Reducing the energy intensity of the M Partizánska building 20 and 22 Humenné (Q3102963)
Jump to navigation
Jump to search
Project Q3102963 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Reducing the energy intensity of the M Partizánska building 20 and 22 Humenné |
Project Q3102963 in Slovakia |
Statements
767,684.09 Euro
0 references
903,157.75 Euro
0 references
85.0 percent
0 references
1 April 2017
0 references
1 February 2021
0 references
Mesto Humenné
0 references
Cieľom projektu „ ZNÍŽENIE ENERGETICKEJ NÁROČNOSTI BUDOVY MŠ PARTIZÁNSKA 20 A 22, HUMENNÉ“ je rekonštrukcia a modernizácia budovy, zlepšenie ochrany stavebných konštrukcií pred vonkajšími vplyvmi (dážď, vietor, sneh). Realizácia projektu zabezpečí zníženie spotreby energie a nenavyšovanie finančného zaťažovania rozpočtu mesta. Dôjde tak ku výraznému zlepšeniu pracovného prostredia pre zamestnancov a žiakov. Realizácia projektu bude pozostávať zo štyroch opatrení, ktoré boli navrhnuté ako optimálna kombinácia opatrení stavebného charakteru, opatrení v rámci modernizácie systému rozvodov a prípravy teplej vody a v neposlednom rade aj modernizácie osvetlenia a inštalácie vzduchotechniky so spätným získavaním tepla. Pri návrhu opatrení na spracovanie projektovej dokumentácie sa vychádzalo z výsledkov východiskového energetického auditu, ktorý mal pre rozsah spracovania projektovej dokumentácie odporúčací charakter. Zároveň sa už v tejto fáze prípravy projektovej dokumentácie kládol vysoký dôraz aj na ukazovateľ ,,Value for Money“. Ten je výsledným ukazovateľom v projekte, môžeme povedať, že meradlom kvality celého projektu. Ukazovateľ ,,Value for money“ sa určí pomerom hodnoty merateľného ukazovateľa v projekte, t.j. zníženie potreby energie v predmetnej budove a vynaložených finančných zdrojov. Vyjadruje prínos projektu v pomere ku vynaloženým finančným zdrojom. (Slovak)
0 references
The aim of the project “Learning the ENERGY NATIONAL BUDING MŠ Partizánska 20 A 22, HUMENNÉ” is the reconstruction and modernisation of the building, the improvement of the protection of building structures from external influences (rain, wind, snow). Implementation of the project will ensure the reduction of energy consumption and not increase the financial burden of the city budget. This will significantly improve the working environment for employees and pupils. The implementation of the project will consist of four measures, which were designed as an optimal combination of measures of a construction nature, measures within the modernisation of the distribution and hot water system and, last but not least, modernisation of lighting and installation of air conditioning with heat recovery. The design of the measures for the processing of the project documentation was based on the results of the baseline energy audit, which was a recommendation for the scope of the project documentation processing. At the same time, the “Value for Money” indicator was also strongly emphasised at this stage of the preparation of the project documentation. This is the result indicator in the project, we can say that by measuring the quality of the whole project. The variable “Value for money” is determined by the ratio of the value of the measurable indicator in the project, i.e. the reduction of energy needs in the building in question and the financial resources spent. Expresses the contribution of the project in proportion to the financial resources spent. (English)
28 September 2021
0 references
Identifiers
310041K294
0 references