“Rehabilitation works for bridges, bridges and railway tunnels – Regional Railway Branch Bucharest – Phase II” (Q3099218)

From EU Knowledge Graph
Revision as of 10:24, 26 November 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q3099218 in Romania
Language Label Description Also known as
English
“Rehabilitation works for bridges, bridges and railway tunnels – Regional Railway Branch Bucharest – Phase II”
Project Q3099218 in Romania

    Statements

    0 references
    0 references
    0 references
    26,480,579.62 Romanian Leu
    0 references
    5,296,115.924000001 Euro
    13 September 2021
    0 references
    31,153,623.06 Romanian Leu
    0 references
    6,230,724.612 Euro
    13 September 2021
    0 references
    85.0 percent
    0 references
    18 May 2008
    0 references
    30 October 2020
    0 references
    COMPANIA NATIONALA DE CAI FERATE "CFR" SA/SECTOR INVESTITII
    0 references
    0 references

    44°30'6.16"N, 26°14'41.68"E
    0 references

    45°6'31.50"N, 26°2'15.43"E
    0 references
    Podurile de cale ferata care fac obiectul prezentului proiect sunt amplasate în judetele Ilfov (5 poduri) şi Prahova (2 poduri). Proiectul „Lucrări de reabilitare poduri, podeţe şi tuneluri de cale ferată – Sucursala Regională de Căi Ferate Bucureşti”vizeaza reabilitarea unui nr. de 5 poduri în judetul Ilfov şi 2 poduri în judetul Prahova dupa cum urmează: 1. Pod, km 1+510, CF 301, Linia colectoare Mogoşoaia (jud. Ilfov). 2. Pod, km 20+474, CF 100, Bucureşti – Videle, între staţiile Domneşti şi Grădinari (jud. Ilfov); 3. Pod, km 21+084, CF 100, Bucureşti – Videle, între staţiile Domneşi şi Grădinari (jud. Ilfov); 4. Pod, km 21+434, CF 100, Bucureşti – Videle, între staţiile Domneşti şi Grădinari (jud. Ilfov); 5. Pod, km 21+888, CF 100, Bucureşti – Videle, între staţiile Domneşti şi Grădinari (jud. Ilfov); 6. Pod, km 57+540, CF 304, Ploieşti Sud – Ploieşti Triaj, între staţiile Ploieşti Sud şi Ploieşti Triaj (jud. Prahova); 7. Pod, km 57-560, CF 300, Bucureşti – Ploieşti, între staţiile Brazi şi Ploieşti Sud (jud. Prahova); Proiectul a fost fazat iar în conformitate cu instrucțiunile din adresa CE ARES (2016) 3986196 / 28.07.2016, fazarea proiectului este reprezentată astfel: • Faza I - finanțată din POST: a) Sume certificate și plătite până la data de 31.12.2015; b) Lucrări executate pana la 30.09.2016 astfel: Lucrări executate până la 30.11.2015; Lucrări executate în perioada 01.12.2015 – 30.09.2016 care justifică valoarea avansului acordat și nerecuperat până la 31.12.2015. • Faza a II- a - finanțată din POIM: Sume certificate, ce vor fi plătite din POIM, aferente: lucrărilor executate în perioada 01.12.2015 – 30.09.2016 care justifică valoarea avansului acordat și nerecuperat până la 31.12.2015; lucrărilor aferente fazei a II – a, lucrări aferente finalizării proiectului in integralitatea sa, ale căror cheltuieli eligibile vor fi rambursate din Programul Operațional Infrastructura Mare (POIM) 2014-2020 Valoarea totală a proiectului (cu TVA) = 60.844.944,15 lei / 14.338.387 euro Valoarea totala a proiectului (fara TVA) = 50.645.151,53 lei / 11.934.760 euro Valoarea totală eligibila = 44.415.192,24 lei / 10.466.641 euro Valoarea totala eligibila a proiectului a fost modificata fată de Contractul de finantare POIM nr. 87/21.07.2017, intrucat pentru faza II a fost aplicata pro-rata de 10,56% aferenta regiunii Bucuresti-Ilfov (Conform Ghidului Solicitantului OS 1.5), calculata astfel: 34.831.868,36 lei (costuri eligibile cf. contract de fin POIM nr. 87/21.07.2017) * 10,56% = 3.678.245,31 lei (valoare pro-rata – costuri neeligibile) În aceste condiţii: - a fost aplicata pro-rata de 10,56% aferenta regiunii Bucuresti-Ilfov in valoare de 3.678.245,31 lei,pentru faza a II-a - valoarea diferenţei de FG s-a micsorat cu 140.508,97 lei/33.111 eur (fata de contractul de finantare POIM), Astfel, valoarea totala (Romanian)
    0 references
    The railway bridges covered by this project are located in the counties of Ilfov (5 bridges) and Prahova (2 bridges). The project “Rehabilitation works for bridges, bridges and railway tunnels – Bucharest Regional Railway Branch” aims at the rehabilitation of 5 bridges in Ilfov county and 2 bridges in Prahova county as follows: 1. Bridge, km 1+ 510, CF 301, Mogoșoaia Collector Line (Jud. Ilfov). 2. Bridge, km 20+ 474, CF 100, Bucharest – Videle, between Domnești and Garden Stations (county. Ilfov); 3. Bridge, km 21+ 084, CF 100, Bucharest – Videle, between Domneşi and Garden Stations (county. Ilfov); 4. Bridge, km 21+ 434, CF 100, Bucharest – Videle, between Domnești and Garden Stations (county. Ilfov); 5. Bridge, km 21+ 888, CF 100, Bucharest – Videle, between Domnești and Garden Stations (county. Ilfov); 6. Bridge, km 57+ 540, CF 304, Ploiești Sud – Ploiești Triaj, between Ploiești Sud and Ploiești Triaj stations (county. Prahova); 7. Bridge, km 57-560, CF 300, Bucharest – Ploiești, between Brazi and Ploiești Sud stations (county. Prahova); The project was phased and in accordance with the instructions given in EC ARES (2016) 3986196/28.07.2016, the project phase is represented as follows: • Phase I – funded by POST: a) Amounts certified and paid until 31.12.2015; B) Works executed until 30.09.2016 as follows: Works executed until 30.11.2015; Works carried out during the period 01.12.2015-30.09.2016 justifying the amount of the advance granted and not recovered by 31.12.2015. • Phase II – funded by LIOP: Certified amounts, to be paid from LIOP, related to: works carried out between 1 December 2015 and 30 September 2016 justifying the amount of the advance granted and not recovered by 31.12.2015; works related to phase II – a, works related to the completion of the project in its entirety, the eligible costs of which will be reimbursed from the Large Infrastructure Operational Programme (MAOP) 2014-2020 Total value of the project (with VAT) = 60.844.944.15 lei/EUR 14338387 Total value of the project (excluding VAT) = 50.645.151.53 lei/11934760 Total eligible value = 44.415.192, 24 lei/EUR 10466641 The total eligible value of the project was modified compared to LIOP Financing Contract No 87/21.07.2017, as for phase II it was applied pro-rata of 10.56 % for the Bucharest-Ilfov region (according to the Guide to the Applicant OS 1.5), calculated as follows: RON 34 831 868.36 (eligible costs cf. LIOP financial contract No 87/21.07.2017) * 10.56 % = RON 3 678 245.31 (pro-rata value – ineligible costs) Under these conditions: — was applied pro-rata of 10.56 % for the Bucharest-Ilfov region in the amount of RON 3,678,245.31, for phase II – the amount of the GF difference decreased by 140.508.97 lei/33.111 (compared to the LIOP financing contract), (English)
    16 September 2021
    0 references
    Judeţul Ilfov, Romania
    0 references
    Judeţul Prahova, Romania
    0 references

    Identifiers

    114234
    0 references