Improvement of Energy Efficiency of the City Council Building Complex (Q3057086)

From EU Knowledge Graph
Revision as of 20:10, 25 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet sera mis en œuvre à partir du 08.03.2016. Règlement du Cabinet no 152 "Mise en œuvre de l’objectif spécifique de soutien 4.2.2 du programme opérationnel "Croissance et emploi""Conformément aux programmes de développement intégrés des collectivités locales visant à promouvoir l’efficacité énergétique et l’utilisation des ressources énergétiques renouvelables dans les bâtiments des collectivités locales" (ci-après le "règlement du Cabine...)
Jump to navigation Jump to search
Project Q3057086 in Latvia
Language Label Description Also known as
English
Improvement of Energy Efficiency of the City Council Building Complex
Project Q3057086 in Latvia

    Statements

    0 references
    0 references
    541,274.34 Euro
    0 references
    636,793.34 Euro
    0 references
    85.0 percent
    0 references
    1 July 2017
    0 references
    31 December 2018
    0 references
    RĒZEKNES PILSĒTAS DOME
    0 references
    0 references

    56°30'35.75"N, 27°19'58.37"E
    0 references
    Projekts tiks īstenots saskaņā ar 08.03.2016. MK noteikumiem Nr.152 “Darbības programmas “Izaugsme un nodarbinātība” 4.2.2. specifiskā atbalsta mērķa “Atbilstoši pašvaldības integrētajām attīstības programmām sekmēt energoefektivitātes paaugstināšanu un atjaunojamo energoresursu izmantošanu pašvaldību ēkās” īstenošanas noteikumiem” (turpmāk - MK noteikumiem Nr.152).Projekta mērķis: samazināt primārās enerģijas patēriņu, sekmējot energoefektivitātes paaugstināšanu un pašvaldību izdevumu samazināšanos par siltumapgādi, veicot ieguldījumus Rēzeknes pilsētas domes ēku kompleksā Atbrīvošanas alejā 93, Rēzeknē, atbilstoši pašvaldību attīstības programmās noteiktajām prioritātēm.Projekta galvenās darbības: 1.Projekta vadība;2.Būvdarbu veikšana;3.Būvuzraudzība;4.Autoruzraudzība;5.Energosertifikācija;6.Publicitātes pasākumi.Projekta ilgums: 18 (astoņpadsmit) mēneši.Projekta kopējas izmaksas: EUR 774 549,86 (no tam attiecināmās izmaksas - EUR 643 266,70, neattiecināmās EUR 131 283,16), ERAF finansējums – EUR 546 776,70, valsts dotācija – EUR 24 122,50, pašvaldības finansējums – EUR 203 650,66. Projekta rezultāts: primāras enerģijas patēriņa samazinājums 352769 kWh/gadā, CO2 emisijas samazinājums – 63.37 t CO2 gadā. (Latvian)
    0 references
    The project will be implemented according to 08.03.2016. Cabinet Regulations No.152 "Operation programme "Growth and Employment" Specific Support Objective 4.2.2 "Compliance with Local Government Integrated Development Programmes to Promote Energy Efficiency and Use of Renewable Energy in Local Government Buildings" (henceforward – Cabinet Regulations No.152).Project objective: Reduce primary energy consumption by promoting energy efficiency and reduction of municipal expenditure on heating by investing in Rezekne City Council complex Atbrīvošanas aleja 93, Rezekne, in accordance with priorities defined in municipal development programmes. 1.Project Management;2.Implementation of construction works;3. Construction supervision;4.Author supervision;5.Energosertification;6.Publicity activities.Project duration: 18 (eighteen) months Total cost of the project: EUR 774 549.86 (of which eligible costs: EUR 643 266.70, ineligible EUR 131 283.16), ERDF contribution EUR 546 776.70, State grant EUR 24 122,50, municipal funding EUR 203 650,66. Project result: Reduction of primary energy consumption of 352769 kWh/year, CO2 reduction of 63.37 t CO2/year. (English)
    15 July 2021
    0 references
    Le projet sera mis en œuvre à partir du 08.03.2016. Règlement du Cabinet no 152 "Mise en œuvre de l’objectif spécifique de soutien 4.2.2 du programme opérationnel "Croissance et emploi""Conformément aux programmes de développement intégrés des collectivités locales visant à promouvoir l’efficacité énergétique et l’utilisation des ressources énergétiques renouvelables dans les bâtiments des collectivités locales" (ci-après le "règlement du Cabinet no 152"). réduire la consommation d’énergie primaire en favorisant l’amélioration de l’efficacité énergétique et la réduction des dépenses des collectivités locales en matière de chauffage en investissant dans le complexe des bâtiments du conseil municipal de Rezekne à la Libération Alley 93, Rezekne, conformément aux priorités définies dans les programmes de développement des collectivités locales. 1.Gestion du projet;2.Performance des travaux de construction;3.Suivi de la construction;4.Droit d’auteur;5.Certificat d’Energos;6.Mesures de publicité.Durée du projet: 18 (dix-huit) mois.Le coût total du projet: 7 745 549,86 EUR (dont coûts éligibles: 643 266,70 EUR, non éligibles 131283,16) EUR, financement du FEDER: 546 666,70 EUR, subvention de l’État 24 122,50 EUR, financement des collectivités locales: 20 365,66 EUR. Résultat du projet: réduction de la consommation d’énergie primaire 352 769 kWh/an, réduction des émissions de CO2 de 63,37 t CO2 par an. (French)
    25 November 2021
    0 references
    Atbrīvošanas aleja 93, Rēzekne, LV-4601
    0 references

    Identifiers

    4.2.2.0/17/I/003
    0 references