Reduction of energy intensity in confectionery production at DANUBIA a.s. (Q3103805)

From EU Knowledge Graph
Revision as of 14:59, 27 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif du présent projet est de mettre en œuvre des mesures visant à réduire l’intensité énergétique de la construction de la société de production de confiseries DANUBIA a.s. Le sujet du projet est la mise en œuvre de 2 aktivít:Hlavná activité 1 — Assurer les audits énergétiques dans les PMEPrincipale activité 2 — Mise en œuvre des mesures issues des audits énergétiques. Le lieu de réalisation du projet est le site de production de la requé...)
Jump to navigation Jump to search
Project Q3103805 in Slovakia
Language Label Description Also known as
English
Reduction of energy intensity in confectionery production at DANUBIA a.s.
Project Q3103805 in Slovakia

    Statements

    0 references
    166,436.69 Euro
    0 references
    195,807.87 Euro
    0 references
    85.0 percent
    0 references
    1 November 2017
    0 references
    1 September 2020
    0 references
    DANUBIA a.s.
    0 references
    0 references

    47°59'29.87"N, 17°37'14.27"E
    0 references
    Cieľom predkladaného projektu je realizácia opatrení za účelom zníženia energetickej náročnosti budovy cukrárenskej výroby spoločnosti DANUBIA a.s.  Predmetom projektu je realizácia 2 aktivít:Hlavná   aktivita  1 – Zabezpečenie energetických auditov v MSPHlavná   aktivita  2 – Implementácia opatrení z energetických auditov. Miestom realizácie projektu je výrobná prevádzka žiadateľa v Meste Dunajská Streda, na parcelách 3134/21, 3134/29, 3134/39 so súpisným číslom budovy 4540. Realizácia projektu prispieva k napĺňaniu nasledovných merateľných ukazovateľov:Odhadované ročné zníženie emisií skleníkových plynov – 205,1t CO2Počet energetických auditov – 1Počet opatrení energetickej efektívnosti realizovaných v podnikoch – 6Počet podnikov, ktorým sa poskytuje podpora – 1Počet zavedených systémov merania a riadenia – 1Predpokladaná úspora PEZ v podniku podľa energetického auditu – 936,1MWh/rokSpotreba energie v podniku po realizácii opatrení energetickej efektívnosti – 342 MWh/rokSpotreba energie v podniku pred realizáciou opatrení energetickej efektívnosti – 1278 MWh/rokÚspora PEZ v podniku - 936,1MWh/rok Navrhnuté opatrenia boli zvolené na základe výstupov energetického auditu, ktorý dôsledne preskúmal súčasný stav budovy a jej energetické vlastnosti. Na základe meraní a výpočtov odporučil súbor opatrení, ktoré boli zapracované do projektovej dokumentácie. Predmetom projektu je zlepšenie tepelnotechnických vlastností objektu zateplením obvodového plášťa, strešného plášťa objektu na výrobu cukrárenských výrobkov fy. DANUBIA a.s. s výmenou výplní otvorov v obvodovej konštrukcii, kde neboli vymenené, rekonštrukcia vykurovacieho systému podľa požiadaviek projektového energetického hodnotenia – výmena kotolne vrátane výroby TÚV a výmena osvetľovacích telies. (Slovak)
    0 references
    The objective of the present project is to implement measures to reduce the energy intensity of the building of confectionery production company DANUBIA a.s. The subject of the project is the implementation of 2 aktivít:Hlavná activity 1 – Ensuring energy audits in SMEsMain activity 2 – Implementation of measures from energy audits. The place of implementation of the project is the applicant’s production site in Dunajská Streda, on parcels 3134/21, 3134/29, 3134/39 with inventory number 4540. Implementation of the project contributes to the fulfilment of the following measurable ukazovateľov:Odhadované annual reduction of greenhouse gas emissions – 205.1 tCO2Number of energy audits – 1Number of energy efficiency measures implemented in enterprises – 6Number of enterprises receiving support – 1Number of measurement and management systems in place – 1Presumed saving of PEZ in the enterprise according to energy audit – 936,1 MWh/yearEnergy consumption in the enterprise after implementation of energy efficiency measures – 342 MWh/yearEnergy consumption in the enterprise before the implementation of energy efficiency measures – 1278 MWh/yearSaving of PEZ in the enterprise – 936.1 MWh/yearThe energy performance of the building has been consistently reviewed and the energy output of the company has been consistently assessed. On the basis of measurements and calculations, he recommended a set of measures that were incorporated into the project documentation. The subject of the project is to improve the thermal properties of the building by thermal insulation, roofing of the building for the production of fy confectionery products. Danubia a.s. with the replacement of fillings of holes in the circumferential construction where they were not replaced, reconstruction of the heating system according to the requirements of the project energy assessment – replacement of boiler room, including production of DHW and replacement of lighting bodies. (English)
    28 September 2021
    0 references
    L’objectif du présent projet est de mettre en œuvre des mesures visant à réduire l’intensité énergétique de la construction de la société de production de confiseries DANUBIA a.s. Le sujet du projet est la mise en œuvre de 2 aktivít:Hlavná activité 1 — Assurer les audits énergétiques dans les PMEPrincipale activité 2 — Mise en œuvre des mesures issues des audits énergétiques. Le lieu de réalisation du projet est le site de production de la requérante à Dunajská Streda, sur les parcelles 3134/21, 3134/29, 3134/39, portant le numéro d’inventaire 4540. La mise en œuvre du projet contribue à la réalisation des mesures mesurables ukazovateľov:Odhadované de réduction annuelle des émissions de gaz à effet de serre — 205,1 tCO2Nombre d’audits énergétiques — 1Nombre de mesures d’efficacité énergétique mises en œuvre dans les entreprises — 6Nombre d’entreprises bénéficiant d’un soutien — 1Nombre de systèmes de mesure et de gestion en place — 1Économie présumée de PEZ dans l’entreprise selon l’audit énergétique — 936,1 MWh/anConsommation d’énergie dans l’entreprise après la mise en œuvre des mesures d’efficacité énergétique — 342 MWh/anConsommation d’énergie dans l’entreprise avant la mise en œuvre des mesures d’efficacité énergétique — 1 278 MWh/an de PEZ dans l’entreprise — 936,1 MWh/anLa performance énergétique du bâtiment a été constamment revue et la production énergétique de l’entreprise a été constamment évaluée. Sur la base de mesures et de calculs, il a recommandé un ensemble de mesures qui ont été incorporées dans la documentation du projet. L’objet du projet est d’améliorer les propriétés thermiques du bâtiment par l’isolation thermique, la toiture du bâtiment pour la production de produits de confiserie. Danubia a.s. avec le remplacement des remplissages de trous dans la construction circonférentielle où ils n’ont pas été remplacés, reconstruction du système de chauffage selon les exigences de l’évaluation énergétique du projet — remplacement de la chaufferie, y compris la production de DHW et le remplacement des corps d’éclairage. (French)
    27 November 2021
    0 references

    Identifiers

    310041P319
    0 references