Putting infrastructure in place for business development in Gulbene (Q3056792)

From EU Knowledge Graph
Revision as of 09:31, 28 November 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de: translated_label)
Jump to navigation Jump to search
Project Q3056792 in Latvia
Language Label Description Also known as
English
Putting infrastructure in place for business development in Gulbene
Project Q3056792 in Latvia

    Statements

    0 references
    0 references
    0 references
    504,004.5 Euro
    0 references
    614,789.58 Euro
    0 references
    81.98 percent
    0 references
    12 September 2018
    0 references
    11 January 2020
    0 references
    Gulbenes novada pašvaldība
    0 references
    0 references

    57°9'35.82"N, 26°45'28.91"E
    0 references

    57°9'38.38"N, 26°45'48.49"E
    0 references
    Projekta "Infrastruktūras sakārtošana uzņēmējdarbības attīstībai Gulbenes pilsētā" mērķis ir palielināt privāto investīciju apjomu Gulbenes pilsētā un novadā, veicot ieguldījumus komercdarbības attīstībā atbilstoši pašvaldības attīstības programmā noteiktajam un balstoties uz komersantu vajadzībām.Projekta ietvaros tiks veikta:1) Kalēju ielas pārbūve (145 m) un publisko stāvvietu izbūve (11 vietas);2) Purva ielas posma pārbūve (150 m), lietus ūdens novades sistēmas izbūve, ietves izbūve un apgaismojuma ierīkošana;3) Klēts ielas posma pārbūve (85 m), lietus ūdens novades sistēmas izbūve, ietves izbūve;4) Pils ielas posma pārbūve (124 m), lietus ūdens novades sistēmas izbūve.Projekta īstenošanas rezultātā tiks radītas vismaz 8 darba vietas un veiktas nefinanšu investīcijas pašu nemateriālajos ieguldījumos un pamatlīdzekļos 504 636 EUR apmērā.Projekta īstenošanai nepieciešamais laika periods ir 16 mēneši.Projekta kopējās izmaksas 675 696,19 EUR, no tām attiecināmās izmaksas ir 615'554.58 EUR; 81.98% jeb 504'636,00 EUR ERAF finansējums, 4,50 % jeb 27'729.65 EUR valsts budžeta dotācija pašvaldībām un 13,51 % 83'188.93 EUR pašvaldības finansējums. Neattiecināmās izmaksas ir 60'141.61 EUR (elektronisko sakaru tīklu aizsardzība un ūdensapgādes sistēmas pārbūve), un tās segtas no pašvaldības budžeta finansējuma. (Latvian)
    0 references
    The aim of the project “Adjusting infrastructure for business development in Gulbenes city” is to increase the amount of private investments in Gulbene city and county by investing in the development of commercial activities in accordance with the requirements of the municipal development programme. 81.98 % or EUR 504'636.00 ERDF funding, 4.50 % or EUR 27'729.65 state budget grant to municipalities and 13.51 % 83'188.93 municipal funding. The ineligible costs are EUR 60'141.61 (protection of electronic communications networks and reconstruction of the water supply system) and are covered by the budget of the municipality. (English)
    15 July 2021
    0 references
    L’objectif du projet "Ajustement des infrastructures pour le développement des entreprises dans la ville de Gulbene" est d’augmenter le montant des investissements privés dans la ville et la municipalité de Gulbene en investissant dans le développement des activités commerciales conformément au programme de développement de l’administration locale et en fonction des besoins des commerçants. Le projet sera réalisé: 1) la reconstruction de la rue Kalēju (145 m) et la construction d’espaces de stationnement publics (11 places); 2) la reconstruction du tronçon de la rue Purva (150 m), la construction du système de drainage des eaux pluviales, la construction de la chaussée et l’installation d’éclairage; 3) la reconstruction du tronçon de la rue KlÄ"te (85 m), la construction du système de drainage des eaux de pluie, la construction de la chaussée; 4) la reconstruction du tronçon de la rue Pils (124 m), la construction du système de drainage des eaux de pluie. dont les coûts éligibles s’élèvent à 615 554,58 EUR; 81,98 %, soit 504’636,00 EUR de financement du FEDER, 4,50 % ou 27 729,65 EUR de subvention du budget de l’État aux municipalités et 13,51 % 83 188,93 EUR de financement des collectivités locales. Les coûts inéligibles sont de 601 411,61 EUR (protection des réseaux de communications électroniques et reconstruction du système d’approvisionnement en eau) et sont couverts par le budget des collectivités locales. (French)
    25 November 2021
    0 references
    Stradu pag., Gulbenes nov.
    0 references
    Purva iela, Gulbene, Gulbenes nov.
    0 references
    Pils iela, Gulbene, Gulbenes nov.
    0 references
    Klēts iela, Gulbene, Gulbenes nov.
    0 references

    Identifiers

    3.3.1.0/17/I/032
    0 references