Improvement of energy efficiency in the LLU 6th service hotel at Pētera iela 1, Jelgava (Q3056922)

From EU Knowledge Graph
Revision as of 20:09, 25 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Dans le cadre du projet, il est prévu de promouvoir l’amélioration de l’efficacité énergétique à l’hôtel 6ème service de l’Université de Lettonie, rue Petera 1, Jelgava. Le projet prévoit de mettre en œuvre les activités suivantes:- l’isolation des murs extérieurs;- le remplacement des fenêtres et des portes;- l’isolation du couvercle des greniers, la réparation de la construction du toit et la construction d’un système de protection contre la f...)
Jump to navigation Jump to search
Project Q3056922 in Latvia
Language Label Description Also known as
English
Improvement of energy efficiency in the LLU 6th service hotel at Pētera iela 1, Jelgava
Project Q3056922 in Latvia

    Statements

    0 references
    0 references
    350,388.44 Euro
    0 references
    412,221.69 Euro
    0 references
    85.0 percent
    0 references
    13 November 2018
    0 references
    12 July 2019
    0 references
    LATVIJAS LAUKSAIMNIECĪBAS UNIVERSITĀTE
    0 references
    0 references

    56°38'59.86"N, 23°43'3.11"E
    0 references
    Projekta ietvaros plānots veicināt energoefektivitātes paaugstināšanu Latvijas Lauksaimniecības universitātes 6.dienesta viesnīcā Pētera ielā 1, Jelgavā.Projektā paredzēts īstenot šādas darbības:- ārsienu siltināšana;- logu un durvju nomaiņa;- bēniņu pārseguma siltināšana, jumta konstrukcijas remonts un zibens aizsardzības sistēmas izbūve; - apkures sistēmas un siltummezgla atjaunošana;- ārējā gāzes vada pārvietošana;- būvdarbu būvuzraudzība un autoruzraudzība;- projekta vadība;- publicitātes pasākumi.Projekta ieviešanas laiks - 8 mēneši.Plānotās kopējās izmaksas - 85% ERAF finansējums - EUR 406 936.01un 15% valsts budžeta finansējums - EUR 71 812.24, publiskās neattiecināmās izmaksas - EUR 61 177.20.Iznākuma rādītāji:1) Primārās enerģijas gada patēriņa samazinājums sabiedriskajās ēkās 2019.gadā - 378.645 MWh;2) Aprēķinātais siltumnīcefekta gāzu samazinājums 2019.gadā - 69.532 CO2 ekvivalenta tonnas.Plānotie rezultāti:1) Sagatavota projekta pamatojošā dokumentācija - 3 līgumi;2) Veikti ēkas energoefektivitātes būvdarbi - 2 līgumi;3) Nodrošināti būvuzraudzības un autoruzraudzības pakalpojumi - 2 līgumi;4) Realizēti publicitātes pasākumi, uzstādīta 1 gab. informatīvā plāksne;5) Nodrošināta projekta vadība 8 mēnešus; (Latvian)
    0 references
    Within the framework of the project it is planned to promote energy efficiency improvement at the 6th service hotel of the Latvian University of Agriculture at 1 Pētera Street, Jelgava.The project will implement the following actions:- insulation of external walls;- replacement of windows and doors;- insulation of attic cover, repair of roof structure and construction of lightning protection system; Project implementation time – 8 months.Project implementation time – 85 % ERDF funding – EUR 406 936.01 and 15 % state budget funding – EUR 71 812.24, public ineligible costs – EUR 61 177.20 Output indicators:1) Reduction of annual consumption of primary energy in public buildings in 2019 – executional project contract – 378.645 3.2) Building executable for the year 2019.2) Output indicators:1) Reduction of annual consumption of primary energy in public buildings – 5.8; 3.2.4; 3.2.2) Output indicators:1) Reduction of annual consumption of primary energy in public buildings – 5 months prepared from the public budget – 378.645 3.2.2 energy contract; Public ineligible costs – EUR 61 177.20) Output indicators:1) Reduction of annual consumption of primary energy in public buildings in 2019 – execution of execution of 5.1 – execution of supervision of the building; 3.2.2 months of project executional project executable costs – EUR 61 177.20 Output indicators:1) Reduction of annual consumption of primary energy in public buildings – 5.1 – supervision of supervision of the building; 3.2.4 – executive project executional contract; 2019.69.532.2) Output indicators:1) Reduction of annual consumption of primary energy in public buildings – 3.2-fi – supervision of the public budget – EUR 3.2 months of the project’s management; Ineligible public costs – EUR 61 177.20.Project implementation time – 85 % ERDF Funding – EUR 406 936.01 and 15 % state budget funding – EUR 71 812.24; Public ineligible costs – EUR 61 177.20 Indicative project indicators:1) Reduction of annual consumption of primary energy in public buildings – 3.2.4 – supervision of the public budget – EUR 2 – execution of the project – 3.2.2 energy performance contracts; Public ineligible costs – EUR 61 177.20. Output indicators:1) Reduction of annual consumption of primary energy in public buildings – 3.2.4 – supervision of the building; 3.2.4 – supervision of the building; 3.2.3.2.4.4.1.3.4.1.4.1.3.4able on public works.532.2.532) Reduction of annual consumption of primary energy in public buildings in 2019-378.2 months of public works;- project management;- publicity measures.Project implementation time – 8 months.Project implementation time – 85 % ERDF Funding – EUR 406 936.01 and 15 % state budget funding – EUR 71 812.24, public ineligible costs – EUR 61 177.20 Output indicators:1) Reduction of annual consumption of primary energy in public buildings – EUR 2 – execution of public budget – EUR 71 812.24; Publication of in (English)
    15 July 2021
    0 references
    Dans le cadre du projet, il est prévu de promouvoir l’amélioration de l’efficacité énergétique à l’hôtel 6ème service de l’Université de Lettonie, rue Petera 1, Jelgava. Le projet prévoit de mettre en œuvre les activités suivantes:- l’isolation des murs extérieurs;- le remplacement des fenêtres et des portes;- l’isolation du couvercle des greniers, la réparation de la construction du toit et la construction d’un système de protection contre la foudre; — rénovation du système de chauffage et de chauffage;- délocalisation du gazoduc externe;- supervision de la construction et supervision de l’auteur;- gestion de projet;- mesures de publicité.Délai de mise en œuvre du projet — 8 mois.Les coûts totaux prévus — 85 % de financement FEDER — 406 936,01 EUR et 15 % du financement du budget de l’État — 71 812,24 EUR, coûts publics inéligibles — 61 177,20 EUR Indicateurs de rendement: 1) Réduction de la consommation annuelle d’énergie primaire dans les bâtiments publics en 2 019 378,645 MWh; 2) Réduction calculée des gaz à effet de serre en 2019-69.532 tonnes d’équivalent CO2. Résultats estimés: 1) Documentation à l’appui du projet préparé — 3 contrats; 2) Travaux de construction pour le bâtiment — 2 contrats ont été exécutés; 3) Services de supervision de la construction et de supervision de l’auteur — 2 contrats; 4) Des mesures de publicité ont été mises en œuvre, 1 plaque d’information a été installée; 5) la gestion du projet a été assurée pendant 8 mois; (French)
    25 November 2021
    0 references
    Pētera iela 1, Jelgava, LV-3001
    0 references

    Identifiers

    4.2.1.2/18/I/002
    0 references