Enhancement of energy efficiency in the building of SSIA “Daugavpils Psychoneirological Hospital” in Siguldas iela 24, Daugavpils (Q3057046)

From EU Knowledge Graph
Revision as of 20:10, 25 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif du projet est de réaliser des mesures d’amélioration de l’efficacité énergétique dans la construction de VSIA «Daugavpils Psychoneurological Hospital» au 24, rue Siguldas, Daugavpils, réduisant la consommation d’énergie primaire et les émissions de gaz à effet de serre. Les mesures visant à améliorer l’efficacité énergétique comprennent l’isolation des murs extérieurs et du sous-sol du bâtiment, l’isolation de la structure du grenier...)
Jump to navigation Jump to search
Project Q3057046 in Latvia
Language Label Description Also known as
English
Enhancement of energy efficiency in the building of SSIA “Daugavpils Psychoneirological Hospital” in Siguldas iela 24, Daugavpils
Project Q3057046 in Latvia

    Statements

    0 references
    0 references
    939,928.9 Euro
    0 references
    1,105,798.7 Euro
    0 references
    85.0 percent
    0 references
    18 February 2021
    0 references
    17 August 2022
    0 references
    Valsts sabiedrība ar ierobežotu atbildību "Daugavpils psihoneiroloģiskā slimnīca"
    0 references
    0 references

    55°52'28.81"N, 26°33'24.77"E
    0 references
    Projekta mērķis ir veikt energoefektivitātes paaugstināšanas pasākumus VSIA “Daugavpils psihoneiroloģiskā slimnīca” ēkā Siguldas ielā 24, Daugavpilī, samazinot primārās enerģijas patēriņu un siltumnīcefekta gāzu emisiju. Veicamie energoefektivitātes paaugstināšanas pasākumi ietver ēkas ārsienu un pagrabstāva siltināšanu, bēniņu un jumta konstrukcijas siltināšanu, kā arī logu un durvju nomaiņu, tādējādi samazinot siltuma caurlaidību un sekmējot enerģijas izmantošanas efektivitāti. Plānotais projekta ilgums ir 18 mēneši no vienošanās par projekta īstenošanu noslēgšanas brīža, un paredzētās kopējās izmaksas ir 1 257 887,75 euro, tai skaitā Eiropas Reģionālās attīstības fonda finansējums 939 928,90 euro apmērā un valsts budžeta finansējums 165 869,80 euro apmērā.Īstenojot projektā plānotos uzlabojumus ēkas energoefektivitātes paaugstināšanai, paredzams, ka, salīdzinot ar tagadējiem rādītājiem, primārās enerģijas patēriņš samazināsies par pusi, savukārt siltumnīcefekta gāzu emisija sasniegs 55 % samazinājumu. (Latvian)
    0 references
    The aim of the project is to implement energy efficiency improvement measures in the VSIA “Daugavpils Psychoneurological Hospital” in Siguldas Street 24, Daugavpils, reducing primary energy consumption and greenhouse gas emissions. Energy efficiency improvement measures include insulation of building exterior walls and basement floor, insulation of attic and roof structure, as well as replacement of windows and doors, thus reducing heat permeability and promoting energy efficiency. The planned duration of the project is 18 months from the conclusion of the agreement on the implementation of the project, and the estimated total costs are EUR 1257887.75, including the European Regional Development Fund funding of EUR 939928.90 and the state budget funding of EUR 165869.80.In implementing the planned improvements for the improvement of the building’s energy efficiency, it is expected that the primary energy consumption will decrease by half compared to the current indicators, while greenhouse gas emissions will achieve a 55 % reduction. (English)
    15 July 2021
    0 references
    L’objectif du projet est de réaliser des mesures d’amélioration de l’efficacité énergétique dans la construction de VSIA «Daugavpils Psychoneurological Hospital» au 24, rue Siguldas, Daugavpils, réduisant la consommation d’énergie primaire et les émissions de gaz à effet de serre. Les mesures visant à améliorer l’efficacité énergétique comprennent l’isolation des murs extérieurs et du sous-sol du bâtiment, l’isolation de la structure du grenier et du toit, ainsi que le remplacement des fenêtres et des portes, ce qui réduit la transmission de chaleur et favorise l’efficacité énergétique. La durée prévue du projet est de 18 mois à compter de la date de conclusion de l’accord sur la mise en œuvre du projet, et les coûts totaux estimés sont de 1 257 887,75 EUR, y compris le financement du Fonds européen de développement régional d’un montant de 939 928,90 EUR et le financement du budget de l’État pour un montant de 165 869,80 EUR. Dans la mise en œuvre des améliorations prévues dans l’amélioration de l’efficacité énergétique du bâtiment, il est prévu que, par rapport aux indicateurs actuels, la consommation d’énergie primaire diminuera de moitié, tandis que les émissions de gaz à effet de serre atteindront 55 %. (French)
    25 November 2021
    0 references
    Siguldas iela 24, Daugavpils, LV-5404
    0 references

    Identifiers

    4.2.1.2/20/I/008
    0 references