Construction of Targu Jiu bypass (Phase II) (Q3099777)

From EU Knowledge Graph
Revision as of 15:00, 27 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif spécifique OS 2.1 complète les investissements visant à accroître la mobilité des infrastructures routières liées au réseau RTE-T. La mobilité obtenue grâce aux investissements financés par les FC dans le réseau routier sera encore renforcée par des projets qui garantissent à la fois un niveau élevé de qualité routière, y compris au niveau des autoroutes, et en garantissant une connectivité optimale entre les différentes régions et le...)
Jump to navigation Jump to search
Project Q3099777 in Romania
Language Label Description Also known as
English
Construction of Targu Jiu bypass (Phase II)
Project Q3099777 in Romania

    Statements

    0 references
    0 references
    223,723,917.4 Romanian Leu
    0 references
    44,744,783.480000004 Euro
    13 September 2021
    0 references
    263,204,608.7 Romanian Leu
    0 references
    52,640,921.74 Euro
    13 September 2021
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2023
    0 references
    COMPANIA NAŢIONALĂ DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A./Departament Documentatii Obtinere Fonduri Externe
    0 references

    45°2'32.24"N, 23°16'22.12"E
    0 references
    Obiectivul specific OS 2.1 completează investițiile menite să asigure creșterea mobilității la nivelul infrastructurii rutiere aferente rețelei TEN-T. Mobilitatea obținută prin investițiile finanțate din FC la nivelul rețelei rutiere va fi sporită suplimentar prin proiecte care asigură atât un standard ridicat al drumurilor, inclusiv la nivel de autostradă, cât și prin asigurarea unei conectivități optime între diversele regiuni și centre urbane ale României. • Economii de timp în parcugerea distanțelor rutiere pe rețeaua TEN-T Obţinerea rezultatului scontat va contribui la promovarea competitivităţii economice şi la îmbunătăţirea condiţiilor în transportul rutier de mărfuri şi călători şi la reducerea emisiilor poluante prin eliminarea/ reducerea blocajelor de trafic prin reducerea duratelor de transport. Constructia variantei de ocolire Targu-Jiu duce la atingerea indicatorului de rezultat 2S11 – reducerea timpului mediu de calatorie pe reteaua rutiera TEN-T, prin reducerea timpului de parcurs cu aproximativ 8 minute/autovehicul pe distanta N-S, de la 18,27 minute in cazul fara proiect (valoarea de la inceputul perioadei de implementare) la 10,16 minute in cazul cu proiect (valoarea la sfarsitul perioadei de implementare) si cu aproximativ 2 minute / autovehicul pe distanta E-V, de la 9,61 minute in cazul fara proiect (valoarea de la inceputul perioadei de implementare) la 7,34 minute in cazul cu proiect (valoarea la sfarsitul perioadei de implementare). (Romanian)
    0 references
    The specific objective OS 2.1 complements the investments aimed at increasing mobility in the road infrastructure related to the TEN-T network. The mobility achieved through CF-funded investments in the road network will be further increased through projects that ensure both a high road standard, including at motorway level, and by ensuring optimal connectivity between the various regions and urban centres of Romania. • Time savings in the Parking of Road Distances on the TEN-T Network Achieving the expected result will help promote economic competitiveness and improve conditions in road freight and passenger transport and reduce pollutant emissions by removing/reduction of traffic bottlenecks by reducing transport times. The construction of the Targu-Jiu bypass leads to the achievement of the result indicator 2S11 – reducing the average travel time on the TEN-T road network, by reducing the journey time by about 8 minutes/motor vehicle distance N-S, from 18.27 minutes in case without the project (value from the beginning of the implementation period) to 10.16 minutes in the case of the project (value at the end of the implementation period) and by about 2 minutes/vehicle distance E-V, from 9.61 minutes in case without the project (value from the beginning of the implementation period) to 7.34 minutes in case of project (value at the end of the implementation period). (English)
    16 September 2021
    0 references
    L’objectif spécifique OS 2.1 complète les investissements visant à accroître la mobilité des infrastructures routières liées au réseau RTE-T. La mobilité obtenue grâce aux investissements financés par les FC dans le réseau routier sera encore renforcée par des projets qui garantissent à la fois un niveau élevé de qualité routière, y compris au niveau des autoroutes, et en garantissant une connectivité optimale entre les différentes régions et les centres urbains de Roumanie. • Gain de temps dans le stationnement des distances routières sur le réseau RTE-T L’obtention du résultat escompté contribuera à promouvoir la compétitivité économique et à améliorer les conditions dans le transport routier de marchandises et de voyageurs et à réduire les émissions polluantes en supprimant/réduisant les goulets d’étranglement du trafic en réduisant les temps de transport. La construction du contournement de Targu-Jiu conduit à la réalisation de l’indicateur de résultat 2S11 — réduction du temps de trajet moyen sur le réseau routier RTE-T, en réduisant le temps de trajet d’environ 8 minutes/distance du véhicule N-S, de 18,27 minutes en cas d’absence du projet (valeur à partir du début de la période de mise en œuvre) à 10,16 minutes dans le cas du projet (valeur à la fin de la période de mise en œuvre) et d’environ 2 minutes/distance véhicule E-V, de 9,61 minutes en l’absence du projet (valeur à partir du début de la période de mise en œuvre) à 7,34 minutes en cas de projet (valeur à la fin de la période de mise en œuvre). (French)
    27 November 2021
    0 references
    Municipiul Târgu Jiu, Romania
    0 references

    Identifiers

    111429
    0 references