Expansion of capacity M railway 74, Pova ská Bystrica (Q3100867)
Jump to navigation
Jump to search
Project Q3100867 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Expansion of capacity M railway 74, Pova ská Bystrica |
Project Q3100867 in Slovakia |
Statements
389,216.72 Euro
0 references
457,902.02 Euro
0 references
85.0 percent
0 references
1 September 2018
0 references
1 August 2020
0 references
Mesto Považská Bystrica
0 references
Q3120055 (Deleted Item)
0 references
Materská škola Železničná v Meste Považská Bystrica má momentálnu kapacitu 183 detí. Objekt bol postavený v roku 1977 podľa projektovej dokumentácie a stavebno-technických požiadaviek a noriem platných v tom období, v súčasnosti už nevyhovuje technickým požiadavkám a neposkytuje priestor pre rozšírenie kapacity školy bez stavebných úprav a nadstavby. Má 7 riadnych tried s príslušenstvom, hospodársky pavilón s kuchyňou, práčovňou a priestormi pre administratívu. Pre veľký záujem o umiestnenie detí v MŠ sú triedy napĺňané na maximálne možnú hranicu. Cieľ sa dosiahne prestavbou a nadstavbou jestvujúceho pavilónu „D“, čím sa priestorovo dosiahne zvyšovanie kapacít miest o 40 detí, ako aj zníženie energetickej náročnosti budovy. Realizáciou projektu sa tiež rieši úprava vonkajšieho areálu, detského ihriska a obstaranie potrebného materiálno-technického vybavenia tried. (Slovak)
0 references
The kindergarten Železničná in Považská Bystrica has a capacity of 183 children. The building was built in 1977 according to the design documentation and building-technical requirements and standards in force at that time, at present it no longer meets technical requirements and does not provide room for extension of the capacity of the school without building modifications and superstructures. It has 7 regular classes with accessories, an economic pavilion with kitchen, laundry and administrative space. For a great interest in the placement of children in secondary schools, classes are filled to the maximum possible limit. The goal will be achieved by rebuilding and superstructure of the existing pavilion “D”, which will achieve spatially increasing the capacity of cities by 40 children, as well as reducing the energy intensity of the building. The implementation of the project also addresses the modification of the outdoor area, children’s playground and the acquisition of the necessary material and technical equipment classes. (English)
28 September 2021
0 references
Identifiers
302021H957
0 references