Rehabilitation of 161 housing units, Le Trident building (Q3679447)

From EU Knowledge Graph
Revision as of 14:47, 26 November 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de: translated_label)
Jump to navigation Jump to search
Project Q3679447 in France
Language Label Description Also known as
English
Rehabilitation of 161 housing units, Le Trident building
Project Q3679447 in France

    Statements

    0 references
    1,000,000.0 Euro
    0 references
    3,183,199.1 Euro
    0 references
    31.41 percent
    0 references
    1 December 2016
    0 references
    31 December 2020
    0 references
    ERILIA
    0 references
    0 references
    La résidence comporte 161 logements construits en 1962 Elle est composée de 18 bâtiments accolés de 5 niveaux formant un S avec 2 cours centrales : L'une servant pour l'accès et le stationnement des véhicules L'autre d'espace vert Cet ensemble immobilier de près de 50 ans d'âge nécessitait une réhabilitation importante. Cette opération de réhabilitation permettra de redonner de l'attrait à la résidence et améliorera de manière significative la qualité de vie des locataires. L'opération se déroulera en milieu occupé, avec un plan d'intervention ciblé permettant au locataire de revenir dans son logement tous les soirs. Afin d'optimiser la coordination entre les différents corps d'état il a été choisi de faire appel à une entreprise générale. Le cahier des charges prévoie un volet d'insertion social significatif, et des obligations de moyens concernant la relation aux locataires, notamment la mise à disposition d'un référent chantier. C'est à dire une personne formée à la fonction, chargée à plein temps d'informer et de recueillir les observations ou plaintes des résident, et d'assurer la liaison avec les responsables du chantier, la maîtrise d'oeuvre, la maîtrise d'ouvrage ainsi que le gestionnaire du site. Le niveau énergétique des bâtiments est de l'ordre de 193.71 kWhep/m².an (étiquette D) et passerait à 34.31 kWhep/m².an (étiquette B) soit un gain énergétique de 159.40 kWhep/m².an (French)
    0 references
    The residence consists of 161 dwellings built in 1962 It is composed of 18 buildings adjoining 5 levels forming an S with 2 central courtyards: One used for access and parking of vehicles The other of green space This housing complex of nearly 50 years of age required a major rehabilitation. This rehabilitation operation will restore attractiveness to the residence and significantly improve the quality of life of tenants. The operation will take place in the occupied environment, with a targeted response plan allowing the tenant to return to his accommodation every evening. In order to optimise the coordination between the different state bodies it was chosen to call on a general enterprise. The tender specifications provide for a significant social integration component and obligations of resources concerning the relationship to tenants, in particular the provision of a site manager. That is to say, a person trained in the function, who is responsible on a full-time basis to inform and collect observations or complaints from residents, and to liaise with the site managers, the project manager, the contracting authority and the site manager. The energy level of buildings is in the order of 193.71 kWhep/m².year (label D) and would increase to 34.31 kWhep/m².year (label B), an energy gain of 159.40 kWhep/m².year (English)
    18 November 2021
    0 references

    Identifiers

    LR0015755
    0 references