Construction of the bypass of Brasov Municipality, Tronson I (DN1-DN11), II (DN11-DN13) and III (DN 13-DN 1) Phase II (Q3098995)

From EU Knowledge Graph
Revision as of 14:41, 27 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif principal du projet «Construction of Brasov bypass» est de construire 13,63 km de nouvelle route sur un profil de 2x2, ainsi que d’élargir 4,924 km du profil 2x2 au profil 4x4. L’achèvement des cornichons réduira le temps de traverser Brasov d’environ 12 minutes. Ce projet est un projet échelonné, la phase I a été financée par POS-T au titre de l’axe prioritaire 2 «Modernisation et développement des infrastructures de transport nation...)
Jump to navigation Jump to search
Project Q3098995 in Romania
Language Label Description Also known as
English
Construction of the bypass of Brasov Municipality, Tronson I (DN1-DN11), II (DN11-DN13) and III (DN 13-DN 1) Phase II
Project Q3098995 in Romania

    Statements

    0 references
    0 references
    64,611,918.79 Romanian Leu
    0 references
    12,922,383.758000001 Euro
    13 September 2021
    0 references
    76,014,022.11 Romanian Leu
    0 references
    15,202,804.422 Euro
    13 September 2021
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    30 April 2019
    0 references
    COMPANIA NAŢIONALĂ DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A./Departament Documentatii Obtinere Fonduri Externe
    0 references

    45°39'8.32"N, 25°36'36.97"E
    0 references
    Obiectivul principal al proiectului „Constructia variantei de ocolire a municipiului Brasov” consta in constructia a 13,63 km de drum nou la profil 2x2, precum si largirea a 4.924 km de la profil 2x2 la profil 4x4. Finalizarea lurarilor va duce la reducerea timpului de parcurs pentru traversarea orasului Brasov cu cca 12 minute. Prezentul proiect este un proiect fazat, Faza I a fost finanțata din POS-T în cadrul Axei Prioritare 2 ”Modernizarea si dezvoltarea infrastructurii nationale de transport in afara axelor prioritare TEN-T in scopul dezvoltării unui sistem național durabil de transport”, domeniul major de intervenție 2.1 ”Modernizarea si dezvoltarea infrastructurii rutiere naționale”, iar Faza a II-a face obiectul prezentei aplicatii pentru finantare POIM, Axa Prioritară 2 - "Dezvoltarea unui sistem de transport multimodal, de calitate, durabil şi eficient" , Obiectivul specific 2.1 "Creşterea mobilităţii pe reţeaua rutieră TEN-T globală". (Romanian)
    0 references
    The main objective of the project “Construction of Brasov bypass” is to build 13.63 km of new road at 2x2 profile, as well as widening 4.924 km from profile 2x2 to 4x4 profile. The completion of the pickles will reduce the time to cross Brasov by about 12 minutes. This project is a phased project, Phase I was financed from POS-T under Priority Axis 2 “Modernisation and development of national transport infrastructure outside the TEN-T priority axes in order to develop a sustainable national transport system”, major area of intervention 2.1 “Modernisation and development of national road infrastructure”, and Phase II is the subject of this application for financing LIOP, Priority Axis 2 – “Development of a multimodal, quality, sustainable and efficient transport system”, Specific Objective 2.1 “Increasing mobility on the comprehensive TEN-T road network”. (English)
    16 September 2021
    0 references
    L’objectif principal du projet «Construction of Brasov bypass» est de construire 13,63 km de nouvelle route sur un profil de 2x2, ainsi que d’élargir 4,924 km du profil 2x2 au profil 4x4. L’achèvement des cornichons réduira le temps de traverser Brasov d’environ 12 minutes. Ce projet est un projet échelonné, la phase I a été financée par POS-T au titre de l’axe prioritaire 2 «Modernisation et développement des infrastructures de transport nationales en dehors des axes prioritaires du RTE-T afin de développer un système de transport national durable», domaine d’intervention majeur 2.1 «Modernisation et développement des infrastructures routières nationales», et la phase II fait l’objet de la présente demande de financement du LIOP, axe prioritaire 2 — «Développement d’un système de transport multimodal, de qualité, durable et efficace», objectif spécifique 2.1 «Accroître la mobilité sur le réseau routier RTE-T global». (French)
    27 November 2021
    0 references
    Municipiul Braşov, Romania
    0 references