Energy efficiency improvement and reconstruction of the service hotel on Ausekļa Street (Q3057057)

From EU Knowledge Graph
Revision as of 09:32, 28 November 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de: translated_label)
Jump to navigation Jump to search
Project Q3057057 in Latvia
Language Label Description Also known as
English
Energy efficiency improvement and reconstruction of the service hotel on Ausekļa Street
Project Q3057057 in Latvia

    Statements

    0 references
    381,066.0 Euro
    0 references
    1,001,278.88 Euro
    0 references
    38.06 percent
    0 references
    25 September 2020
    0 references
    24 December 2022
    0 references
    Valmieras novada pašvaldība
    0 references
    0 references
    Projekta mērķis ir samazināt primārās enerģijas patēriņu, sekmējot energoefektivitātes paaugstināšanu pašvaldības ēkā Ausekļa ielā 25C, Valmierā un pašvaldību izdevumu samazināšanos par siltumapgādi.Pēc projekta īstenošanas, ņemot vērā abu ēku (būvju) savienošanu, dienesta viesnīcai tiks piešķirta adrese Ausekļa iela 25B, Valmiera, attiecīgi dzēšot adresi Ausekļa iela 25C, Valmiera. (Pašvaldības domes 30.03.2017. lēmums Nr.139 “Par adreses Ausekļa iela 25B, Valmiera, piešķiršanu).Projekta galvenās darbības ir:1. Būvdarbu veikšana;2. Būvuzraudzība (būvuzraudzības izmaksas projektā nav iekļautas); 3. Autoruzraudzība (autoruzraudzības izmaksas projektā nav iekļautas); 4. Publicitātes pasākumi par projekta īstenošanu.Projekta rezultātā tiks veikta pašvaldības ēkas Ausekļa ielā 25C, Valmierā pārbūve un energoefektivitātes paaugstināšana – ēkas ārējo norobežojošo konstrukciju uzlabošana, ēkas tehnisko sistēmu uzlabošana. Projekta kopējās izmaksas ir 1 395 737,93 EUR, no tām attiecināmās izmaksas ir 1 001 278,88 EUR, t.sk. ERAF finansējums 381 066,00 EUR. Projekts tiks īstenots 27 mēnešus pēc vienošanās par projekta īstenošanu noslēgšanas, bet ne ilgāk kā līdz 31.12.2022. (Latvian)
    0 references
    The aim of the project is to reduce primary energy consumption by promoting energy efficiency improvement in the municipal building at 25C Ausekļa Street, Valmiera and the reduction of local government expenditure on heating.After project implementation, taking into account the connection of the two buildings, the service hotel will be assigned the address Ausekļa iela 25B, Valmiera, by deleting the address Ausekļa street 25C, Valmiera. (Decision No.139 of the Municipal Council of 30.03.2017 "On assignment of addresses at 25B Ausekļa Street, Valmiera).The main activities of the project are:1. Execution of works;2. Construction supervision (costs of supervision of construction are not included in the project); 3. Author supervision (authorisation costs are not included in the project); 4. Publicity measures on the implementation of the project.The project will result in reconstruction of the municipal building at 25C Ausekļa Street, Valmiera and improvement of energy efficiency – improvement of the building’s external envelopes, improvement of the technical systems of the building. The total cost of the project is EUR 1395737,93, of which the eligible costs are EUR 1001278,88, incl. ERDF funding EUR 381066,00. The project will be implemented 27 months after the conclusion of the agreement on the implementation of the project, but not later than on 31.12.2022. (English)
    15 July 2021
    0 references
    L’objectif du projet est de réduire la consommation d’énergie primaire en contribuant à l’amélioration de l’efficacité énergétique dans le bâtiment municipal du 25C rue Ausek’a, Valmiera et à la réduction des dépenses des collectivités locales pour le chauffage. Après la mise en œuvre du projet, compte tenu de la connexion des deux bâtiments (bâtiments), l’hôtel de service se verra attribuer une adresse Ausek’a iela 25B, Valmiera, en supprimant ainsi l’adresse Ausek’a iela 25C, Valmiera. (Décision du conseil local no 139 du 30.03.2017 "Sur la mission de l’adresse Ausek’a iela 25B, Valmiera). Les principales activités du projet sont:1. Exécution des travaux de construction;2. Supervision de la construction (les coûts de supervision de la construction ne sont pas inclus dans le projet); 3. Supervision de l’auteur (les coûts d’authentification ne sont pas inclus dans le projet); 4. À la suite du projet, la reconstruction du bâtiment municipal du 25C rue Ausek’a, Valmiera et l’amélioration de l’efficacité énergétique — amélioration des enveloppes extérieures du bâtiment, amélioration des systèmes techniques du bâtiment seront réalisées. Le coût total du projet s’élève à 1 395 737,93 EUR, dont les coûts éligibles sont de 1 001 278,88 EUR, dont Le FEDER financera 381 066,00 EUR. Le projet sera mis en œuvre 27 mois après la conclusion de l’accord sur la mise en œuvre du projet, mais pas plus longtemps qu’au 31.12.2022. (French)
    25 November 2021
    0 references

    Identifiers

    4.2.2.0/19/I/003
    0 references