Reconstruction and fitting-out of the building part of the basic school of Aseri School (Q3067087)

From EU Knowledge Graph
Revision as of 06:07, 26 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): À la suite de la mise en œuvre du projet, la partie du bâtiment restant à l’usage de l’école de base d’Aseri Kool a été modernisée et reconstruite. Un bâtiment académique à part entière assure des conditions d’apprentissage modernes pour les étudiants sur une surface de 1 480 m². La superficie utilisée par l’école primaire a diminué de 2 793 m², ce qui a entraîné une réduction significative des coûts de gestion de l’école primaire. Sur le territ...)
Jump to navigation Jump to search
Project Q3067087 in Estonia
Language Label Description Also known as
English
Reconstruction and fitting-out of the building part of the basic school of Aseri School
Project Q3067087 in Estonia

    Statements

    0 references
    1,592,455.79 Euro
    0 references
    1,873,477.4 Euro
    0 references
    85.0 percent
    0 references
    13 April 2016
    0 references
    15 November 2019
    0 references
    Viru-Nigula vallavalitsus
    0 references
    0 references

    59°30'2.59"N, 26°30'48.53"E
    0 references
    44107
    0 references
    Projekti elluviimise tulemusel on Aseri Kooli põhikooli kasutusse jääv hooneosa kaasaegselt rekonstrueeritud ja sisustatud. Terviklikult lahendatud õppehoones on tagatud 1480 m² suurusel pinnal õpilastele nüüdisaegsed õppetingimused. Põhikooli kasutuses olev pind on vähenenud 2793 m² võrra, millest lähtuvalt on olulisel määral vähenenud ka põhikooli majandamiskulud. Tänase Aseri valla territooriumil on tagatud kvaliteetse põhihariduse pakkumine pikemal perioodil. (Estonian)
    0 references
    As a result of the implementation of the project, the part of the building remaining in the use of the basic school of Aseri Kool has been modernised and reconstructed. A fully-fledged academic building ensures modern learning conditions for students on a 1480 m² surface. The area used by the primary school has decreased by 2793 m², which has led to a significant reduction in the management costs of the primary school. In the territory of today’s municipality of Aseri, the provision of high-quality basic education is guaranteed for a longer period. (English)
    16 August 2021
    0 references
    À la suite de la mise en œuvre du projet, la partie du bâtiment restant à l’usage de l’école de base d’Aseri Kool a été modernisée et reconstruite. Un bâtiment académique à part entière assure des conditions d’apprentissage modernes pour les étudiants sur une surface de 1 480 m². La superficie utilisée par l’école primaire a diminué de 2 793 m², ce qui a entraîné une réduction significative des coûts de gestion de l’école primaire. Sur le territoire de la commune actuelle d’Aseri, la fourniture d’une éducation de base de qualité est garantie pour une période plus longue. (French)
    26 November 2021
    0 references

    Identifiers

    2014-2020.1.04.17-0034
    0 references