2019 approved by Cabinet of Ministers Order No.496 of 29 October 2013 “On Regional Policy Guidelines 2013-2019” and Government Action Plan Declaration on implementation of planned activities by Māris Kučinskis, which determines the necessity to evaluate the mechanism, how to increase municipal investment role in the process. This support is very important because in Latvia and Smiltene district 99 % are small and medium-sized enterprises and, as these enterprises are small, they are particularly affected by changes in the sector and have limited financial capacity, which does not allow their faster development and construction of new production buildings. In the project it is planned to perform asphalting of sections of Celtnieku Street, Limbažu Street and Gaujas Street (mentioned streets and their branches, with a total length of 1.17 km), improvement of degraded territory of Limbažu Street 8, water supply, sewerage and heat supply connection, and reconstruction of external electrical networks and lighting. Within the framework of the project it is also planned to build 49 public parking places, which will be freely available and unrestricted with signs and barriers, as well as construction of 12 parking places, 1 disabled parking places and 1 parking places for operational transport in the territory of Limbažu Street. The municipality is planning to construct a production building at 8 Limbažu Street, where these production premises will be rented out to the production companies by organising an open auction. Road section and production building design, construction, author supervision, construction supervision. Publicity measures are also planned in the project.The project is planned to create new water supply, sewerage and heat supply connections and comply with the conditions for state support for commercial activities.The results to be achieved are: After SIA “AW Latvia” there are 8 new jobs and according to the confirmation of interest provided by SIA “AW Latvia” the merchant plans to invest EUR 344394,00 in its production unit from 2015 to 2019. The company develops new products, increases turnover for product assortment, as well as invests in production. In 2016 the company made investments in its intangible investments and fixed assets, which amounted to EUR 262394,00. Komersants SIA “Artex Latvia” invested EUR 42872,00 in its production plant in 2015 and 2016, but plans to invest EUR 211180.00 further until 2023 and create 51 new jobs. Troll Smiltene plans to create 5 new jobs and make investments in its intangible investments and fixed assets EUR 150000,00. The total planned cost of the project is EUR 2711823,11 with VAT 21 %, including the eligible costs EUR 2618418,58 and the planned ERDF co-financing from eligible costs is EUR 1195391.68, but the total ineligible costs of the project are EUR 93404.53 53 Project implementation is planned within 24 months from project approval. Reconstruction and asphalting of Limbažu Street, Gaujas Street and Celtnieku Street and construction of the production building and improvement of the territory is planned to be completed by the end of September 2020. (English)
15 July 2021
0 references
L’objectif du projet est d’augmenter le montant des investissements privés dans la région de Smiltene en investissant dans les infrastructures routières nécessaires au développement des entreprises. Conformément à l’article 15 de la loi sur les collectivités locales, en assumant l’une de ses fonctions autonomes, à savoir la reconstruction des infrastructures de rue nécessaires à l’exploitation des commerçants et la construction d’un bâtiment de fabrication, ainsi que le développement de leurs activités commerciales dans le délai fixé par le règlement no 645 du Conseil des ministres, la création d’emplois et la réalisation d’investissements non financiers dans leurs propres investissements incorporels et immobilisations. Smiltene County Council, en collaboration avec des investisseurs existants et potentiels, a été confronté au problème que l’un des principaux obstacles à l’attraction de nouveaux investissements est le manque d’infrastructures nécessaires. L’intention du conseil du comté de Smiltene est de reconstruire les routes et de construire un nouveau bâtiment industriel au 8, rue Limbažu, à Smiltene, où ces activités de projet sont conformes aux lignes directrices de la politique régionale 2013-2019, qui ont été approuvées par l’arrêté ministériel no 496 du 29 octobre 2013 sur les orientations de politique régionale 2013-2019 et la déclaration du plan d’action gouvernemental sur la mise en œuvre des activités prévues du Conseil des ministres dirigé par Māra Kučinskis, qui détermine la nécessité d’évaluer le mécanisme permettant d’accroître le rôle des collectivités locales dans le processus d’attraction des investissements et la manière dont les gouvernements locaux peuvent apporter le plus large soutien possible aux entrepreneurs. Ce soutien est très important parce qu’en Lettonie et dans le comté de Smiltene, 99 % sont des petites et moyennes entreprises, et parce qu’elles sont petites, elles sont particulièrement touchées par les changements dans le secteur et ont une capacité financière limitée, ce qui ne permet pas leur développement plus rapide et la construction de nouveaux bâtiments industriels. Dans le projet, il est prévu de mettre en œuvre l’asphaltage des sections de la rue Celtnieku, de la rue Limbažu et de la rue Gaujas (lesdites rues et leurs branches, d’une longueur totale de 1,17 km), l’aménagement du territoire dégradé du territoire de Limbažu iela 8, la création d’un raccordement à l’approvisionnement en eau, l’assainissement et l’approvisionnement en chaleur, et la reconstruction des réseaux électriques externes et de l’éclairage. Dans le cadre du projet, il est également prévu de construire 49 parkings publics, qui seront librement accessibles et illimités avec des panneaux et des barrières, ainsi que dans la zone du bâtiment de production sur la rue Limbažu, il est prévu de construire 12 places de stationnement, 1 place de stationnement pour personnes handicapées et 1 place de stationnement pour le transport d’urgence. La municipalité prévoit la construction d’un bâtiment de production au 8, rue Limbažu, où ces installations de production seront louées à des entreprises manufacturières par l’organisation d’une vente aux enchères ouverte. Les activités suivantes sont envisagées pour la mise en œuvre du projet: conception de la section routière et de la production, construction, supervision de l’auteur, supervision de la construction. Des actions de publicité sont également prévues dans le projet. Le projet prévoit la mise en place de nouvelles connexions d’approvisionnement en eau, d’assainissement et de chauffage et respecte les conditions d’octroi d’aides d’État aux activités commerciales. Les résultats à atteindre sont les suivants: Après SIA «AW Lettonie» il y a 8 nouveaux emplois et selon SIA «AW Lettonie» confirmation d’intérêt, le commerçant prévoit d’investir 344 394,00 EUR dans son usine de production de 2015 à 2019. L’entreprise développe de nouveaux produits, augmente le chiffre d’affaires pour l’assortiment de produits, ainsi que des investissements dans la production. En 2016, l’entreprise a investi dans ses investissements incorporels et ses immobilisations, qui s’élevaient à 262 394,00 EUR. En 2015 et 2016, l’entreprise a investi 42 872,00 EUR dans son usine, mais d’ici 2023 prévoit d’investir 211 180,00 EUR et de créer 51 nouveaux emplois. SIA «Troll Smiltene» prévoit de créer 5 nouveaux emplois et d’investir dans ses investissements incorporels et ses immobilisations 15 000,00 EUR Le coût total prévu du projet s’élève à 2 711 823,11 EUR avec TVA 21 %, y compris les coûts éligibles 2 618 418,58 EUR et le cofinancement prévu par le FEDER des coûts éligibles 1 195 391,68 EUR, tandis que les coûts totaux inéligibles du projet s’élèvent à 93 404,53 EUR. La reconstruction et l’asphalte des rues Limbazu, Gaujas et Celtnieku ainsi que la construction du bâtiment de production et de l’aménagement du territoire devraient être achevées d’ici la fin du mois de septembre 2020. (French)
25 November 2021
0 references
Smiltene, Smiltenes nov.
0 references
Smiltene, Smiltenes nov.
0 references
Smiltene, Smiltenes nov.
0 references
Smiltene, Smiltenes nov.
0 references
Identifiers
5.6.2.0/17/I/027
0 references