Wilson’s embankment cycle route – (University Bridge) – Mostná ul. — Jesenský ul. (Park Siho) (Q3100822)

From EU Knowledge Graph
Revision as of 12:57, 27 November 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q3100822 in Slovakia
Language Label Description Also known as
English
Wilson’s embankment cycle route – (University Bridge) – Mostná ul. — Jesenský ul. (Park Siho)
Project Q3100822 in Slovakia

    Statements

    0 references
    363,705.45 Euro
    0 references
    427,888.77 Euro
    0 references
    85.0 percent
    0 references
    1 October 2018
    0 references
    1 June 2019
    0 references
    Mesto Nitra
    0 references
    0 references

    47°52'23.52"N, 18°10'58.76"E
    0 references
    Projekt „Cyklotrasa Wilsonovo nábrežie - (Univerzitný most) - Mostná ul. - Jesenského ul. (Park Sihoť)“ je v súlade s koncepčným materiálom „Koncepcia cyklistickej dopravy v meste Nitra“. V zmysle toho materiálu má byť v prvej etape (do roku 2020) dobudovaných cca. 27,30 km cyklistických komunikácií. „Cyklotrasa Wilsonovo nábrežie - (Univerzitný most) - Mostná ul. - Jesenského ul. (Park Sihoť)“ je jedným z plánovaných aktivít a úsekov o celkovej dĺžke 1 995,57 metrov nových cyklistických komunikácií. Cyklotrasa sa bude realizovať na existujúcom chodníku, ul. Wilsonovo nábrežie v Nitre. Trasa začína pri Univerzitnom moste, kde sa napojí na už zrealizovanú trasu cyklochodníka a chodníka, v mieste konca mosta. Pokračuje ďalej po existujúcom chodníku, pozdĺž rieky Nitra až k ul. Boženy Slančíkovej. V tomto mieste trasa spoločného chodníka a cyklochodníka križuje existujúci chodník a križovatku. V mieste je navrhnuté nové zvislé aj vodorovné dopravné značenie, na prevedenie chodcov aj cyklistov cez križovatku. Za križovatkou trasa pokračuje po existujúcom chodníku smerom na ul. Mostná. Na ul. Mostná je trasa opäť križovaná existujúcim chodníkom a križovatkou. Trasa ďalej pokračuje, v území pri rieke, na existujúcom povrchu hrádze. Koniec trasy predstavuje napojenie v mieste existujúceho spoločného chodníka a cyklochodníka v parku Sihoť, kde sa napojí na existujúcu sieť cyklistických komunikácií. (Slovak)
    0 references
    Project "Cyklotrasa Wilson’s embankment – (University Bridge) – Mostná ul. — Jesenský ul. (Park Sihoť)" is in line with the conceptual material "The conception of cycling traffic in Nitra”. Accordingly, in the first stage (until 2020) the material is to be completed approx. 27,30 km of cycling. “The Wilson Waterfront Cycling Route – (University Bridge) – Mostná ul. — Jesenský ul. (Park Sihoť)" is one of the planned activities and sections with a total length of 1 995.57 meters of new cycling roads. The cycle path will be implemented on the existing trail, ul. Wilson’s quay in Nitra. The route starts at the University Bridge, where it connects to the already implemented route of the cycle path and the path, in the place of the end of the bridge. It continues along the existing trail, along the river Nitra to the ul. Oh, Godny Slančíková. In this place, the route of the common path and the cycle path crosses the existing path and intersection. New vertical and horizontal traffic signs are designed at the site, to carry pedestrians and cyclists through the junction. At the intersection, the route continues along the existing path towards the street. The bridge. On the street. The bridge is the route again crossed by the existing path and intersection. The route continues, in the area by the river, on the existing surface of the dam. The end of the route is a connection to the existing common path and cycle path in Sihoť Park, where it connects to the existing network of cycling roads. (English)
    28 September 2021
    0 references

    Identifiers

    302011G014
    0 references