Improve the learning environment of general education institutions in Ogre county (Q3057714)

From EU Knowledge Graph
Revision as of 20:33, 25 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif de ce projet est d’améliorer l’environnement d’apprentissage de l’école secondaire no 1 d’Ogre et du gymnase d’État d’Ogre dans le comté d’Ogre, afin de promouvoir l’introduction progressive du contenu de l’enseignement général fondé sur l’approche des compétences planifiée grâce aux activités de développement des infrastructures, en créant un environnement ergonomique et moderne qui assurerait l’acquisition d’une éducation de qualité...)
Jump to navigation Jump to search
Project Q3057714 in Latvia
Language Label Description Also known as
English
Improve the learning environment of general education institutions in Ogre county
Project Q3057714 in Latvia

    Statements

    0 references
    5,028,931.34 Euro
    0 references
    28,280,120.15 Euro
    0 references
    17.78 percent
    0 references
    26 January 2018
    0 references
    31 August 2022
    0 references
    Ogres novada pašvaldība
    0 references
    0 references

    56°49'1.78"N, 24°36'38.59"E
    0 references
    Projekta mērķis ir uzlabot vispārējās izglītības iestāžu Ogres 1.vidusskolas un Ogres Valsts ģimnāzijas mācību vidi Ogres novadā, lai veikto infrastruktūras attīstības aktivitāšu rezultātā sekmētu plānoto kompetenču pieejā balstītā vispārējās izglītības satura pakāpenisku ieviešanu, izveidojot ergonomisku un modernu vidi, kas nodrošinātu kvalitatīvas un mūsdienīgas izglītības apgūšanu un ievērojami labākus darba apstākļus pedagogiem dažādu mācību metožu realizēšanai. Lai realizētu ieceres, Ogres 1.vidusskolā un Ogres Valsts ģimnāzijā ir nepieciešami ievērojami uzlabojumi, nepieciešams izveidot jaunas mācību telpas un nodrošināt Ogres Valsts ģimnāzijai jaunu ēku, ņemot vērā telpu trūkumu un to, ka izglītības iestāde atrodas vienā ēkā ar Ogres sākumskolu, kā arī to, ka izglītojamo skaitam Ogres pilsētas izglītības iestādēs ir tendence pieaugt, esošajās telpās rodas problēmas realizēt mūsdienu prasībām atbilstošu izglītības apguvi, kā arī mācību telpas nav iespējams izmantot racionāli un multifunkcionāli. Galvenās darbības saistās ar jaunas Ogres Valsts ģimnāzijas ēkas būvniecību, tās aprīkošanu ar ergonomiskām mēbelēm un IKT, Ogres 1.vidusskolas stadiona pārbūvi, jaunu dabaszinātņu kabinetu, matemātikas kabinetu un IKT kabinetu izveidi, multifunkcionālās zāles izbūvi, pilnas pabeigtības principa nodrošināšanu, izremontējot arī 2 latviešu valodas kabinetus, gaiteni, sanitāros mezglus, aprīkojot kabinetus ar mēbelēm un IKT. Jaunajā ģimnāzijas ēkā plānots izbūvēt arī metodisko centru. Plānots izbūvēt dienesta viesnīcu. Projekta kopējais ilgums - 56 mēneši, sākot no 2018.gada 1.ceturkšņa (februāra) līdz 2022.gada 3.ceturksnim (2022.gada 31.augustam). Kopējās izmaksas 30 476 627.71 EUR. (Latvian)
    0 references
    The aim of the project is to improve the training environment of general education institutions Ogre Secondary School No.1 and Ogre State Gymnasium in Ogre region in order to facilitate the gradual implementation of general education content based on the approach of the planned competencies, by creating an ergonomic and modern environment that would ensure the acquisition of high-quality and modern education and significantly better working conditions for teachers to implement various teaching methods. In order to realise the plans, in Ogre Secondary School No.1 and Ogre State Gymnasium significant improvements are necessary, it is necessary to create new training rooms and provide Ogre State Gymnasium with a new building, taking into account the lack of premises and the fact that the educational institution is located in the same building as the Ogre primary school, as well as the fact that the number of students in Ogre educational institutions tends to grow, the existing premises encounter problems to achieve modern education training, as well as the rational use of study spaces is not possible. The main activities relate to the construction of a new Ogre State Gymnasium building, its equipping with ergonomic furniture and ICT, the reconstruction of the stadium of Ogre Secondary School No.1, the construction of new offices of natural sciences, mathematics offices and ICT offices, the construction of a multifunctional hall, ensuring the full completion principle by repairing 2 Latvian-language offices, hallways, sanitary facilities, and equipment of ICT offices. In the new gymnasium building it is also planned to build a methodological center. It is planned to build a service hotel. The total duration of the project – 56 months, starting from the 1st quarter of 2018 (February) until the 3rd quarter of 2022 (31 August 2022). Total cost EUR 30476627.71. (English)
    15 July 2021
    0 references
    L’objectif de ce projet est d’améliorer l’environnement d’apprentissage de l’école secondaire no 1 d’Ogre et du gymnase d’État d’Ogre dans le comté d’Ogre, afin de promouvoir l’introduction progressive du contenu de l’enseignement général fondé sur l’approche des compétences planifiée grâce aux activités de développement des infrastructures, en créant un environnement ergonomique et moderne qui assurerait l’acquisition d’une éducation de qualité et moderne et de meilleures conditions de travail pour les enseignants pour mettre en œuvre diverses méthodes d’enseignement. Pour réaliser les intentions, des améliorations significatives sont nécessaires dans l’école secondaire no 1 d’Ogre et le gymnase d’État d’Ogre, ainsi que la nécessité de créer de nouvelles salles d’étude et de mettre à disposition un nouveau bâtiment pour le gymnase d’État d’Ogre, compte tenu du manque de locaux et du fait que l’établissement d’enseignement est situé dans le même bâtiment que l’école primaire d’Ogre, ainsi que du fait que le nombre d’élèves dans les établissements d’enseignement de la ville d’Ogre tend à augmenter, des problèmes se posent dans les locaux existants pour réaliser l’acquisition de l’éducation conformément aux exigences modernes, et il est impossible d’utiliser les locaux d’études de manière rationnelle et multifonctionnelle. Les principales activités ont trait à la construction d’un nouveau bâtiment du gymnase d’État d’Ogre, à l’équipement de mobilier ergonomique et de TIC, à la reconstruction du stade de l’école secondaire d’Ogre no 1, à la création de nouveaux cabinets de sciences naturelles, de cabinets de mathématiques et d’armoires TIC, à la construction d’une salle multifonctionnelle, au principe de l’achèvement complet, à la réparation de 2 salles de langue lettone, des couloirs, des installations sanitaires, de l’équipement des armoires en mobilier et des TIC. Le nouveau bâtiment du gymnase est également prévu pour la construction d’un centre méthodique. Il est prévu de construire un hôtel de service. Durée totale du projet — 56 mois, à partir du 1er trimestre (février) de 2018 jusqu’au 3e trimestre 2022 (31 août 2022). Coût total 30 476 627,71 EUR. (French)
    25 November 2021
    0 references
    Zinību iela 3, Ogre, Ogres nov., LV-5001
    0 references

    Identifiers

    8.1.2.0/17/I/008
    0 references