Reconstruction of the main state motorway A9 Riga (Skulte) – Liepaja, km 24.40-38.18 duvet (bridge) (Q3057608)

From EU Knowledge Graph
Revision as of 20:33, 25 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif du projet est d’effectuer la reconstruction du trottoir et du pont (augmentation de la capacité portante de la chaussée), qui comprend la construction de nouveaux chaussées en béton bitumineux, la supervision de la construction, la supervision de l’auteur, ce qui permettra aux usagers de la route de bénéficier de conditions de conduite confortables et sûres. Durée totale prévue de mise en œuvre du projet 29 mois. Le coût total du proj...)
Jump to navigation Jump to search
Project Q3057608 in Latvia
Language Label Description Also known as
English
Reconstruction of the main state motorway A9 Riga (Skulte) – Liepaja, km 24.40-38.18 duvet (bridge)
Project Q3057608 in Latvia

    Statements

    0 references
    0 references
    0 references
    12,302,332.18 Euro
    0 references
    14,473,331.97 Euro
    0 references
    85.0 percent
    0 references
    17 September 2015
    0 references
    16 February 2018
    0 references
    Satiksmes ministrija
    0 references
    0 references
    0 references

    56°47'23.46"N, 23°35'55.79"E
    0 references

    56°47'15.65"N, 23°36'54.50"E
    0 references
    Projekta mērķis ir veikt segas un tilta pārbūvi (paaugstinot segas nestspēju), kas ietver jauna asfaltbetona seguma izbūvi, būvuzraudzību, autoruzraudzību, kā rezultātā tiks nodrošināti autoceļu lietotājiem komfortabli un droši braukšanas apstākļi. Plānotais kopējais projekta īstenošanas ilgums 29 mēneši. Projekta plānotās kopējās izmaksas 17 544 860 euro. Projekta īstenošanas rezultātā tiks sakārtots valsts galvenā autoceļa A9 Rīga (Skulte) – Liepāja posms ar tiltu pār Lielupi 13,68 km garumā. Projektā ietvertā autoceļa posma maksimālā autotransporta dzenošās ass slodze pēc projekta īstenošanas būs 11,5 tonnas un maksimālā nekontrolētā transportlīdzekļa pilnā masa būs 44 tonnas. (Latvian)
    0 references
    The aim of the project is to rebuild the duvet and bridge (increasing the bearing capacity of the duvet), which includes construction of new asphalt concrete pavement, construction supervision, author supervision, as a result of which comfortable and safe driving conditions will be provided to road users. The total planned duration of the project is 29 months. Estimated total cost of the project EUR 17544860. As a result of the project, the main state motorway A9 Riga (Skulte) – Liepāja section with bridge over Lielupe 13,68 km will be arranged. The maximum driving axle load on the road section covered by the project will be 11.5 tonnes and the maximum uncontrolled vehicle mass will be 44 tonnes. (English)
    15 July 2021
    0 references
    L’objectif du projet est d’effectuer la reconstruction du trottoir et du pont (augmentation de la capacité portante de la chaussée), qui comprend la construction de nouveaux chaussées en béton bitumineux, la supervision de la construction, la supervision de l’auteur, ce qui permettra aux usagers de la route de bénéficier de conditions de conduite confortables et sûres. Durée totale prévue de mise en œuvre du projet 29 mois. Le coût total du projet est estimé à 17 544 860 EUR. À la suite de la mise en œuvre du projet, la route principale A9 Riga (Skulte) — Liepāja avec pont au-dessus de Lielupe sera aménagée sur une longueur de 13,68 km. La charge maximale par essieu moteur du tronçon routier couvert par le projet sera de 11,5 tonnes après la mise en œuvre du projet et le véhicule non contrôlé maximal de 44 tonnes. (French)
    25 November 2021
    0 references
    Kalnciema pag., Jelgavas nov.
    0 references
    Valgundes pag., Jelgavas nov.
    0 references
    Jaunbērzes pag., Dobeles nov.
    0 references

    Identifiers

    6.1.5.0/15/I/002
    0 references