Insulation and reconstruction of the building in Ogre, Parka street 1, adapting to the needs of a preschool educational institution (Q3057156)
Jump to navigation
Jump to search
Project Q3057156 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | Insulation and reconstruction of the building in Ogre, Parka street 1, adapting to the needs of a preschool educational institution |
Project Q3057156 in Latvia |
Statements
139,714.04 Euro
0 references
389,284.02 Euro
0 references
35.89 percent
0 references
16 October 2017
0 references
15 October 2018
0 references
Ogres novada pašvaldība
0 references
Projekta mērķis ir samazināt oglekļa dioksīda emisijas un primārās enerģijas patēriņu, sekmējot energoefektivitātes paaugstināšanu un izdevumu samazināšanos par siltumapgādi ēkai Parka ielā 1, Ogrē atbilstoši pašvaldības attīstības programmas noteiktajai prioritātei, kā arī mainot ēkas funkciju uz pirmskolas izglītības iestādi.Projekta mērķa grupa ir pašvaldība un pilsētas iedzīvotāji, it sevišķi, vecāki ar bērniem pirmsskolas vecumā.Galvenās projekta darbības:1. Būvdarbi un būvprojekta izstrāde ar autoruzraudzību;2. Būvuzraudzība;3. Būvprojekta ekspertīze;4. Publicitātes pasākumu nodrošināšana (informatīvais plakāts un publikācijas pašvaldības mājas lapā).Plānotie rezultāti pēc projekta īstenošanas ir:-primārās enerģijas gada patēriņa samazinājums sabiedriskajās ēkās - 104 269 kWh/gadā;-aprēķinātais siltumnīcefekta gāzu samazinājums gadā - 19,256 CO2 ekvivalenta tonnas/ gadā.Projekta kopējās attiecināmās izmaksas sastāda 509 933,24 EUR no kuriem 166 000,00 EUR ir Eiropas reģionālā attīstības fonda līdzfinansējums.Projekta īstenošanas ilgums ir 12 mēneši, bet projekta plānotais uzsākšanas datums ir 2017.gada 11.augusts un projekta īstenošanas beigu datums 2018.gada 10.augusts. (Latvian)
0 references
The aim of the project is to reduce carbon dioxide emissions and primary energy consumption by promoting energy efficiency and reduction of expenditure on heating for the building at Parka Street 1, Ogre in accordance with the priority set by the municipality’s development programme, as well as by changing the function of the building to a pre-school educational institution.The target group of the project is the municipality and inhabitants of the city, especially parents with children at pre-school age. Construction works and development of a construction project with author supervision;2. Construction supervision;3. Construction project expertise;4. The planned results after project implementation are: – reduction of annual consumption of primary energy in public buildings – 104269 kWh/year;-calculated annual greenhouse gas reduction – 19.256 CO2 equivalent tons/year.The total eligible costs of the project are EUR 509933.24 of which EUR 166000.00 is co-financing from the European Regional Development Fund.The duration of the project is 12 months, but the planned start date of the project is 11 August 10. (English)
15 July 2021
0 references
L’objectif du projet est de réduire les émissions de dioxyde de carbone et la consommation d’énergie primaire en contribuant à l’amélioration de l’efficacité énergétique et en réduisant les dépenses de chauffage du bâtiment de la 1 rue Parka, Ogre, conformément à la priorité fixée par le programme de développement des collectivités locales, ainsi qu’en changeant la fonction du bâtiment en établissement d’enseignement préscolaire. Le groupe cible du projet est la municipalité et les habitants de la ville, en particulier les parents ayant des enfants d’âge préscolaire. Travaux de construction et développement d’un projet de construction avec la supervision de l’auteur;2. Supervision de la construction;3. Examen de la conception du bâtiment;4. Mise à disposition de mesures de publicité (affiche d’information et publications sur le site web de l’administration locale).Les résultats escomptés après la mise en œuvre du projet sont:-la réduction de la consommation annuelle d’énergie primaire dans les bâtiments publics — 104 269 kWh/an;-la réduction annuelle estimée des gaz à effet de serre — 19,256 tonnes équivalent CO2/an.Les coûts totaux éligibles du projet s’élèvent à 509 933,24 EUR, dont 166 000,00 EUR sont cofinancés par le Fonds européen de développement régional. La durée de mise en œuvre du projet est de 12 mois, mais la date prévue de début du projet est le 11 août 2017 et la date de fin de la mise en œuvre du projet le 10 août 2018. (French)
25 November 2021
0 references
Parka iela 1, Ogre, Ogres nov., LV-5001
0 references
Identifiers
4.2.2.0/17/I/006
0 references