Increase energy efficiency of state buildings at 20 Kr.Valdemāra Street, Rezekne (Q3056944)

From EU Knowledge Graph
Revision as of 20:09, 25 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif du projet est de mettre en œuvre les bâtiments d’État au 20 Kr.Valdemāra Street, Rezekne, l’amélioration de l’efficacité énergétique et les mesures de rénovation nécessaires, améliorant ainsi la résistance thermique du bâtiment et affectant positivement l’utilisation efficace des ressources énergétiques en Lettonie. Le projet dans le bâtiment d’État (bâtiment de bureaux), Kr.Valdemāra iela 20, Rezekne, la désignation cadastre de const...)
Jump to navigation Jump to search
Project Q3056944 in Latvia
Language Label Description Also known as
English
Increase energy efficiency of state buildings at 20 Kr.Valdemāra Street, Rezekne
Project Q3056944 in Latvia

    Statements

    0 references
    0 references
    405,146.34 Euro
    0 references
    476,642.75 Euro
    0 references
    85.0 percent
    0 references
    30 July 2018
    0 references
    28 June 2020
    0 references
    Nodrošinājuma valsts aģentūra
    0 references
    0 references

    56°30'35.10"N, 27°19'57.58"E
    0 references
    Projekta mērķis ir veikt valsts ēkas Kr.Valdemāra ielā 20, Rēzeknē, energoefektivitātes paaugstināšanas un nepieciešamos ēkas atjaunošanas pasākumus, tādējādi uzlabojot ēkas siltumnoturību un pozitīvi ietekmējot energoresursu efektīvu izmantošanu Latvijā.Projekta valsts ēkā (biroja ēka), Kr.Valdemāra ielā 20, Rēzeknē, būves kadastra apzīmējums 2100 005 0714 001, ēkas kopējā platība ir 3433,70 m² (turpmāk – ēka) ir valsts īpašumā, IeM valdījumā, Nodrošinājuma valsts aģentūras pārvaldīšanā. Ēkā ir izvietotas vairākas institūcijas, galvenokārt, Valsts policijas Latgales reģiona pārvaldes Rēzeknes iecirknis ar īslaicīgās aizturēšanas izolatoriem, Latvijas Republikas Prokuratūra, Iekšlietu ministrijas Informācijas centra darbinieki un Nodrošinājuma valsts aģentūras darbinieki. Ēkai 2016.gadā tika veikta tehniskā apsekošana un tika secināts, ka vispārējo ēkas tehnisko stāvokli var novērtēt kā apmierinošu, bet tika konstatētas vairākas problēmas, kuru dēļ ir siltuma enerģijas zudumi un zema ēkas norobežojošo konstrukciju siltuma noturība, līdz ar to, zema energoefektivitāte, ēkai nepietiekami veikti siltumizolācijas darbi.Būtiskākās problēmas: ēka tika uzcelta un nodota ekspluatācijā 1970.gadā. Ēkas fiziskais nolietojums ir novērtēts 21,81%. Vispārējais ēkas tehniskais stāvoklis ir apmierinošs, bet nav energoefektīvs: ēkas sienas nav siltinātas un tās neatbilst LBN 002-15 “Ēku norobežojošo konstrukciju siltumtehnika” prasībām. ēkai tika konstatētas lokālas plaisas; ēkas pamatu konstrukciju samirkšanas iespēju palielina tas, ka paralēli tam, ka nav izbūvēta vertikālā hidroizolācija ēkai daudzviet trūkst vai ir bojāta betona aizsargapmale; horizontālā hidroizolācija ir veidota no bitumena materiāliem, kura, nenodrošina pilnvērtīgu aizsardzību; gar ēkas veco korpusu aizsargapmale nav izbūvēta; lietus ūdens novadīšana notiek pie ēkas pamatiem nevis lietusūdens kanalizācijas sistēmā; ēkas konstrukcijas nav pasargātas no paaugstinātas mitruma iedarbības; aizsargapmale vietām ir iesēdusies grunts izskalošanās rezultātā un tai ir citi dažāda veida bojājumi; ēkas pamati un ārsienas nav siltinātas; bēniņu pārsegums jaunajam korpusam papildus nav siltināts; ēkas norobežojošās konstrukcijas neatbilst Noteikumiem par Latvijas būvnormatīvu LBN 002-15 “Ēku norobežojošo konstrukciju siltumtehnika” prasībām; atsevišķi logi nav nomainīti; logu montāža ir veikta nekvalitatīvi. Līdz ar to, lai nodrošinātu minēto problēmu efektīvu risināšanu, nepieciešams ieviest šādas energoefektivitātes pasākumu kompleksās aktivitātes: pirms siltināšanas darbiem nepieciešams novērst būvkonstrukciju defektus un bojājumus; ēkas jaunā korpusa fasādes sienu siltināšana; ēkas jaunā korpusa cokola siltināšana; ēkas jaunā korpusa jumta pārseguma siltināšana; ēkas vecā korpusa bēniņu pārseguma siltināšana; esošo PVC tipa, koka un stikla bloku logu nomaiņa pret jauniem PVC tipa un koka logiem; esošo ieejas mezglu nomaiņa pret blīvām ārdurvīm; apkures sistēmas atjaunošana; pieslēguma elementu atjaunošana; jumta lietusūdens noteksistēmas atjaunošana; betona aizsargapmales atjaunošana. Pēc projekta īstenošanas tiks sagaidāmi projekta galvenie rezultāti: - siltumenerģijas patēriņa samazinājums: no 481,142 MWh līdz 275,774 MWh gadā (42,68 % samazinājums) vai no 140,12 kWh/m2 gadā līdz 80,31 kWh/m2 gadā; primārās enerģijas patēriņa samazinājums: no 854,20 MWh līdz 587,23 MWh gadā (31,25 % samazinājums) vai no 248,77 kWh/m2 gadā līdz 171,02 kWh/m2 gadā. Primāras enerģijas faktors siltumenerģijai – 1,3 un elektroenerģijai 1,5; oglekļa dioksīda CO2 emisijas samazinājums gadā: no 143,645 tCO2/gadā līdz 89,428 tCO2/gadā (37,74 % samazinājums). CO2 emisijas faktors siltumenerģijai 0,264 tCO2/MWh, elektroenerģijai 0,109 tCO2/MWh.Projekta ieviešanas laiks ir no 2018.gada jūlija līdz 2020.gada 29.jūnijam, kopā–23 mēneši. Projekta kopējās izmaksas ir 514 901.57 EUR, tajā skaitā attiecināmās izmaksas 476 642.75 EUR: 85% ir ERAF finansējums 405 146.34 EUR un 15% ir valsts budžeta līdzekļi 71 496.41 EUR un neattiecināmās izmaksas 38 258,82 EUR. (Latvian)
    0 references
    The aim of the project is to carry out energy efficiency improvement measures of the state building at 20 Kr.Valdemāra Street, Rezekne, thus improving the thermal stability of the building and positively impacting the efficient use of energy resources in Latvia.The project in the state building (the office building), 20 Kr.Valdemāra Street, Rezekne, the cadastral designation of the building 2100 005 0714 001, the total area of the building is 3433.70 m² (hereinafter – the building) is in state property, in the possession of the Ministry of Insurance of the State Agency. Several institutions are located in the building, mainly the Rezekne district of the State Police Latgale Region Administration with temporary detention insulators, the Prosecutor’s Office of the Republic of Latvia, the Information Centre of the Ministry of the Interior and employees of the Security State Agency. Technical inspection was carried out on the building in 2016 and it was concluded that the overall technical condition of the building could be assessed as satisfactory, but several problems were identified, which resulted in loss of heat energy and low heat resistance of building envelopes, therefore, low energy efficiency, insufficient heat insulation works for the building. The building was built and commissioned in 1970. Physical depreciation of the building is estimated at 21,81 %. The overall technical condition of the building is satisfactory, but not energy efficient: The walls of the building are not insulated and they do not comply with the requirements of LBN 002-15 “Heat engineering of building envelopes”. The possibility of sinking the foundations of the building is increased by the fact that, in parallel to the absence of vertical waterproofing of the building, the building is missing or damaged in many places; Horizontal waterproofing is made of bituminous materials, which does not provide full protection; The protective ring along the old block of the building has not been built; Rainwater discharge takes place at the foundation of the building rather than in a rainwater drainage system; The constructions of the building are not protected from increased moisture; The defensive ring is trapped in places as a result of soil leaching and has other types of damage; The foundations and exterior walls of the building have not been insulated; The attic cover for the new casing is not additionally insulated; The building envelopes do not comply with the Regulations on the requirements of Latvian Building Norms LBN 002-15 “Heat Engineering of Building Buildings”; Individual windows have not been replaced; Window assembly has been done in poor quality. In order to ensure that these challenges are effectively addressed, it is therefore necessary to introduce the following complex actions of energy efficiency measures: Before insulation works, it is necessary to prevent defects and damage to the construction works; Insulation of walls of the new block facade of the building; Insulation of the new block base of the building; Insulation of the new block roof covering of the building; Insulation of the attic cover of the old block of the building; Replacement of existing PVC type, wooden and glass block windows with new PVC type and wooden windows; Replacement of existing entrance units with dense external doors; Reconditioning of the heating system; Renewal of connection elements; Restoration of roof rainwater drainage system; Restoration of concrete coamings. The main project results will be expected after the implementation of the project: Reduction in thermal energy consumption: From 481,142 MWh to 275,774 MWh/year (42,68 % reduction) or from 140,12 kWh/m²/year to 80,31 kWh/m²/year; Reduction of primary energy consumption: From 854,20 MWh to 587,23 MWh/year (31,25 % reduction) or from 248,77 kWh/m²/year to 171,02 kWh/m² per year. The primary energy factor for heat: 1,3 and for electricity 1,5; Annual reduction of carbon dioxide CO2 emissions: From 143.645 tCO2/year to 89.428 tCO2/year (37.74 % reduction). CO2 emission factor for thermal energy 0,264 tCO2/MWh, electricity 0,109 tCO2/MWh.Project implementation time is from July 2018 until 29 June 2020, total-23 months. The total cost of the project is EUR 514901.57, including eligible costs EUR 476642.75: 85 % is ERDF funding EUR 405146.34 and 15 % is state budget funds of EUR 71496.41 and ineligible costs of EUR 38258.82. (English)
    15 July 2021
    0 references
    L’objectif du projet est de mettre en œuvre les bâtiments d’État au 20 Kr.Valdemāra Street, Rezekne, l’amélioration de l’efficacité énergétique et les mesures de rénovation nécessaires, améliorant ainsi la résistance thermique du bâtiment et affectant positivement l’utilisation efficace des ressources énergétiques en Lettonie. Le projet dans le bâtiment d’État (bâtiment de bureaux), Kr.Valdemāra iela 20, Rezekne, la désignation cadastre de construction 2100 005 0714 001, la superficie totale du bâtiment est de 3 433,70 m² (ci-après — le bâtiment) est la propriété de l’État, en possession du ministère de l’Intérieur, sous la direction de l’Agence de sécurité d’État. Plusieurs institutions se trouvent dans le bâtiment, principalement le poste de Rezekne de l’administration de la région de Latgale, avec des isolants de détention provisoire, le Bureau du Procureur de la République de Lettonie, le Centre d’information du Ministère de l’intérieur et des employés de l’Agence de sécurité de l’État. En 2016, un contrôle technique a été effectué pour le bâtiment et il a été conclu que l’état technique global du bâtiment peut être jugé satisfaisant, mais un certain nombre de problèmes ont été identifiés en raison de la perte d’énergie thermique et de la faible stabilité thermique des enveloppes du bâtiment, donc une faible efficacité énergétique et des travaux d’isolation thermique insuffisants pour le bâtiment. le bâtiment a été construit et mis en service en 1970. La dépréciation physique du bâtiment est estimée à 21,81 %. L’état technique général du bâtiment est satisfaisant mais non économe en énergie: les murs du bâtiment ne sont pas isolés et ne répondent pas aux exigences du LBN 002-15 «Ingénierie thermique des enveloppes du bâtiment». Des fissures locales ont été détectées pour le bâtiment; la possibilité de secouer les structures de fondation du bâtiment est augmentée par le fait que, en plus de l’absence d’étanchéité verticale du bâtiment dans de nombreux endroits, le bord de protection en béton est manquant ou endommagé; L’étanchéité horizontale est faite de matériaux bitumineux, ce qui ne fournit pas une protection complète; le bord de protection n’a pas été construit le long de l’ancienne structure du bâtiment; le rejet d’eau de pluie a lieu à la fondation du bâtiment et non dans le système de drainage des eaux de pluie; la construction du bâtiment n’est pas protégée de l’humidité accrue; la jante de protection est fixée à la suite d’un lessivage du sol et présente d’autres types de dommages; les fondations et les murs extérieurs du bâtiment ne sont pas isolés; la couverture du grenier pour le nouveau corps n’est en outre pas isolée; les enveloppes des bâtiments ne sont pas conformes aux exigences de la norme lettone relative au bâtiment LBN 002-15 «Ingénierie thermique des structures enveloppantes»; les fenêtres individuelles n’ont pas été remplacées; L’assemblage des fenêtres a été mal exécuté. Par conséquent, afin de s’assurer que ces problèmes soient traités efficacement, il est nécessaire d’introduire le paquet suivant de mesures en matière d’efficacité énergétique: avant les travaux d’isolation, il est nécessaire d’éviter les défauts et les dommages des structures de construction; isolation des murs de façade du nouveau bâtiment; isolation de la nouvelle base du bâtiment; isolation du revêtement de toiture de la nouvelle structure du bâtiment; isolation de la division grenier de l’ancienne structure du bâtiment; remplacement des fenêtres existantes de type PVC, de bois et de verre par de nouvelles fenêtres en PVC et en bois; remplacement des nœuds d’entrée existants par des portes extérieures denses; remise à neuf du système de chauffage; renouvellement des éléments de connexion; restauration du système de drainage des eaux pluviales du toit; restauration du trottoir en béton. Après la mise en œuvre du projet, les principaux résultats du projet seront attendus: — réduction de la consommation d’énergie thermique: entre 481,142 MWh et 275,774 MWh/an (réduction de 42,68 %) ou de 140,12 kWh/m²/an à 80,31 kWh/m²/an; réduction de la consommation d’énergie primaire: entre 854,20 MWh et 587,23 MWh/an (diminution de 31,25 %) ou de 248,77 kWh/m²/an à 171,02 kWh/m²/an. Facteur d’énergie primaire pour la chaleur — 1,3 et pour l’électricité 1,5; réduction annuelle des émissions de CO2 de dioxyde de carbone: de 143 645 tCO2/an à 89,428 tCO2/an (réduction de 37,74 %). Facteur d’émission de CO2 pour la chaleur 0,264 tCO2/MWh pour l’électricité 0,109 tCO2/MWh.La période de mise en œuvre du projet s’étend de juillet 2018 au 29 juin 2020, total à 23 mois. Le coût total du projet s’élève à 514 901,57 EUR, y compris les coûts éligibles 476 642,75 EUR: 85 % proviennent d’un financement du FEDER de 40 546,34 EUR et 15 % de ressources du budget de l’État de 71 496,41 EUR et de coûts inéligibles de 38 258,82 EUR. (French)
    25 November 2021
    0 references
    Kr. Valdemāra iela 20, Rēzekne, LV-4601
    0 references

    Identifiers

    4.2.1.2/18/I/012