Modernisation and greening of heat production in Nitra – Klokočina and Parts by high efficiency cogeneration (Q3107395)

From EU Knowledge Graph
Revision as of 16:28, 27 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objet du projet intitulé «Modernisation et verdissement de la production de chaleur à Nitra — Klokočina et Parts par cogénération à haut rendement» est l’installation de nouvelles installations de production combinée de chaleur et d’électricité (CHP) dans les chaudières existantes (CHP) — chaufferies de district VS1, VS4, VS8 et K1 dans les domaines Klokočina et Diely à Nitra. Les chaudières à gaz obsolètes (PK) existantes seront supprimées da...)
Jump to navigation Jump to search
Project Q3107395 in Slovakia
Language Label Description Also known as
English
Modernisation and greening of heat production in Nitra – Klokočina and Parts by high efficiency cogeneration
Project Q3107395 in Slovakia

    Statements

    0 references
    1,193,023.19 Euro
    0 references
    2,651,162.64 Euro
    0 references
    45.0 percent
    0 references
    4 January 2021
    0 references
    9 January 2022
    0 references
    Nitrianska teplárenská spoločnosť, a.s. (v skratke NTS, a.s.)
    0 references
    0 references

    47°52'23.52"N, 18°10'58.76"E
    0 references
    Predmetom projektu s názvom "Modernizácia a ekologizácia výroby tepla v meste Nitra - Klokočina a Diely vysoko účinnou kombinovanou výrobou" je inštalácia nových zariadení pre kombinovanú výrobu elektriny a tepla (KVET) v objektoch súčasných tepelných zdrojov (TZ) - okrskových kotolniach VS1, VS4, VS8 a K1 na sídliskách Klokočina a Diely v Nitre. V uvedených TZ bude zrušená prevádzka jestvujúcich zastaralých plynových kotlov (PK), namiesto nich budú inštalované kogeneračné jednotky (KGJ) pre vysoko účinnú KVET s výkonom do 1,0 MW. KGJ budú cieľovo vyrábať časť tepla dodávaného do odberných miest. V súčasnosti sú v riešených kotolniach pre výrobu tepla inštalované plynové kotly s pretlakovými horákmi. Aj po demontáži uvedených zariadení a inštalovaní navrhovanej technológie pre KVET účel využitia priestorov zostane nezmenený – technický priestor pre energetické účely v samostatne stojacom stavebnom objekte. Realizáciou projektu sa dosiahnu nasledovné hodnoty MU projektu:1. Zvýšenie inštalovaného výkonu zariadení na výrobu elektriny a tepla vysoko účinnou kombinovanou výrobou založenou na dopyte po využiteľnom teple: 3,797 MW;2. Odhadované ročné zníženie emisií skleníkových plynov: 7 075,684 t ekviv. CO2;3. Množstvo tepla vyrobeného vysoko účinnou kombinovanou výrobou založenou na dopyte po využiteľnom teple: 22 825,54 MWh/rok;4. Úspora PEZ v zariadeniach pre vysoko účinnú kombinovanú výrobu elektriny a tepla: 25 543,98 MWh/rok. (Slovak)
    0 references
    The subject of the project entitled “Modernisation and greening of heat production in Nitra – Klokočina and Parts by high efficiency cogeneration” is the installation of new combined heat and power (CHP) plants in existing heaters (CHP) – district boiler rooms VS1, VS4, VS8 and K1 at the Klokočina and Diely estates in Nitra. Existing outdated gas boilers (PKs) will be discontinued in the above mentioned TZ, instead of which cogeneration units (CHP) for high-efficiency CHP up to 1.0 MW will be installed. KGJs will target the production of part of the heat delivered to the point of delivery. Currently, gas boilers with overpressure burners are installed in the boiler rooms for heat production. Even after the dismantling of the above equipment and the installation of the proposed technology for CHP, the purpose of the use of the premises will remain unchanged – the technical space for energy purposes in a detached building. The project implementation will achieve the following MU values of the project:1. Increase of installed capacity of electricity and heat generating installations by high-efficiency cogeneration based on useful heat demand: 3.797 MW;2. Estimated annual greenhouse gas emission reductions: 7075,684 t equiv. CO2;3. Quantity of heat produced by high-efficiency cogeneration based on useful heat demand: 22825,54 MWh/year;4. Saving of EEZ in high-efficiency cogeneration plants: 25543,98 MWh/year. (English)
    28 September 2021
    0 references
    L’objet du projet intitulé «Modernisation et verdissement de la production de chaleur à Nitra — Klokočina et Parts par cogénération à haut rendement» est l’installation de nouvelles installations de production combinée de chaleur et d’électricité (CHP) dans les chaudières existantes (CHP) — chaufferies de district VS1, VS4, VS8 et K1 dans les domaines Klokočina et Diely à Nitra. Les chaudières à gaz obsolètes (PK) existantes seront supprimées dans la zone TZ susmentionnée, au lieu de laquelle des unités de cogénération (CHP) pour une cogénération à haut rendement pouvant atteindre 1,0 MW seront installées. KGJs ciblera la production d’une partie de la chaleur livrée au point de livraison. Actuellement, des chaudières à gaz avec brûleurs à surpression sont installées dans les chaufferies pour la production de chaleur. Même après le démantèlement des équipements ci-dessus et l’installation de la technologie proposée pour la cogénération, l’objectif de l’utilisation des locaux restera inchangé — l’espace technique à des fins énergétiques dans un bâtiment détaché. La mise en œuvre du projet permettra d’atteindre les valeurs MU suivantes du projet:1. Augmentation de la capacité installée des installations de production d’électricité et de chaleur par cogénération à haut rendement fondée sur la demande de chaleur utile: 3,797 MW;2. Réductions annuelles estimées des émissions de gaz à effet de serre: 7 075,684 t equiv. CO2;3. Quantité de chaleur produite par cogénération à haut rendement sur la base de la demande de chaleur utile: 22 825,54 MWh/an;4. Économie de ZEE dans les centrales de cogénération à haut rendement: 25 543,98 MWh/an. (French)
    27 November 2021
    0 references

    Identifiers

    310041AMR6
    0 references