46,395.6 Euro
0 references
54,583.06 Euro
0 references
85.0 percent
0 references
29 May 2019
0 references
28 June 2021
0 references
Dabas aizsardzības pārvalde
0 references
Projekta mērķis ir būtiski paaugstināt energoefektivitāti Dabas aizsardzības pārvaldes (turpmāk – DAP) turējumā ar 2017.gada 14.novembra Valsts nekustamā īpašuma pārvaldīšanas līgumu Nr. NĪ/7/201, kas noslēgts starp Vides aizsardzības un reģionālās attīstības ministriju un Dabas aizsardzības pārvaldi, nodotajai administratīvajai ēkai Aiviekstes ielā 3, Ļaudonā, Ļaudonas pagastā, Madonas novadā (turpmāk –Administratīvā ēka).Projekta mērķa sasniegšanai paredzēts visu Administratīvās ēkas ārsienu atjaunošana un siltināšana, cokola atjaunošana, visu logu nomaiņa, veco durvju izņemot galveno ieejas durvju nomaiņa, bēniņu grīdas siltināšana, maģistrālo apkures sistēmas cauruļvadu nomaiņa un jauna kokskaidu granulu apkures katla uzstādīšana, esošo kvēlspuldžu, luminiscences un halogēno apgaismojuma spuldžu nomaiņa pret LED spuldzēm.Paredzēts nodrošināt būvuzraudzību un autoruzraudzību, kvalitatīvai projekta ieviešanai. Tiks nodrošināta arī projekta vadība. DAP nodrošinās projekta publicitātes pasākumus.Projekta ilgums no plānotās vienošanās parakstīšanu par projekta īstenošanu, plānots 25 (divdesmit pieci) mēneši.Kopējās projekta izmaksas ir 117 434,90 EUR, no kurām kopējās attiecināmās izmaksas ir 54 583,06 EUR, bet neattiecināmās izmaksas - 62 851,84 EUR. Projekts tiks īstenots piesaistot publisko finansējumu, tai skaitā Eiropas Reģionālās attīstības fonda finansējumu 85% apmērā no attiecināmajām izmaksām jeb 46 395,60 EUR, kā arī valsts budžeta finansējumu 15% apmērā no attiecināmajām izmaksām jeb 8 187,46 EUR.Publiskā finansējuma apmērs attiecināmajām izmaksām uz vienu ēkas kopējās platības kvadrātmetru 54 583.06/410.40 m2 = 133,00 EUR.Realizējot projektu tiek plānots:-Siltumenerģijas patēriņa samazinājums gadā – 138.50 kWh/m2 gadā (228.30-89.80);-Aprēķinātais siltumnīcefekta gāzu samazinājums – 17.37% gadā.-Samazinājums no siltumenerģijas patēriņa – 52.29 % (Latvian)
0 references
The aim of the project is to significantly improve the energy efficiency of the Nature Conservation Agency (hereinafter – DAP) with the State Real Estate Management Contract of 14 November 2017, signed between the Ministry of Environmental Protection and Regional Development and the Nature Conservation Agency, for the transferred administrative building on Aiviekstes Street 3, Elephant Lighting in Halloween, Luminaires in the Municipality of Madona (hereinafter – Administrative Building). Project management will also be ensured. Project duration from the signing of the planned agreement on project implementation is planned for 25 (twenty-five) months.The total cost of the project is EUR 117434,90, of which the total eligible costs are EUR 54583,06, but the ineligible costs – EUR 62851,84.The project will be implemented by attracting public funding, including the European Regional Development Fund funding of 85 % of eligible costs or EUR 46395,60, as well as the state budget financing of 15 % from the eligible costs – 8187,80-17-37.00-00. (English)
15 July 2021
0 references
L’objectif de ce projet est d’accroître de manière significative l’efficacité énergétique dans l’exploitation de l’Agence pour la conservation de la nature (ci-après dénommée «DAP») par l’accord d’État de gestion immobilière n°7/201 du 14 novembre 2017, conclu entre le ministère de la protection de l’environnement et du développement régional et l’Agence pour la conservation de la nature, transféré au bâtiment administratif du 3 rue Aiviekstes, Laudona, paroisse de Laudona, municipalité de Madona (ci-après «bâtiment administratif»). remplacement de toutes les fenêtres, remplacement des vieilles portes à l’exception des portes d’entrée principales, isolation des planchers greniers, remplacement des canalisations du système de chauffage principal et installation d’une nouvelle chaudière de chauffage à granulés de bois, remplacement des lampes à incandescence existantes, lampes fluorescentes et halogènes par des ampoules LED. La gestion du projet sera également assurée. Le DDA fournira des mesures de publicité pour le projet. La durée du projet à compter de la signature prévue de l’accord de mise en œuvre du projet est prévue pour 25 (vingt-cinq) mois. Les coûts totaux du projet s’élèvent à 117 434,90 EUR, dont le total des coûts éligibles s’élève à 54 583,06 EUR, et les coûts non éligibles sont de 62 851,84 EUR. Le projet sera mis en œuvre avec un financement public, y compris un financement par le Fonds européen de développement régional à hauteur de 85 % des coûts éligibles ou de 46 395,60 EUR, ainsi qu’un financement par le budget de l’État à partir de 15 % des coûts éligibles ou 8 887,46 EUR. (French)
25 November 2021
0 references
Aiviekstes iela 3, Ļaudona, Ļaudonas pag., Madonas nov., LV-4862
0 references
Identifiers
4.2.1.2/18/I/029
0 references