Reconstruction of the maternal cola on ul. Vajansky in Roňava (Q3100914)

From EU Knowledge Graph
Revision as of 12:56, 27 November 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q3100914 in Slovakia
Language Label Description Also known as
English
Reconstruction of the maternal cola on ul. Vajansky in Roňava
Project Q3100914 in Slovakia

    Statements

    0 references
    400,388.29 Euro
    0 references
    471,045.05 Euro
    0 references
    85.0 percent
    0 references
    1 January 2018
    0 references
    1 October 2021
    0 references
    Mesto Rožňava
    0 references
    0 references

    48°39'18.29"N, 20°32'22.60"E
    0 references
    Areál Materskej školy na ulici Vajanského, vybudovanej v rokoch 1971-1974, pozostáva z 3 objektov – dva pavilóny MŠ (pavilón A, pavilón B) + hospodársky pavilón. POVODNÝ STAV: Pavilón A, dvojpodlažný, boli v ňom umiestnené 4 triedy MŠ (dve na prízemí a dve na prvom podlaží). Pavilón B, dvojpodlažný, slúžil ako spoločenská miestnosť pre všetky triedy MŠ a časom aj ako detské jasle či CVČ. V roku 2012 bolo mesto Rožňava, z dôvodu havarijného stavu pavilónu A (statické poruchy panelových stavieb), nútené vykonať stavebné úpravy na pavilóne B a vytvoriť v ňom triedy. Kapacitne to však nepostačovalo na umiestnenie všetkých detí z pavilónu A. Časť detí bola teda umiestnená do iných predškolských zariadení mesta Rožňava. SÚČASNÝ STAV: MŠ navštevuje 60 detí, ktoré sú umiestnené v 3 triedach pavilónu B. Pavilón A je nevyužívaný.CIEĽ PROJEKTU: Rekonštrukciou  MŠ Vajanského vytvoriť príťažlivé prostredie, ktoré bude schopné udržateľne poskytovať kvalitné služby v oblasti predškolského vzdelávania. Zrekonštruovať pavilón A, vytvoriť v ňom 2 nové triedy MŠ ako aj spoločenskú miestnosť pre všetky deti zariadenia. Po rekonštrukcii bude MŠ pozostávať z 5 fungujúcich tried (3 pôvodné a 2 novovytvorené).V roku 2016 mesto Rožňava z vlastných zdrojov odstránilo havarijný stavu dvojpodlažného pavilónu. Avšak vzhľadom na skutočnosť, že od uvedenia budovy do prevádzky v 70. rokoch, nebola na budove uskutočnená žiadna rekonštrukcia, je v súčasnosti okrem dispozičných úprav potrebné budovy MŠ  prispôsobiť súčasným energetickým technickým normám, čím sa zabezpečí aj energetická efektívnosť zariadenia.Projekt zahŕňa nasledovné aktivity:Pavilón A – rekonštrukcia interiéru, kúrenia a elektrických rozvodov, zmena dispozície, výmena okien a vchodových dverí, zateplenie obvodových stien, zastrešenie objektu.Areál MŠ – rekonštrukcia spevnených a nespevnených plôch areálu, osadenie detského mobiliáru. (Slovak)
    0 references
    The area of the Maternity School on Vajanský Street, built in 1971-1974, consists of 3 buildings – two pavilions of the MŠ (Pavilion A, Pavilion B) + economic pavilion. FLOODING: Pavilion A, two-storey, was located in it 4 classes of secondary school (two on the ground floor and two on the first floor). Pavilion B, two-storey, served as a common room for all classes of secondary school and over time as a nursery or CVČ. In 2012, the town of Rožňava, due to the emergency condition of pavilion A (static breakdowns of panel structures), was forced to make building modifications to Pavilion B and to create classes in it. However, it was not enough to accommodate all the children from Pavilion A. A part of the children was placed in other pre-school facilities of Rožňava. STATE OF PLAY: The university visits 60 children who are located in 3 classes of pavilion B. Pavilion A is not used. By reconstructing the school of Vajanský, create an attractive environment capable of sustainably providing quality services in the field of pre-school education. Reconstruct pavilion A, create 2 new classes of secondary school in it as well as a common room for all children of the facility. After reconstruction, the MŠ will consist of 5 functioning classes (3 original and 2 newly created).In 2016, the town of Rožňava removed the emergency state of the two-storey pavilion from its own resources. However, due to the fact that since the entry into operation of the building in the 1970s, there has been no reconstruction on the building, in addition to the layout modifications, it is necessary to adapt the buildings to the current energy technical standards, which will also ensure the energy efficiency of the equipment.The project includes the following aktivity:Pavilón A – reconstruction of interior, heating and electrical wiring, change of layout, replacement of windows and entrance doors, insulation of perimeter walls, roofing of the building.Areál MŠ – reconstruction of paved and unpaved areas of the area, installation of children’s mobile phone. (English)
    28 September 2021
    0 references

    Identifiers

    302021H887
    0 references