ACI 2015 3ABE (Q3671992)

From EU Knowledge Graph
Revision as of 13:59, 26 November 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de: translated_label)
Jump to navigation Jump to search
Project Q3671992 in France
Language Label Description Also known as
English
ACI 2015 3ABE
Project Q3671992 in France

    Statements

    0 references
    31,649.1 Euro
    0 references
    52,748.5 Euro
    0 references
    60.00 percent
    0 references
    1 January 2015
    0 references
    31 December 2015
    0 references
    CHANTIER INSERTION
    0 references
    0 references
    0 references
    _Activités_ : Pour la période "espaces verts" notre planning est complet. Nous avons du refuser deux communes qui ont voulu faire appel à notre association. Nous devons cependant augmenter notre activité pour la période hiver 2015/2016. Nous allons développer certains domaines en entretien de bâtiments en proposant davantage de travaux de nettoyage, de peinture et isolation, et encore plus d'affouages. _Accompagnement des salariés:_ Il se fait tout d'abord au sein même du chantier quotidiennement par l'encadrant technique qui suit les salariés dans leur parcours d'insertion, mais aussi par l'accompagnatrice socio professionnelle qui suit les objectifs des salariés en faisant intervenir les partenaires sociaux extérieurs nécessaires ( le chantier se fait accompagner par la Maison de l'Emploi afin de finaliser au mieux les PMSMP, et également par Pôle Emploi, Cap Emploi, Mission Locale, Polyval Japiot...). Nous devons accentuer les formations professionnelles avec les différents organismes, nous souhaitons au moins faire 1 à 2 formations qualifiantes par an, sachant qu'aller au- delà de ce chiffre pénaliserait notre production. _Investissement:_ Afin de mieux répartir nos équipes de travail, nous avions deux véhicules: un Berlingo 5 places attelé d'une remorque, et un Tepee 7 places. Le Berlingo nécessitant un coût d'entretien trop important (11 ans), nous souhaitons le remplacer par un camion benne de 7 places, qui sera plus efficace pour le transport des matériaux mais également pour le côté pratique de la remorque basculante. (French)
    0 references
    _Activities_: For the period “green spaces” our schedule is complete. We had to refuse two municipalities that wanted to appeal to our association. However, we need to increase our activity for the winter period 2015/2016. We will develop certain areas of building maintenance by offering more cleaning, painting and insulation work, and even more reinforcements. _Employee support:_ It is done first of all within the site itself on a daily basis by the technical manager who follows the employees in their integration path, but also by the socio-professional worker who follows the objectives of the employees by involving the necessary external social partners (the site is accompanied by the Maison de l’Emploi in order to finalise the PMSMPs, and also by Pôle Emploi, Cap Emploi, Mission Locale, Polyval Japiot...). We need to step up vocational training with the various bodies, we want to do at least 1 to 2 training courses a year, knowing that going beyond this figure would penalise our production. _Investment:_ in order to better distribute our work teams, we had two vehicles: a 5-seat Berlingo with a trailer, and a Tepee 7 seats. As the Berlingo requires too much maintenance costs (11 years), we want to replace it with a 7-seat dump truck, which will be more efficient for transporting materials but also for the practical side of the tilting trailer. (English)
    18 November 2021
    0 references

    Identifiers

    201502330
    0 references