Enhancement of Energy Efficiency at Daugavpils City Preschool Education Institution No.28 – Liepājas iela 37, Daugavpils (Q3057088)

From EU Knowledge Graph
Revision as of 09:32, 28 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Im Rahmen des Projekts „Erhöhung der Energieeffizienz in der vorschulischen Bildungseinrichtung von Daugavpils Nr. 28 – Liepājas Street 37, Daugavpils“ ist der Wiederaufbau des Gebäudes der Institution vorgesehen, um die Energieeffizienz zu verbessern. Ziel des Projekts: Beitrag zur Verbesserung der Energieeffizienz des Gebäudes der 28. vorschulischen Bildungseinrichtung in Daugavpils, Liepājas Straße 37, durch Senkung des Primärenergieverbrauch...)
Jump to navigation Jump to search
Project Q3057088 in Latvia
Language Label Description Also known as
English
Enhancement of Energy Efficiency at Daugavpils City Preschool Education Institution No.28 – Liepājas iela 37, Daugavpils
Project Q3057088 in Latvia

    Statements

    0 references
    0 references
    388,959.51 Euro
    0 references
    478,954.66 Euro
    0 references
    81.21 percent
    0 references
    18 February 2019
    0 references
    17 August 2021
    0 references
    DAUGAVPILS PILSĒTAS DOME
    0 references
    0 references

    55°52'58.55"N, 26°33'1.91"E
    0 references
    Projekta “Energoefektivitātes paaugstināšana Daugavpils pilsētas pirmsskolas izglītības iestādē Nr.28 - Liepājas ielā 37, Daugavpilī” apraksts” ietvaros ir paredzēta iestādes ēkas pārbūve energoefektivitātes paaugstināšanas nodrošināšanai. Projekta mērķis: sekmēt Daugavpils pilsētas 28.pirmsskolas izglītības iestādes ēkas Liepājas ielā 37 energoefektivitātes paaugstināšanu, samazinot primārās enerģijas patēriņu.Projekta galvenās darbības:•Projekta pamatojošās dokumentācijas izstrādāšanaoBūvprojekta izstrāde;oBūvprojekta ekspertīzes veikšana.•Būvdarbu veikšanaoĀrējās fasādes nosiltināšana;oCokola siltināšana;oJumta pārsegumu nosiltināšana;oPagraba pārsegumu nosiltināšana;oVentilācijas sistēmas izbūve;oApkures sistēmas rekonstrukcija;oApgaismojuma nomaiņa.•Autoruzraudzība•Būvuzraudzība•Projekta publicitātes nodrošināšana•Būves nodošana ekspluatācijāProjekta ilgums: projekta aktivitātes tika uzsāktas 2016.gadā, pirms vienošanās par projekta īstenošanu parakstīšanas. Projekta īstenošana nodrošinās pašvaldības izglītības pakalpojumu kvalitāti un šo iestāžu energoefektivitātes palielināšanu, kā arī uzlabos ēku ārējo izskatu un pilsētvides pievilcību.Plānotais projekta īstenošanas ilgums: 30 mēneši.Darbi tika uzsākti 2016.gada 17.augustā, kad tika noslēgts līgums par būvprojekta minimāla sastāvā, būvprojekta izstrādi un autoruzraudzību būvobjektam “28. pirmsskolas izglītības iestādes ēkas energoefektivitātes paaugstināšana, vides pieejamības prasību nodrošināšana”.Projekta kopējās izmaksas: EUR 1 023 432.42, t.sk.attiecināmās izmaksas EUR 478 954.66, t.sk. ERAF finansējums ir EUR 388 959.51Projekta plānotie rezultāti:•tiks samazināts primārās enerģijas patēriņš un siltumnīcefekta gāzu emisijas, sekmējot ilgtermiņā energoefektivitātes paaugstināšanu un pašvaldības izdevumu samazināšanos par siltumapgādi, •tiks sasniegtas energoefektivitātes prasības atbilstoši Latvijas būvnormatīvā LBN 002-15 “Ēku norobežojošo konstrukciju siltumtehnika”. (Latvian)
    0 references
    Within the framework of the project “Enhancement of Energy Efficiency at Daugavpils City Preschool Education Institution No.28 – Liepājas Street 37, Daugavpils” the reconstruction of the building to ensure energy efficiency improvement is envisaged. The aim of the project shall be: Promote improvement of energy efficiency of Daugavpils city 28th preschool educational institution building at Liepaja Street 37 by reducing primary energy consumption.Project main activities:•Project supporting documentation Development of construction project expertise;OConstruction of project expertise.•Construction of constructional facadesInsulating the external facades;OOCokola Insulation;oInsurance of the cover;oInsurance of building blocksInsurance of external facades•Insurance of the project in service•Publication of duration of project.OInsurance of the cover;Outhorisation of the cover;Insurance of the project in service•Projection duration•Ventation of the project;OAuthorisation of construction;OBuperation supervision;Probrication of project duration•Conditioning of project;Outhorisation of construction;Outhoral supervision of insucuracy of project in service•Presentation of project in service•Voration of project;OBuling of constructions;Outhoral supervision of in-service systems•Presentation of project in service•Construction of project insulation;OInsulate of construction;OInsulation of project coverage;OBuclear construction;Probrication in service•Construction of project;OInsulation of the project;OInsulation of the project;OInsulation of the project;OInsulation of construction works;OConstruction of construction worksInsulating the construction of external facades•Insulation of the project;OBoCokola Insulation;oInsulation of the coverings of the project;OBubric supervision of the construction of the project in service•Pre-servicesCondition of the project•Condition of the project;OInsulation of covers;OBuration of the basement:insulation of external facades•Insulation of project in service•Publication of the project;OInsulsion of construction;Oauticulty of construction of building covers;Insulating the construction of external facades•Pro Project activities started in 2016, before signing the agreement on project implementation. Project implementation will ensure the quality of municipal education services and increase the energy efficiency of these institutions, as well as improve the external appearance of buildings and attractiveness of the urban environment. 30 months.Works were started on August 17, 2016, when the contract on construction project’s minimum composition, development of construction project and author supervision of the construction object “28 energy efficiency improvement of preschool institution building, provision of environmental accessibility requirements” was signed.Project total costs: EUR 1 023 432.42, of which eligible costs EUR 478 954.66, of which: ERDF funding is EUR 388 959.51Project’s planned results:•The primary energy consumption and greenhouse gas emissions will be reduced, contributing to the long-term improvement of energy efficiency and reduction of municipal expenditure on heating, • the energy efficiency requirements will be achieved in accordance with the Latvian building norm LBN 002-15 “Heat engineering of building envelopes”. (English)
    15 July 2021
    0 references
    Dans le cadre du projet «Amélioration de l’efficacité énergétique dans l’établissement d’enseignement préscolaire de Daugavpils no 28 — rue Liepājas 37, Daugavpils», la reconstruction du bâtiment de l’établissement est envisagée afin d’améliorer l’efficacité énergétique. Objectif du projet: contribuer à l’amélioration de l’efficacité énergétique du bâtiment de la 28e institution d’enseignement préscolaire de Daugavpils, rue Liepājas 37, en réduisant la consommation d’énergie primaire.Les principales activités du projet sont les suivantes:•Développement de la documentation du projet de constructionoDéveloppement du projet de construction; oConstruction de l’expertise du projet.•Les travaux de construction sont menés outoInsulation de la façade extérieure;oisolation du col; OToiture des revêtements de toiture; isolation des cloisonnements sous-sols;oConstruction du système de ventilation;oReconstruction du système de chauffage;oRemplacement de l’éclairage.•Suivi du droit d’auteur•Suivi de la construction•Provision de la publicité du projet•Mise en service de la constructionLa durée du projet: les activités du projet ont débuté en 2016, avant de signer l’accord sur la mise en œuvre du projet. La mise en œuvre du projet permettra d’assurer la qualité des services éducatifs municipaux et d’accroître l’efficacité énergétique de ces établissements, ainsi que d’améliorer l’aspect extérieur des bâtiments et l’attractivité de l’environnement urbain. 30 mois. Les travaux ont commencé le 17 août 2016, lorsque le contrat a été signé sur la composition minimale de la conception de la construction, le développement de la conception de la construction et la supervision des auteurs pour l’objet de construction «28. Augmentation de l’efficacité énergétique d’un bâtiment d’un établissement d’enseignement préscolaire, garantissant les exigences en matière d’accessibilité environnementale».Le coût total du projet: 1 023 432,42 EUR, dont un coût éligible de 478 954,66 EUR, dont: Le financement du FEDER s’élève à 388 959,51 EUR Résultats prévus du projet:•La consommation d’énergie primaire et les émissions de gaz à effet de serre seront réduites, contribuant à l’amélioration à long terme de l’efficacité énergétique et à la réduction des dépenses des administrations locales en matière de chauffage, • les exigences en matière d’efficacité énergétique seront satisfaites conformément à la norme lettone de construction LBN 002-15 «Ingénierie thermique des enveloppes des bâtiments». (French)
    25 November 2021
    0 references
    Im Rahmen des Projekts „Erhöhung der Energieeffizienz in der vorschulischen Bildungseinrichtung von Daugavpils Nr. 28 – Liepājas Street 37, Daugavpils“ ist der Wiederaufbau des Gebäudes der Institution vorgesehen, um die Energieeffizienz zu verbessern. Ziel des Projekts: Beitrag zur Verbesserung der Energieeffizienz des Gebäudes der 28. vorschulischen Bildungseinrichtung in Daugavpils, Liepājas Straße 37, durch Senkung des Primärenergieverbrauchs.Die Hauptaktivitäten des Projekts sind:•Entwicklung des Projekts zur Unterstützung der DokumentationEntwicklung des Bauprojekts;oBauprojekt-Expertise.•Die Bauarbeiten werden durchgeführt. ORoofing von Dachbelägen; Isolierung von Kellerbereichen;oBau des Lüftungssystems;oRekonstruktion des Heizsystems;oErneuerung der Beleuchtung.•Copyright Monitoring•Bauaufsicht•Vorbereitung der Projektpublikation•KonstruktionierungDie Dauer des Projekts: die Projektaktivitäten wurden 2016 begonnen, bevor die Vereinbarung über die Durchführung des Projekts unterzeichnet wurde. Die Durchführung des Projekts wird die Qualität der kommunalen Bildungsdienstleistungen gewährleisten und die Energieeffizienz dieser Einrichtungen erhöhen sowie das äußere Aussehen der Gebäude und die Attraktivität der städtischen Umwelt verbessern. 30 Monate. Die Arbeiten begannen am 17. August 2016, als der Vertrag über die Mindestzusammensetzung der Bauplanung, die Entwicklung des Bauentwurfs und die Betreuung der Autoren für das Bauobjekt „28. Steigerung der Energieeffizienz eines Gebäudes der Vorschulbildungseinrichtung, die Gewährleistung der Anforderungen an die umweltgerechte Zugänglichkeit“ unterzeichnet wurde.Die Gesamtkosten des Projekts: 1 423 432,42 EUR, davon zuschussfähige Kosten 478 954,66 EUR, davon: Die aus dem EFRE finanzierten Mittel belaufen sich auf 388 959,51 EUR:•Primärer Energieverbrauch und Treibhausgasemissionen werden gesenkt, was zur langfristigen Verbesserung der Energieeffizienz und zur Verringerung der Heizkosten der lokalen Gebietskörperschaften beiträgt. • Der Energieeffizienzbedarf wird im Einklang mit dem lettischen Baustandard LBN 002-15 „Thermal Engineering of Building envelopes“ erreicht. (German)
    28 November 2021
    0 references
    Liepājas iela 37, Daugavpils, LV-5404
    0 references

    Identifiers

    4.2.2.0/18/I/063
    0 references